• Title/Summary/Keyword: Value Engineering analysis

Search Result 6,316, Processing Time 0.04 seconds

A study of the function analysis for the effective campus master plan through value engineering method (효율적인 캠퍼스 마스터 플랜을 위한 설계VE 기능분석 연구)

  • Min, Kyung-Suk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.9 no.3
    • /
    • pp.41-48
    • /
    • 2010
  • It has been found that implementing the function analysis is very important in terms of accomplishing successful Value Engineering(VE), and the function definition is a basic activity at design VE phase. In spite of the importance, the real function analysis activities in the VE are not regard as consequence. In this regard, this paper attempts to use the campus mater plan to lead an effective function analysis. So, the purpose of this value engineering study is to provide the criteria to develop the campus mater plan. This value engineering study used as a guide for the standardization of the campus mater plan. In addition, broader application is possible through the analysis throughout the different ways of the project.

Extreme Value Analysis of Metocean Data for Barents Sea

  • Park, Sung Boo;Shin, Seong Yun;Shin, Da Gyun;Jung, Kwang Hyo;Choi, Yong Ho;Lee, Jaeyong;Lee, Seung Jae
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.1
    • /
    • pp.26-36
    • /
    • 2020
  • An extreme value analysis of metocean data which include wave, wind, and current data is a prerequisite for the operation and survival of offshore structures. The purpose of this study was to provide information about the return wave, wind, and current values for the Barents Sea using extreme value analysis. Hindcast datasets of the Global Reanalysis of Ocean Waves 2012 (GROW2012) for a waves, winds and currents were obtained from the Oceanweather Inc. The Gumbel distribution, 2 and 3 parameters Weibull distributions and log-normal distribution were used for the extreme value analysis. The least square method was used to estimate the parameters for the extreme value distribution. The return values, including the significant wave height, spectral peak wave period, wind speed and current speed at surface, were calculated and it will be utilized to design offshore structures to be operated in the Barents Sea.

Application of The Value Analysis To Redesign Facility Layout

  • Laurent, Eyheraguibel;Jeong, Byung-Ho;Lee, Chan-Gie;Lee, Sang-Young
    • IE interfaces
    • /
    • v.10 no.3
    • /
    • pp.167-177
    • /
    • 1997
  • This paper deals with an application of process value analysis method for a manufacturing process in order to redesign facility layout in a paper company. We have used the value analysis method which permits an overall and rigorous study of process by a functional approach. Firstly, customer's expectations for the future process are clearly and precisely expressed with specifications of the Functional Extern Analysis. The existing process is analyzed using various tool of the Functional Internal Analysis in the second part. From the results of these analysis, we find out that the main problems of current facility are due to scheduling and facility layout. This paper is devoted to resolve the second problem. We suggest an ideal solution in order to have a reference solution. Nextly, We give realistic choices and the final solution for the facility layout.

  • PDF

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

Improvement and Systematization of Pre-Study Work for Design Value Engineering in Construction Projects by Quality Function Deployment (품질기능전개(QFD) 기법을 적용한 건설프로젝트 설계VE 준비단계 업무 개선 및 체계화)

  • Yang Jin Kook;Kim Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.122-132
    • /
    • 2005
  • The importance of design value engineering in construction projects recently is rising, which deal about in reduction of cost and improvement of quality. Especially, From half of this year 2005, It is predicted that the value engineering is necessary to be carried out in the projects having project cost more than 10 billion won. In increasing importance of value engineering, we require a way by which we accomplish value engineering systemically and effectively though it is not common in domestic situation. So, this case study shows a way in carrying out value engineering effectively. As the way is to apply QFD(Quality Function Deployment) in pre-study work of design value engineering, this is expected to contribute as function analysis and reflect the requirement of users or owners.

Analysis of Important Factors for Value Engineering in Highway Construction (도로건설에서 가치공학을 위한 중요인자 분석)

  • 임영문;최요한
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2002.11a
    • /
    • pp.17-23
    • /
    • 2002
  • Value can be defined as function divided by cost. The ultimate goal of VE (Value Engineering) is to simultaneously reduce cost and to enhance function in given projects. In general, there are eight phases (Selection, Investigation, Speculation, Evaluation, Development. Presentation, Implementation, and Audit) to perform VE. This paper presents analysis of important factors for VE in construction fields using QFD (Quality Function Deployment) technique. QFD was introduced in 1972 to help design supertanker in Mitsubish's shipyards in Kob, Japan and formally defined by the American Supplier Institute in 1987 as a system for translating consumer requirements into appropriate company requirements at every stage, from research, through product design and development, to manufacture, distribution, installation, and marketing, sales and services. The objective of this paper is to provide and analyze the trend on the viewpoint of efficient value engineering of field workers. The data are collected by questionnaires. The samples for this study are chosen from 13 companies in Korea during 2 months (2002. 7 ∼ 2002. 8). The results of this study will play an important role not only for the efficient value engineering but also for preparing of life cycle cost analysis.

  • PDF

Two-Dimensional Qualitative Asset Analysis Method based on Business Process-Oriented Asset Evaluation

  • Eom, Jung-Ho;Park, Seon-Ho;Kim, Tae-Kyung;Chung, Tai-Myoung
    • Journal of Information Processing Systems
    • /
    • v.1 no.1 s.1
    • /
    • pp.79-85
    • /
    • 2005
  • In this paper, we dealt with substantial asset analysis methodology applied to two-dimensional asset classification and qualitative evaluation method according to the business process. Most of the existent risk analysis methodology and tools presented classification by asset type and physical evaluation by a quantitative method. We focused our research on qualitative evaluation with 2-dimensional asset classification. It converts from quantitative asset value with purchase cost, recovery and exchange cost, etc. to qualitative evaluation considering specific factors related to the business process. In the first phase, we classified the IT assets into tangible and intangible assets, including human and information data asset, and evaluated their value. Then, we converted the quantitative asset value to the qualitative asset value using a conversion standard table. In the second phase, we reclassified the assets using 2-dimensional classification factors reflecting the business process, and applied weight to the first evaluation results. This method is to consider the organization characteristics, IT asset structure scheme and business process. Therefore, we can evaluate the concrete and substantial asset value corresponding to the organization business process, even if they are the same asset type.

Statistical Analysis of Mechanical Parts Industry in Chungju Region (충주지역의 기계류 산업동향 통계분석)

  • Lee, Hyoung-wook;Park, Sung-jun
    • Journal of Institute of Convergence Technology
    • /
    • v.2 no.2
    • /
    • pp.55-58
    • /
    • 2012
  • The strategic industry in Chungbuk province is the electric and electronic related industry. In the Chnugju region, the trend of major industry have change from the electric and electronic related industry to mechanical parts and components related industry include manufacturing of automobile and transportation. In this paper, we perform statistical analysis using the micro data service provided by the Statistics Korea, The CAGR of the number of employee and value-added value in the electric and electronic related industry during past 7 years are -7.1% and -13.2%, respectively while the CAGR in the mechanical parts related industry are 14.4% and 22.9%, respectively. However, value-added value per value of shipment of the mechanical related industry is lower than that of the electric and electronic related industry.

  • PDF

A Case Study on the Organizational Activities of Value Analysis as Countermeasure Scheme for the Cost Reducement (원가절감대책방안으로써의 VA의 조직적 활동에 대한 사례연구)

  • 이상억
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.4 no.5
    • /
    • pp.73-83
    • /
    • 1981
  • The purpose of value analysis is to assist each to approach nearer enough to this goal to provide substantial competitive and profit advantages. It provides planned and disciplined thought and act ion which hel ps identify unnecessary cost throughout the product or process cycle. Value analysis is a precise, disciplined, one-purpose thinking process. Its one purpose is to retain all the performance and aesthetic factors which now exist In the product, process or services, which the customer wants and is willing to pay for : and through disciplined thinking procedures, to put together Practical alternatives which will accomplish them at still lower cost. Value in a product or service is the reward for appropriate performance and appropriate cost Value analysis must therefore employ techniques which will sensitize any "lacking" area so that the need can be identified and satisfied. As the business begins to see the benefit of the activity, additional value analysts consultants may be added. This will provide more penetration in the three identified areas, of top managers group, individual value analysis consultants and senior member who organizes value analysis work, and besides, additional abilities will be secured.e secured.

  • PDF

The Cost Monitoring of Construction Projects through Earned Value Analysis

  • Waris, Muhammad;Khamidi, Mohd Faris;Idrus, Arazi
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.42-45
    • /
    • 2012
  • In construction industry, the term 'procurement' is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators such as cost monitoring is an ongoing process and its importance cannot be undermined during the project life cycle. It can be monitored by using traditional approach of direct reporting of actual cost against budget. However, the comparison of budget versus actual spending does not indicate the worth of the work which is completed at any given time. This approach does not represent the true cost performance of the project. Because of these limitations, this paper discusses the applications of Earned Value Analysis (EVA) for cost monitoring of construction projects in Malaysia. Besides traditional approach, EVA is a three-dimensional approach that compares three cost indicators i.e. the budgeted value of work scheduled with the earned value of physical work completed and the actual cost of work completed. Therefore, cost monitoring by EVA is an objective measure of actual work performed. This paper uses a case study, an example application of EVA as a cost monitoring tool. This case study reaffirms the benefits of using EVA for project cash flow analysis and forecasting.