Application of Value Engineering to Early Design Phases in Construction Projects (건설사업 설계초기단계 VE 적용방안)

  • Lee Seung-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.156-166
    • /
    • 2005
  • The purpose of this study is to present proper VE application methods to euly design phases. Since VE methodology is more effective on early stage of design phase, the study focused on application of VE methodology in early stage of design process. With the examination of past studies, obstacles of VE application in domestic construction industry are defined. To solve these problems, this paper presents (1) subdivision of VE execution time, (2) an appropriate VE targeting method for construction industry, (3) a resonable and practical function analysis process, and (4) modified design-VE job plan.

Improvement Plan based on Awareness Investigation of Construction VE System in Domestic Construction (국내 건설공사 시공 VE 제도 인식조사에 기반한 개선방안)

  • Park, Jin-Young;Seo, Ho-Hyong;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.79-88
    • /
    • 2018
  • Construction business VE is classified into design stage VE and construction stage VE. The faster the application, the better the effect. Therefore, the design stage VE was legislated in 2000 and actively applied. However, it is urgent to activate the construction VE, which is complementary to the design VE system. In the meantime, we have made a lot of efforts to activate construction VE by suggesting the necessity of construction VE system, improvement of technology development compensation system, concrete implementation method of construction VE, but it was not effective due to lack of related laws. This study compares and analyzes construction VE system in Korea and abroad for the activation of construction VE after recognizing such domestic reality. A survey of experts in each field of the construction industry was conducted and suggestions for improvement of construction VE system suitable for domestic construction industry were suggested.

A Case Study on the VE/LCC for selection on Improvement of Soft Soil Ground (연약지반처리공법 선정을 위한 VE/LCC 사례 분석)

  • Kim, Yong-Deuk;Lee, Young-Dae;Acharya, Nirmal Kumar
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.271-273
    • /
    • 2006
  • Because effect of value elevation is great as it is fast that construction VE is enforcement, VE at the design phase is more and more important more than construction process phase. But, is exerting negative impact for construction process phase by various problem that happen at design phase, and is causing discord to between project partners. Therefore, quality security in design phase is important first of all. Hereupon, this study emphasized that need VE at the design phase of extension plan forward more and more because achieved process that derive conceptional estimation by quantitative value calculating value index (V) through provision of design function point (F) and LCC expense (C) by comparison method of construction and chooses optimum method of construction through VE/LCC analysis example in improvement of soft soil ground method choice process of design phase.

  • PDF

Application of Partnering to Design VE to Public Design-Build Projects (공공부문 일괄입찰사업의 설계VE 파트너링 활용방안)

  • Kim, Hae-Gon;Um, Ik-Jun;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.110-118
    • /
    • 2006
  • Current design-build contract is the type of joint venture, but performs by separate party which causes change orders due to the lack of communication between design and construction, so it cannot lead the main object which is the integration of design and construction. Furthermore, the current design-build contract is impossible to reduce the project costs by VE at the design development phase because the design proceeds with the fixed price through bidding. Like these limitless, the analysis results of the case of VE in the design-build projects, several problems that are prevented from active design VE are elicited by the project participants. Meanwhile, Ministry of Construction & Transportation decided to enlarge the VE review system lately. Therefore, in this study, it presented model of design VE partnering of design-build and partnering agreements form to apply design VE and to try to be able to lead the design VE to be more successful in public design-build projects.

The Research on the Curve of Maintenance Cost from Newly Constructed Steel Box Girder Bridge (최근 가설된 강상자형 교량의 보수.보강 공사비곡선 추정에 관한 연구)

  • Kim, Young-Woo;Shin, Yung-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.553-556
    • /
    • 2009
  • 최근 우리나라의 건설 분야에서는 생애주기비용(Life Cycle Cost;이하 LCC)/가치공학(Value Engineering; 이하 VE)을 적용한 구조물 설계가 실시되고 있다. 이는, 건설교통부에서 공공건설사업의 효율성을 제고하기 위하여 실시하고 있으며, 대통령령에 따라 "건설기술관리법시행령"을 제정하여 공공사업분 수행 절차와 기준을 법제화 하였으며 이후 시행령 38조 13의 "설계의 경제성등 검토" 실시를 의무화하는 시행지침을 작성하여 수행하고 있다. 이러한, LCC/VE의 검토에서 보수 보강 공사비 산정은 유지보수공사 프로파일링을 통한 보수 보강 시기를 산정(건설교통부, 2003)하여 교량 구성요소별 보수 교체 주기를 산정(건설교통부, 2001)에서 제시한 기간을 적용하여 LCC/VE를 평가하고 있다. 하지만, 이러한 보수 보강 공사비의 적용은 일괄적인 적용이며, 예전 국내의 교량 건설기술이 현재와 같이 발전된 상태에서의 현황이 아니므로 본 연구에서는 현재 고속국도에 완공되어 운용중인 교량 구조물을 시설물의 안전관리에 관한 특별법 시행령(2008)에 따른 "시설물의 안전점검 및 정밀안전진단 지침"에 의한 교량의 초기점검, 정밀점검 및 정밀안전진단 자료를 조사 분석하여 보수 보강 공사비 곡선을 추정하려 한다.

  • PDF

Time Series Coastline Change Analysis of Haeundae Beach (해운대 해안의 시기별 해안선 변화량 분석)

  • Lee, Jae One;Kim, Yong Suk;Lee, In Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.5D
    • /
    • pp.655-662
    • /
    • 2009
  • The monitoring for analyzing coastline variations throughout many years is conducted in this study. Haeundae Beach is selected as a test area. We have collected RTK-GPS survey data, airborne LiDAR survey data from Sept. 2008 to 2005. We've done airborne LiDAR survey 2009 to 2006 and we would analyze coastline changes time series through interactive comparison analysis. The mean coastline distance of Haeundae shore is 1,347m (RTK-GPS) by airborne LiDAR survey (2 times). Coastline distance is decreased approximately 4.5% than mean distance in the November survey of 2008. We know right and left sides of the coastline are eroded and the center section shows us the littoral deposit of 3~7m toward sea. It turns out that the sand both sides is transported to the center section by a wave and tide and we know the coastline distance is getting smaller but the coastline width is getting longer like 2~7m.