• Title/Summary/Keyword: VE사례

Search Result 102, Processing Time 0.024 seconds

A Case Study on Developing the Virtual Safety Training System (가상안전 체험관 구축 사례)

  • 기재석
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2001.11a
    • /
    • pp.203-210
    • /
    • 2001
  • In the real environment, it is very limited for the trainees to participate the effective training using actual training equipments by themselves and also to simulate several hazard situations for safety because of the direct exposure to the hazards of the actual system. But the virtual environment(VE) can help the trainees to get the effective training participating by themselves and to simulate all kind of possible situation without the exposure to the hazards of the actual system. In this paper, the nor· developed VE system for safety training is introduced. The system is more effective and economic one than the other system developed in Japan.

  • PDF

A Case Study on Developing the Virtual Safety Training System (가상안전 체험관 구축 사례)

  • 기재석
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.4
    • /
    • pp.35-44
    • /
    • 2001
  • In the real environment, it is very limited for the trainees to participate the effective training using actual training equipments by themselves and also to simulate several hazard situations for safety because of the direct exposure to the hazards of the actual system. But the virtual environment(VE) can help the trainees to get the effective training participating by themselves and to simulate all kind of possible situation without the exposure to the hazards of the actual system. In this paper, the new developed VE system for safety training is introduced. The system is more effective and economic one than the other system developed in Japan.

  • PDF

Development of Function Breakdown Structure of Building Element based on Performance for Idea Connection in Design VE (설계VE Idea 연계를 위한 성능기반 건물 부위별 기능분류체계 개발)

  • Lee, In-Jai;Hyun, Chang-Taek;Son, Myung-Jin;Kim, Dae-Hyun;Kim, Yun-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.12-22
    • /
    • 2011
  • Design value engineering (VE) has been performed in many construction projects according to the changes in the construction for most of the VB function analysis that performed, are problems that focus on function analysis and generating ideas based on individual experience of VE team member than generating ideas and value improvement of systematic function analysis. This may be due to the quotation of previously performed function analysis data, general function analysis, and abstract function definitions that do not cite the concrete characteristics of each facility. Therefore, in this study, the proposed cases from the existing design VE workshops, the current conditions of the connection between functions and ideas and of the idea categorization by building part were studied to determine why functions and ideas are not connected, and to propose pertinent improvement directions. on a performance-based function categorization system by building part that can provide the logical connection between functions and ideas in the function definition/categorization and function arrangement phases in the function analysis phase, the most important phase in VE activities, was developed by reflecting the required performance and functions for each part of the facility.

The Influence Analysis of Value Engineering for the Public Empoyer's Decision Marking - Focused on the Project Life Cycle - (공공발주자 의사결정에 미치는 가치공학(VE)의 영향력 분석 - 프로젝트 생애주기를 중심으로 -)

  • Park, Jongsoon;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.12-20
    • /
    • 2015
  • The public employers are faced the mounting importance of decision process to settle the optimum VE delivery system of such public facilities buildings and etc. The elements of decision process of the public employer are formed in the various relationships of the concerned and when the projects are coming into effect, the decision process in the VE delivery method and the selection of contractor will be the name of the game. The decision process in the VE delivery method and the selection of contractor are created a case to be one and the same as well as initiates a consistency for the performance. However, the function and role of the public employer are projective accordingly to the organization of employer and the employer especially no system is equal to the capability of perfect evaluation and verification of the ability of the employer. Especially the lowest bidder policy that started with justification to increase the competitiveness and technical capability of the contractors through the completion in between contractors has been providing the hotbed for insolvency, irregularity and irrationality as a result. From this point of view it is declared that the buildup the edifice of supporting system in the process of decision to recover the mutual trust and respect of the concerned in the VE delivery system with the technostress and the systematization based on drawing the elements which affect the decision process of public employer.

Case Study on the Improvement of Underground Building Works through the VE (VE 적용에 의한 지하 골조공사 개선연구)

  • Hong Jae-Wook;Kim Sun-Kuk;Lee Jong-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.106-113
    • /
    • 2004
  • Most construction project managers should focus on the reasonable cost-down with same quality and function-enhancement with same cost for the value-added construction project delivery in construction industry. Especially, a building structure construction is one of the most important processes to affect the total cost and schedule in building construction project. It means that the process has the possibility of project cost-down or quality-enhancement among the whole project life-cycle. This research focuses on the importance of underground structure of building project by increasing underground use ratio in the urban building construction projects nowadays. This research adopts VE method for the improvement of cost and time by process and analysis dimension modeling on the underground building structure construction, and verifies it throughout the case study, This research is the basic study on the improvement of underground building works through the value engineering method in construction industry.