• Title/Summary/Keyword: Utility Layout

Search Result 28, Processing Time 0.028 seconds

A Study on Productivity Improvement on Welding Line for Vehicle Fuel Tank using Layout Improvement (레이아웃 개선을 통한 차량용 연료탱크 용접라인의 생산성 향상에 관한 연구)

  • Yoo, Sung-Hee;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.215-221
    • /
    • 2010
  • Many researches and projects are actively implemented in the academic world and industrial world in order to increase the productivity through changing utility layout. Effective layout makes the flow of parts and products go on wheels and helps labor forces and utilities to be used efficiently. In this study, we looked at effect on utility layout change through a case of a company making a fuel tank of vehicle in Korea. Due to the layout improvement, this company could have flowshop system on welding line, so the stock in line was decreased, checking the number of stock became easier than before and it was possible to evaluate exact cycle time per unit. Through not only confirming qualitative effect, but also checking quantitative effect such as UPH(Unit per Hour), we obtained the conclusion that the layout improvement increased the productivity.

Automatic Layout of High Density PLA (고밀도 PLA의 자동 Layout System의 구성)

  • 이제현;경종민
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.22 no.6
    • /
    • pp.13-18
    • /
    • 1985
  • A set of utility programs for automatic generation, minimization and verification of high density PLA layout was developed, which includes equation-to-truth table translator, logic minimizer, PLA product term sorter, file generator for plotting stick diagram, dynamic CMOS PLA layout generator and bipartite row folded CMOS PLA layout generator. Size reduction is performed mainly by logic minimizer and bipartite row folder, and the maximal delay is reduced by sorter. The fOe for automatically generated layout is stored in CIF. Each program was written in Clanguage, and was run on VAX-11/750 (UNIX).

  • PDF

A study on the Improvement of Facility Layout in Locomotive Maintenance Workshop (철도차량 정비공장의 설비배치 개선에 관한 연구)

  • 이상설;안도만;강희정
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.49
    • /
    • pp.89-98
    • /
    • 1999
  • The objective of this study is to develop an improved algorithm for layout problems. Computerized facility layout program was also applied to solve the layout problem in locomotive maintenance workshop. The current facility layout is structured in the large space without considerations of many variable factors. For this reason, effectiveness of layout results in loss on effective space utility. This study is to develop an algorithm in the consideration of importance weight and desirable shape of specific department in the computerized layout planning and quantitative relationship rating between each department was used. Standard process duration of locomotive maintenance workshop was used to select the main activities of locomotive maintenance work. This study could generate more efficient facility layout design to reduce the number of movement frequency and travel distance in maintenance workshop.

  • PDF

Multi-station Fixture Layout Design Using Simulated Annealing

  • Kim, Pansoo;Seun, Ji Ung
    • Management Science and Financial Engineering
    • /
    • v.10 no.2
    • /
    • pp.73-87
    • /
    • 2004
  • Automotive and aircraft assembly process rely on fixtures to support and coordinate parts and subassemblies. Fixture layout in multi-station panel assemblies has a direct dimensional effect on final products and thus presents a quality problem. This paper describes a methodology for fixture layout design in multi -station assembly processes. An optimal fixture layout improves the robustness of a fixture system against environmental noises, reduces product variability, and eventually leads to manufacturing cost reduction. One of the difficulties raised by multi-station fixture layout design is the overwhelmingly large number of design alternatives. This makes it difficult to find a global optimality and, if an inefficient algorithm is used, may require prohibitive computing time. In this paper, simulated annealing is adopted and appropriate parameters are selected to find good fixture layouts. A four-station assembly process for a sport utility vehicle (SUV) side frame is used throughout the paper to illustrate the efficiency and effectiveness of this methodology.

A Study on Facility Layout for Optimamization of Material Flow System (물류시스템 최적화를 위한 설비배치에 관한 연구)

  • Park, Se-Joon;Lee, Young-Hae;Hur, Sun;Lee, Moon-Hwan;Yu, Ji-Yong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.162-165
    • /
    • 1998
  • We consider a facility layout problem for optimized material flow system design in the automated production system design. Existing facility layout algorithm have a weak point that arranged facilities have irregular shape or don't preserve their own shape and size. The proposed algorithm give a layout which is minimize total material handling cost and maximize space utility under preserving each facilities' own shape and size.

  • PDF

Characteristics of Kitchen and Utility Space Plan in Recently Supplied Apartment Housing (최근 분양된 공동주택의 전용면적 규모에 따른 가사작업공간 계획특성)

  • Han, Jeong-Won
    • Journal of the Korean Home Economics Association
    • /
    • v.46 no.8
    • /
    • pp.135-147
    • /
    • 2008
  • This study was to identify the spatial and functional characteristics of kitchen and utility space plan in apartment housing. For this purpose, spatial arrangement and function of kitchen and utility space were analyzed according to the size of apartment unit. The results of this study were as follows; 1) The level of spatial separation among living room, dining room, and bedroom is higher in large-sized apartment. And diverse plans were applied for the kitchen of large-sized apartment. 2) To find out functional characteristics of kitchen space, furniture arrangement was analyzed. The I-type kitchen furniture is dominant for small-sized and medium-small apartment, and L-type furniture for medium-large and large sized apartment. 3) For most of the unit plans utility space is located on the balcony outside the kitchen. 4) Sub-kitchen and laundry are major function of utility space, but in case of balcony extention, the function of utility space is minimized. Recent plans for apartment housing shows various spatial arrangement and functions for kitchen and utility space.

New shipyard layout design for the preliminary phase & case study for the green field project

  • Song, Young Joo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.5 no.1
    • /
    • pp.132-146
    • /
    • 2013
  • For several decades, Asian nations such as Korea, Japan and China have been leading the shipbuilding industry since the decline in Europe and America. However, several developing countries such as India, Brazil, etc. are going to make an entrance into the shipbuilding industry. These developing countries are finding technical partners or information providers because they are in situation of little experiences and technologies. Now, the shipbuilding engineering companies of shipbuilding advanced countries are getting a chance of engineering business against those developing countries. The starting point of this business model is green field project for the construction of new shipyard. This business model is started with a design of the shipyard layout. For the conducting of the shipyard layout design, four kinds of engineering parts are required. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is the foundation of the other engineering parts and it determines the shipyard capacity during the shipyard operation lifecycle. Previous researches about the shipyard layout design are out of the range from the business requirements because most research cases are in the tower of ivory, which means that there are little consideration of real ship and shipbuilding operation. In this paper, a shipyard layout design for preliminary phase is conducted for the target of newly planned shipyard at Venezuela of South America with an integrated method that is capable of dealing with actual master data from the shipyard. The layout design method of this paper is differentiated from the previous researches in that the actual product data from the target ship and the actual shipbuilding operation data are used for the required area estimation.

A Study on the Public Space of Unification Management School Building (통합운영학교 건축의 공용공간에 관한 연구)

  • Yoon, Chun-Keun
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.1 no.1
    • /
    • pp.60-72
    • /
    • 2001
  • This study is show type classification, public space and space layout of unification management school. The type of unification management school classified the elementary and middle unification school, the unifying secondary school, the unifying elementary and secondary school. The result of this study analyze that ideal type is the unifying secondary school Public space of unification management school integrated support and management facilities. Variation and department classroom arc possible common utility. Space layout of unification management-school separate clearly entrance and buildings, Public spaces must be considerate smoothly use that they are located center of buildings.

  • PDF

New business opportunity: Green field project with new technology

  • Lee, Seung Jae;Woo, Jong Hun;Shin, Jong Gye
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.6 no.2
    • /
    • pp.471-483
    • /
    • 2014
  • Since 2009 of global financial crisis, shipbuilding industry has undergone hard times seriously. After such a long depression, the latest global shipping market index shows that the economic recovery of global shipbuilding market is underway. Especially, nations with enormous resources are going to increase their productivity or expanding their shipyards to accommodate a large amount of orders expected in the near future. However, few commercial projects have been carried out for the practical shipyard layout designs even though those can be good commercial opportunities for shipbuilding engineers. Shipbuilding starts with a shipyard construction with a large scale investment initially. Shipyard design and the equipment layout problem, which is directly linked to the productivity of ship production, is an important issue in the production planning of mass production of ships. In many cases, shipbuilding yard design has relied on the experience of the internal engineer, resulting in sporadic and poorly organized processes. Consequently, economic losses and the trial and error involved in such a design process are inevitable problems. The starting point of shipyard construction is to design a shipyard layout. Four kinds of engineering parts required for the shipyard layout design and construction. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is used as a foundation of the other engineering parts, and also, determines the shipyard capacity in the shipyard lifecycle. In this paper, the background of shipbuilding industry is explained in terms of engineering works for the recognition of the macro trend. Nextly, preliminary design methods and related case study is introduced briefly by referencing the previous research. Lastly, the designed work of layout design is validated using the computer simulation technology.

Development of the High Utility Progressive Die for Sheet Metal Forming (Part 1)

  • Sim, Sung-Bo;Song, Young-Seok;Sung, Yul-Min
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2000.10a
    • /
    • pp.228-230
    • /
    • 2000
  • The multiforming progressive die are multiple operations performed by means of a die having above two stages, jon the each of stages performs a different operation as the sheet metal passes through the die hole. In the field of design and making tool for press working, the progressive die for sheet metal (SPC, thickness :2mm) is a specific division. In order to prevent the defects, the optimum design of the production part, strip layout, die design, die making and tryout etc. are necessary. They require analysis of many kinds of important factors, i.e. theory an practice of metal press working and its phenomena, die structure, machining condition for die making, die materials, heat treatment of die components, know-how and so on. In this study, we designed and constructed a multiforming progressive die as a U-bending working of multi-stage and performed try out. out of these processes the die development could be taken for advance. Especially the result of tryout and its analysis become the characteristics of this paper (part 1 and part 2) that nothing might be ever seen before such as this type of research method on all the processes. In the par 1 of this study we treated die design mostly.

  • PDF