This paper proposes the Advanced Generic BOM(AGBOM) which is more flexible BOM system than existing GBOM. The existing GBOM system has the limitation of Result BOM construction and selecting options by choosing only one Variant under given Cluster. In order to overcome this limitation, AGBOM can make more various Result BOM by selecting several Variants under given Cluster. Also, this paper describes UT-AGBOM which can use to rolling stock through constructing urban transit BOM using the proposed AGBOM. The last, this paper describes the various Result BOM examples constructed from Source BOM of UT-AGBOM, such as rolling-stock maintenance BOM, individual car BOM, etc.
This paper discusses the development of a generic train operation model from a set of Korean Urban Transit Regulations such as Regulation for Train Operation of Urban Transit, Regulation for Safety Requirements of Urban Transit and so on. It is to communicate with various stakeholders on urban transit system, and to elicit copious requirements in performance of the urban transit train operation based on the model.
Kim, Young-Kyu;Park, Se-Young;Park, Young-Seok;Chung, Il-Bong;Han, Moon-Seob
Proceedings of the KSR Conference
/
2009.05a
/
pp.612-618
/
2009
Recently the roles of railways about the prevention of global warming caused by greenhouse gases and for low carbon green growth are larger than ever. And the railroad-related research institutions have been active in researching for energy conservation. Especially the urban railroad has been emerged as the best means of transportation compared to the general public transportation systems in punctuality, stability, ecology and etc. In operating the urban railroad system there are various ways for energy savings. In the larger category, One is the hardware aspect according to the structure of the vehicle and the development of control systems. The other is the software aspect which efficient train operation can be made through control of driving patterns and driving diagram. In this paper, there is sense to analyze the result in verifying expectation relation with variable and the use of electric power on this after selecting main variables that can influence to the energy of the train operation in the software aspect. First, after collecting the basic data related to operation(train speed, operating hours, power consumption, the position of stopping station, electrical power system etc.) and according to this, investigating the consumption of the energy of the operation, in the side of energy consumption deducing and analyzing problem, this will be found solutions.
It is expected that standardization framework for urban rail transit system will contribute to more convenient and safe traffic service and ensure higher reliability and availability of urban rail transit rolling stock and infrastructure. Since 1995, Korea Railroad Research Institute has been performing the project for standardization and development of urban rail transit technology to improve performance, safety and operational efficiency. Communication system in urban rail transit consists of various subsystems, such as radio communication system, digital transmission system, integrated monitoring system and broadcasting system and its standardization will be implemented based on these subsystem. Broadcasting system is to provide information related to operation and emergency to passengers and operators. In this paper, we suggest standardization scheme for urban rail transit broadcasting system through analysis on present state of the system.
The ESS(energy storage system, here after) for a DC 1500V was developed in 2009. A ESS was installed on the track of Daejeon HRT in 2010. The advantage of the ESS is that it can save the energy and plus stable the catenary voltage. This paper presents the energy saved by the ESS in Daedong substation. When the ESS is on/off, the field tests are performed.
Since standardization project is composed of complicate system, such as vehicle, signal, electric power and railway, how to build management system of the project has influence on the success of the project for the first stage of the project. The computer system design tool supports to carry out requirement analysis, DB construction, and history and follow-up management efficiently. Therefore, the aim of this study is to investigate the method to optimize schema using computer system design tool.
This paper presented a literature review and investigation analysis results of total 19 present guide book and provisions of maintenance and management system in existing railway bridges to development of urban maglev track structures inspection manual. This research carried out a cooperated research subject 3-1, development a design code and maintenance and management inspection manual for urban maglev track structures, of the Center for Urban Maglev Program. Three types of track structures were includes as a major analytical parameter together with railroad, high speed railroad, subway and light rail transit. Bridges were analyzed a general rules, investigation, evaluation, repair and strengthen method as a key aspect. And rail were analyzed examination and maintenance also. This analysis results show that the track structures evaluation are based on the test and examination results, and repaired or strengthened consideration of deterioration, track irregularity and materials according to provision requirements.
Light Rail Transit (LRT) is optimized vehicle system for complex urban circumstance. LRT systems have many merits such as improved accuracy and safety. There are many LRT systems such as monorail, tram, automated guideway transit, linear induction motor propulsion and so on. These systems have been operated in Japan and other advanced countries. In Korea, local government has many projects to apply the advanced LRT system. But there are no standards regulation, performance test regulation and construction regulation for monorail system, linear induction motor system and tram in Korea. We expect that standardization brings economical construction and safety. The linear induction motor system has been usually applied to subway in Japan and ART(Advanced Rapid Transit) in Canada. In Korea, the linear induction motor system has been adopted for Yong-In LRT and currently under construction. This paper presents signalling system and TCMS(train control and monitoring system) of linear induction motor system.
The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.9
/
pp.1324-1328
/
2013
The reason of train location detection is generally the train interval control between the railway stations and the train path control in the railway station yard in order to avoid train collision. It is very important to know the train location for shortening the train headway, and improving the efficiency of railway maintenance as well as the safe operation of trains. Therefore, the accurate detection of train location is the prerequisite technology in railway signalling system. The track circuit and the wheel sensor of rolling stock have been used to detect the train location widely in urban railway as well as high speed train. The track circuit is continuously monitored by electrical equipment to detect the absence of the train and the tachometer and encoder is used for the wheel sensor to measure the train speed. But speed sensor failures are frequent due to the extremely harsh operating conditions encountered in rail vehicle. The CBTC(Communication based Train Control) system has been used in urban railway system recently. But the installation of CBTC system is very high and the modification of design is difficult. This paper deals with the feasibility of new train location detection method using magnetic sensors.
International Journal of Internet, Broadcasting and Communication
/
v.7
no.2
/
pp.105-108
/
2015
There are a lot of traffic jams in the metropolitan area and the commuting time has been longer nowadays. So the urban people has been interested in the GTX(Great Train Express) project in Korea. The GTX is the train which runs at 200km/h speed in underground tunnels. If the train also operates at high speed in tunnel section, the pressure wave will happen and the uplift force of pantograph may vary abruptly. If the rigid trolley bar system is used in tunnel section, it is difficult to improve the commercial speed of train. In order to improve the train speed in tunnel section, this paper presents the new pantograph concepts which can change the suspension stiffness and deals with the dynamic behavior characteristics of pantograph according to the parameter variation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.