• 제목/요약/키워드: Urban Risk Management

검색결과 247건 처리시간 0.033초

A Model of Risk Management Plan in the Development Phase of Urban Regeneration Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • 제11권2호
    • /
    • pp.35-42
    • /
    • 2009
  • Recently, intensive urban redevelopment concentrated on new towns has reduced the number of settled population, and weakened various functions such as commercial, culture, education and welfare in old towns, and made the stagnation and declination of the entire or some parts of old towns. Urban regeneration project means renewing cities' functions in terms of physical, environmental, social, cultural, industrial and economic aspects or revitalizing the existing functions through improvement project in the entire or part of a city, which is now drawing keen attention from the public. However, urban regeneration project is huge in scale, needs long construction period and various complex facilities, and also characterized by complicated relations with many stakeholders. Due to such characteristics, there are many risks in the project. Therefore, systematic risk management is absolutely necessary to efficiently manage various risk factors inherent in urban regeneration project. The purpose of this research proposes a basic model to establish risk management plan and work process in order to help project participants to perform risk management more systematically and rationally in the development phase of urban regeneration project.

VULNERABILITY ASSESSMENTS AND RISK MANAGEMENT FOR CRITICAL INFRASTRUCTURES FROM HOMELAND SECURITY VIEWPOINTS

  • Chun Nen Huang;Yao-Chen Kuo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.292-301
    • /
    • 2009
  • The employment of risk management theory in Urban Disaster Management System (UDMS) has become an important trend in recent years. The viewpoint of risk management is mainly a comprehensive risk assessment of various internal and external factors, and a subsequent handling of risks. Through continuous and systematic accumulation and analysis of risk information, disaster prevention and rescue system is established. Taking risk management theory as the foundation, Organization for Economic Cooperation and Development (OECD) has developed a series of UDMS in the mega-cities all over the world. With this system as a common platform, OECD cooperates with different cities to develop disaster prevention and rescue system consisting of vulnerability assessment methods, risk assessment and countermeasures. The paper refers to the urban disaster vulnerability assessment and risk management of OECD and the mega-cities of different advanced and developed countries in the world, and then constructs a preliminarily drafted structure for the vulnerability assessment methods and risk management mechanism in the metropolitan districts of Taiwan.

  • PDF

도심지 대심도 터널에서의 리스크 평가 및 안전관리시스템 적용 (Application of risk evaluation and safety management system in urban deep tunnelling)

  • 문준식;전기찬;김영근
    • 한국터널지하공간학회 논문집
    • /
    • 제24권6호
    • /
    • pp.725-744
    • /
    • 2022
  • 도심지에서의 교통인프라 개발이 활발해 지고, 대심도 지하터널을 이용한 도시의 기반시설 확충으로 인하여 도심지 구간에서 대심도 터널시공이 많이 이루어지고 있다. 이에 따라 대심도 터널시공으로 인한 터널안전 문제와 주변 지반 및 구조물의 안전 확보여부는 중요한 이슈가 되고 있으며, 터널시공에 앞서 대심도 터널공사에 따른 리스크를 분석하고 평가하여 리스크 관리를 반드시 수행하여야 한다. 본 연구에서는 대심도 터널과 도심지 터널이라는 특성을 반영하여 터널구간에 대하여 지반조사 자료, 설계 도서, 각종 사전 검토자료 및 시공계획 등을 바탕으로 수직구, 본선터널 및 대단면 터널 정거장 구간의 지하 안전성에 대한 주요 리스크를 분석하고 평가함으로서 수직구, 본선터널과 대단면 터널정거장 구간에 대한 안전리스크를 정량적으로 관리하고자 하였다. 본 연구는 도심지 대심도 터널공사에서 시공시 리스크와 안전 문제를 사전에 검토하는 경우 기본적인 기초 참고 자료로 활용될 수 있을 것으로 기대된다.

도시재생사업의 리스크요인 분류 및 중요도 산정 (Risk Factor Classification and Weight Estimation for Urban Regeneration Project)

  • 조재경;현창택;윤유상;김윤식;차용운
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.89-99
    • /
    • 2012
  • 대규모 복합개발 형태로 추진되는 도시재생사업은 사업의 특성상 사업이 장기화, 참여주체들 간의 갈등요소, 복잡한 인 허가 과정, 잦은 정책변화 등의 리스크요인을 내포하고 있다. 따라서 사업 진행과정 중 발생할 수 있는 수많은 리스크요인들을 사전에 효율적으로 관리할 수 있는 체계적인 리스크관리가 필요하다. 그러나 도시재생사업과 같은 대규모 복합개발사업의 리스크관리는 아직 도입단계로 주로 일회적인 리스크관리계획이 수립되고 있다. 따라서 본 연구에서는 수많은 리스크요인들이 내재된 도시재생사업의 체계적인 리스크 관리를 위하여, 선행연구와 사례분석을 통해 도시재생사업의 리스크요인을 제시하였다. 그리고 도시재생사업의 추진단계에 따라 리스크요인을 분류하고 그에 대한 중요도를 산정하여, 단계별 중점 리스크요인을 제시하였다.

도시재생사업 성과지표와 위험요인 연계 방안 연구 (A Study on the Mapping of Risk Factor with Performance Index in Urban Regeneration Project)

  • 유영정;김선규
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.497-500
    • /
    • 2008
  • 최근 국내외에서 도시재생사업이 활발히 진행되고 있다. 이러한 도시재생사업은 사업주체 및 이해관계자가 다양하고, 복잡하며, 대규모의 긴 생애주기를 가지고 있다. 또한 대부분 입체 복합공간 개발 형태의 메가프로젝트라는 특징을 나타내고 있다. 이러한 대규모의 도시재생사업은 사업수행과정에서 많은 위험요인들이 존재하며, 그와 더불어 효율적이고 지속적인 성과관리가 필요하다. 그러나 국내의 성과관리는 건설업의 특성을 반영하지 못하고 있으며, 위험과 연계된 연구는 미비하다. 그래서 본 연구는 효율적인 성과관리를 위한 위험과 연계된 성과측정지표를 도출하기 위한 기초연구로 맵핑(mapping)을 통해 성과측정을 위한 성과지표와 위험요인을 연계하는 방법을 제시하고자 한다.

  • PDF

Information for Urban Risk Management: the Role of Remote and Close Sensing

  • Hofstee, Paul;Genderen, John van
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2003년도 Proceedings of ACRS 2003 ISRS
    • /
    • pp.162-164
    • /
    • 2003
  • The multi-disciplinary research project Strengthening Local Authorities in Risk Management (SLARIM), initiated by ITC, includes three case study cities in Asia. An important question is: what are the essential data for risk management and how to access such data. The role of common sources (e.g. census data), data derived from remote sensing (high-resolution satellite imagery, aerial photos), and data from close sensing (field observation, including mobile GIS) to acquire essential risk management data will be discussed. Special attention is given to the question of the minimum area and to disaggregating population data. A few examples are given of Kathmandu / Lalitpur, Nepal.

  • PDF

지형공간정보체계에 의한 도시지역 재해위험도 평가 (Disasters Risk Assessment of Urban Areas by Geospatial Information Systems)

  • 유환희;김성삼;박기연;최우석
    • 대한공간정보학회지
    • /
    • 제13권3호
    • /
    • pp.41-52
    • /
    • 2005
  • 오늘날 도시지역은 인구밀집과 건축물의 고밀화로 인하여 자연재해나 인위적 재난이 발생할 경우 대형사고로 확산될 가능성이 매우 높다. 본 논문에서는 지형공간정보체계를 이용하여 도시지역의 종합적인 재해위험도를 평가하였으며, 이를 위해 도시지역 재해위험도를 침수위험도, 화재위험도, 건물붕괴위험도, 대피위험도 등 4가지로 세분하고 재해위험도를 평가하였다. 이러한 재해위험도 평가결과는 각종 도시관리계획을 수립할 때 재해를 최소화 시킬 수 있는 유효한 자료로 활용될 수 있다. 향 후 본 연구의 체계화와 전문성을 위하여 보다 많은 재해요소를 포함하고 관련분야의 전문가가 참여하는 공동연구 수행이 필요하다고 생각된다.

  • PDF

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

도시철도차량 적용을 위한 위험도 매트릭스 개발에 관한 연구 (The Study of Risk Matrix Development for Urban Metro EMU)

  • 김영상
    • 한국안전학회지
    • /
    • 제26권6호
    • /
    • pp.111-117
    • /
    • 2011
  • Risk-based railway safety management has been mandatory in Korea as by relevant laws and regulations enacted since the Railway Safety Act 2004. In particular, the Railway Vehicle Safety Guidance came into effect on Jan 1, 2008 specifies the details of methodology for hazard analysis, risk assessment and safety verification and validation. Fundamentals for success of the risk-based safety management are systematic hazard identification and risk assessment by use of reasonable risk assessment criteria, but the principle of risk-based safety management has not been applied in an effective way to introduction and maintenance of railway vehicle systems because definite risk assessment criteria have not been set down for each railway system or railway network. The purpose of this study is to suggest a risk matrix development principle for risk assessment of domestic urban metro vehicles by analyses of relevant rules and railway operating environment of Korea.

ISM기법을 이용한 도시재생사업 리스크 요인의 상관성 분석에 관한 연구 (A Study on Correlation Analysis of Risk Factors for Urban Regeneration Using ISM method)

  • 박범석;김윤식;한상원;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.192-193
    • /
    • 2013
  • In recent years, risks associated with mixed used development in urban regeneration projects which have actively been implemented have been on the rise due to uncertainties and complexities of those projects. Thus, risk management is needed to effectively manage those risks that may occur during the process of a project. Many studies have contributed to deal with risk management of those projects. These studies, however, have focused main on identification stage and deriving the main risk factors and have limitations on presenting the relationship among those risk factors. Since many risks are interdependent and have multiple effects, the purpose of this study is to present a way(ISM method) to provide a hierarchical structural framework of risks in Urban Regeneration. The structural of risks can helps decision makers to trace the actual source of these risks.

  • PDF