• 제목/요약/키워드: Urban Redevelopment Project

검색결과 80건 처리시간 0.023초

도시정비사업지구의 거주자 재입주 선택 특성에 관한 연구 (A Study on the Characteristic of Resettlement Decision in Urban Redevelopment Project District)

  • 손영웅;김승운;이주형
    • KIEAE Journal
    • /
    • 제12권1호
    • /
    • pp.11-19
    • /
    • 2012
  • The subject of this study is capital area including Seoul and Incheon, and metropolitan area including Daejeon and Busan among urban redevelopment project district that are currently promoting urban redevelopment project. Data for analysis is implemented collected through visiting each households in project district. Resettlement decision characteristics are analyzed with considering householder's characteristic, house member's characteristic, residential space's characteristic, and area characteristic of families residing in urban redevelopment project area. Through researching characteristics and preferences of residents in project area by urban redevelopment business, improvement were found and implications were provided. Consequently, there are many factors to consider resettlement when deciding household's resettlement when deciding on household's resettlement after the redevelopment project depending on household's characteristics. So, political methods are needed to accomplish urban redevelopment project by resident's position through characteristic and preference survey of resident on project district. Therefore, the study can be utilized as basic data that considers characteristic of each households and region when establishing house policy in order to correspond to housing market that satisfies future consumer's demand.

도시재생사업의 특성을 고려한 문제점 분석 (Problem Analysis Considering Property of Urban Redevelopment)

  • 강현구;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.531-535
    • /
    • 2008
  • 도시재생사업은 수평적으로 분산된 기능을 수직적으로 통합하고 입체적으로 재구성하는 것으로 하나의 사업안에 수많은 프로젝트들이 포함되어 있어 기존과 프로젝트 매니지먼트와는 많은 차이가 있다. 본 연구는 이러한 도시재생사업의 특성을 고려하여 성공적인 도시재생사업의 수행을 위한 방안의 제시에 목적이 있으며 이를 위하여 도시재생사업의 특성, 문제점, 해결방안을 모색하였다. 변화하는 도시재생 패러다임에 부합하지 못하는 현재의 도시재생사업의 문제점을 분석하였다.

  • PDF

도시재개발.재건축의 규제완화와 개발사업 "비전" (The Vision of Urban Redevelopment & Reconstruction and the Policy of Deregulation)

  • 정무용
    • 기술사
    • /
    • 제41권4호
    • /
    • pp.24-31
    • /
    • 2008
  • How to do redevelopment & reconstruction project of the old city in the seoul metropolitan policy? Focusing on the vision of future urban development that it will be necessary to divert from problem of regulation to policy of deregulation. After the redevelopment & reconstruction policy is improving as soon so possible that it must be reflected urban development project.

  • PDF

Otemachi(大手町) Sequential Urban Redevelopment Project

  • Itoh, Toshio
    • 토지주택연구
    • /
    • 제8권2호
    • /
    • pp.83-89
    • /
    • 2017
  • Otemachi(大手町) is the region where it plays a pivotal role in Japanese economy as representative head offices of companies including financial insurance, general trading, information and communication newspaper media are concentrated. However, regenerating the entire region from worn-out infrastructures of buildings and city into the fresh and vibrant foothold in international business was the problem to be solved. In this situation, was examined on the basis of administrative agencies and relevant enterprises to reconstruct office buildings in phases without ceasing business functions and activities by utilizing the large-scale vacant land occurred from the relocation of the national public institutions. The independent administrative institution 'Urban Renaissance Agency(UR)' has completed the examination of industrialization and participation request for the commencement of the project. In this article, The overview of , the new form of project promoted and cooperated by officials and people, is introduced by UR (Urban Renaissance Agency) reorganizing the land exchange and infrastructure through the land readjustment project, and at the same time, procuring capital and building office buildings in solidarity with private development enterprises and financial institutions.

도시정비형 재개발사업에서 공공참여에 의한 관리처분 및 원가정산 혼용 시행방식에 관한 고찰 (A Study on the Mixed Implementation Method of Management Disposition and Cost Settlement by Public Participation in Urban Renewal Type Redevelopment Projects)

  • 문명렬;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.254-255
    • /
    • 2021
  • The urban renewal type redevelopment project is a project to improve the urban environment for the recovery of urban functions and revitalization of commercial districts in commercial and industrial areas. Urban regeneration projects are not progressing smoothly. The urban renewal type is not so for landowners, who require a high level of professional knowledge and experience to carry out smooth projects. In addition, the core part of business conflicts can be seen as the problem of management and disposal methods. Therefore, as landowners, etc. become the actual subjects, the public will take charge of project execution, but all development gains and losses will be attributed to the owner of the land, etc.

  • PDF

SUCCESS FACTORS FOR URBAN REGENERATION PROJECT

  • Hae-Rim Kwon;Seul-Ki Lee;Jung-Ho Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1515-1520
    • /
    • 2009
  • Objective of Urban regeneration project is a recovery of urban utilities through a physical, environmental, cultural, industrial and economic regeneration. The current paradigm of urban regeneration is not a simple redevelopment as physical redevelopment or improvement. Urban regeneration project is an overall development including a central commercial capacity and business capacity for administration and management, cultural facilities, sightseeing, a residential area. So Urban regeneration project include a various project. Project management of Urban Regeneration project is widely different with general project management. For that purpose, this research would offer to contribute the success factors of urban regeneration project for successful project. For offering these, this research analyzed the properties of urban regeneration project and success factors of construction project by reviewing a literature. The principal characteristics are variety objectives of each district of urban regeneration project, a diversity of stakeholder's objectives and complex structure of stakeholders, an unstructured decision-making system, a lack of plan for business cooperation. We abstracted factors for urban regeneration from brainstorming and verification by experienced experts. We suggest 2 factors related to achieving a goal effectively and 10 factors related to progress of urban regeneration project efficiently.

  • PDF

도심재개발사업의 타당성 분석 요인에 관한 연구 (A Study Factor of the Feasibility Analysis in Urban Redevelopment Project)

  • 주재영;김선국;한충희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.347-352
    • /
    • 2001
  • 도심재개발 사업은 도시의 쇠퇴해진 기능을 회복하고 토지이용을 높이기 위하여 시행되는 사업이나 다양한 참여주체와 이 주체들간의 상이한 기대목표, 도심지라는 지리적 위치로 인한 고지가, 고 밀도 개발요구, 장기간의 사업기간, 막대한 자금의 소요 등은 타당성 분석을 어렵고 복잡하게 만든다. 이러한 도심재개발사업의 특수성 때문에 타당성 분석에서 다루어야 한 요인들이 다양해지고 신뢰 있는 분석이 요구되나, 타당성분석의 어려움으로 인하여 도심재개발 사업의 미 착수, 사업중단, 사업지연의 상황을 발생시키고 있다. 따라서 본 연구에서는 도심재개발 사업의 타당성 분석에서 반드시 다루어야 할 경제/재무 관련요인, 법적/제도적 관련요인, 시장관련요인, 기술적 관련요인, 갈등관계 관련요인 등5개 범주로 분류되는 총45개의 요인을 문헌고찰, 사례연구, 실무전문가 면담 등을 동하여 정립한 후 관련전문가의 설문조사 분석을 통하여 주요요인을 제시함으로써 도심재개발 사업의 타당성 분석에 도움을 주고자 한다.

  • PDF

도시하천경관복원 접근방법에 관한 고찰- 청계천 복원사업을 사례로 - (A Consideration on the Approach of Urban Stream Landscape Restoration - The Case of the Chungkye Stream Restoration Project -)

  • 신동훈;이규석
    • 한국조경학회지
    • /
    • 제32권4호
    • /
    • pp.39-48
    • /
    • 2004
  • In the 1960s, polluted urban streams were covered and paved in concrete. Rivers became sewers buried under road. As a result, wildlife habitat was lost and the open stream space was gone. In the 1990s, there was a movement for restoring urban streams to enhance the quality of life of inhabitants. Chungkye Stream, whose covering began from early 1950s and ended in 1977, is now in the process of restoration together with the Central Business District (CBD) Redevelopment Plan. However, as the construction proceeds, several problems were raised, and serious controversies resulted. Therefore, this study aims to investigate the validity of the approach of the Chungkye Stream Restoration Project through a literature survey and a site survey, and to present the improved alternative. Ultimately, the study aims to contribute to present references or guidelines for similar urban stream restoration projects. The Chungkye Stream Restoration Project has some of the following problems. First, the construction should be done based on the long-term urban redevelopment plan. Second, the construction period should be extended to restore urban streams. Third, the cultural asset conservation plan should be implemented. In order to fulfill the anticipated purpose, the above mentioned problems need to be solved.

A Model of Risk Management Plan in the Development Phase of Urban Regeneration Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • 제11권2호
    • /
    • pp.35-42
    • /
    • 2009
  • Recently, intensive urban redevelopment concentrated on new towns has reduced the number of settled population, and weakened various functions such as commercial, culture, education and welfare in old towns, and made the stagnation and declination of the entire or some parts of old towns. Urban regeneration project means renewing cities' functions in terms of physical, environmental, social, cultural, industrial and economic aspects or revitalizing the existing functions through improvement project in the entire or part of a city, which is now drawing keen attention from the public. However, urban regeneration project is huge in scale, needs long construction period and various complex facilities, and also characterized by complicated relations with many stakeholders. Due to such characteristics, there are many risks in the project. Therefore, systematic risk management is absolutely necessary to efficiently manage various risk factors inherent in urban regeneration project. The purpose of this research proposes a basic model to establish risk management plan and work process in order to help project participants to perform risk management more systematically and rationally in the development phase of urban regeneration project.

도심지 소규모 재개발·재건축공사시 흙막이가시설 사고예방을 위한 건설사업관리 방안 연구 : 상도유치원 붕괴사고 중심으로 (A Study on the Management of Construction Project for Preventing Accidents of Reclamation : basic on the collapse of Sangdo Kindergarten)

  • 오세길;박주문
    • 도시과학
    • /
    • 제8권1호
    • /
    • pp.33-44
    • /
    • 2019
  • The purpose of this study is to investigate the cause of repeated accidents through the investigation and analysis of the collapse cases of domestic earthquakes in order to prevent the earthquake disaster in the urban redevelopment and reconstruction. It is designed and constructed to draw out various problem factors and to find solutions to these problems. And the contents related to various laws and systems of the construction project management stage. Especially. In the management of the construction management centered on the safety management and quality control of the technical aspect design, supervision, construction phase through the cause of the accident and improvement measures based on the investigation report of the collapse of the construction site near Sangdo Kindergarten in Seoul. Supervisor. And constructors should be settled on the responsibility and responsibility of God. In order to achieve the purpose of the project, a system is established to link worker-centered occupational safety and health management with technology-based safety construction management, and analysis of how the quality control of the earthquake prevention affects safety construction management The purpose of this study is to prepare the optimum management plan of construction business.As a result of this study, it is aimed to accomplish the purpose of small scale redevelopment and reconstruction construction project by providing optimization method in the stage of construction project management in order to prevent collapse caused by differences in design,Is expected.