• Title/Summary/Keyword: Urban Development Project

Search Result 590, Processing Time 0.029 seconds

A Study on Structural Characteristics of US Urban Development Project and Flexibility of Crisis Response -Focusing on A Comparative Analysis of Hudson Yard and Yongsan International Business District Development- (미국 도시개발사업의 구조적 특징과 위기대응의 유연성 연구 -허드슨 야드 개발의 위기극복 과정을 중심으로-)

  • Lee, Woo-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.80-87
    • /
    • 2017
  • In the past, the United States has been engaged in large-scale urban development projects as a tool for urban regeneration to revitalize distressed urban areas. On the other hand, large-scale urban development projects have been stalled or discontinued globally since the 2008 economic crisis. Despite this, the Hudson Yard development, which is the subject of this study, has resumed smoothly due to the characteristics of its development structure and rational negotiation process. Most domestic developments depend on the economic circumstances, and the problems that are exposed in a privately led development are repeated; the Yongsan International Business District Development is a representative failure case. This study examined the characteristics of the business structure and the nature of the negotiation process in the Hudson Yard development project in New York City.

Development of EMS Type Urban Transit Maglev System (상전도식 도시형자기부상열차(UTM-01) 개발현황)

  • Jo, Heung-Jea;Yu, Mun-Hwan;Kim, Bong-Seop
    • 기계와재료
    • /
    • v.11 no.2 s.40
    • /
    • pp.111-118
    • /
    • 1999
  • Test Results and Status of development of the urban transit maglev system(UTM-O1) are reported. Maglev Project Team in KIMM, in cooperation with Hyundai Precision Company and the Korea Electrotechnology Research Institute(KERI), has successfully finished the second stage development project (1995. 5-1998. 8) and demonstrated a prototype two vehicle consisted urban maglev train operating in the speed range of 50km/h. In this paper, we report various test results of the UTM-01 system, present status of quo and future prospect, and what have been done so far to improve the performance of the maglev system overall.

  • PDF

Plans to Improve Smart Village and Its Challenges (스마트 빌리지, 그 계획과 도전)

  • Eom, Seong-Jun;Kim, Sang-Bum;Cho, Suk-Yeong;An, Phil-Gyun
    • Journal of Agricultural Extension & Community Development
    • /
    • v.27 no.4
    • /
    • pp.173-184
    • /
    • 2020
  • Is the Fourth Industrial Revolution a revolution for cities only? Through the Fourth Industrial Revolution, Korea has entered quickly in the influence area of intelligent information technology such as IoT, AI, Big data, Cloud, ICT, Digital twin. However, as the information gap between the rural zone and the urban zone worsens, a policy was needed to reduce such a gap. Therefore, this research analyzed EU's smart village project, and investigated the problem and improvement of the actual smart village through the interview and field study with the person in charge of the actual smart village project in Korea. Based on the analytic result, 5 plans were deduced to improve Korea's smart village project. First, make the realistic adjustment of project period to assure the sustainability of smart village; second, make the new establishment of the department in charge of smart village project; third, construct the system of integrating and cooperating the policy that can embrace all the rural zone and the urban zone; the fourth, expand the application area of customized ICT technology according to the new rural policy environment; and finally introduce the residents' capacity development project through the rural guidance project.

Optimisation of Infrastructure within the Melbourne Urban plan

  • Koorosh Gharehbaghi;Vincent Raso
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.299-303
    • /
    • 2011
  • Congestion is a growing concern of many global cities and the demands on Infrastructure services within a locale coupled by the rising expectations from the growing population places stress on these cities. This entails the ability to build a sustainable community that requires an understanding and recognition of Population growth, changing demographics and the ever changing urban development on both a macro and micro level. Infrastructure is an integral part of Australian economy, particularly the 'Infrastructure Assets Management' which highlights the importance towards the development of sustainable communities for Melbourne's future. Melbourne 2030 is a comprehensive representation of government's response to a wide-ranging population growth within Melbourne metropolitan and surrounding areas. Urban plan and specific Infrastructure Assets Planning needs not only to provide sufficient Infrastructure to a community, but it must also be efficient and innovative so that it produces an optimised management system. A system that incorporates engineering techniques that will be sustainable for decades to come by maintaining an acceptable level of services to its intended community in an effective manner, which also strengthens service delivery. The fundamental challenges for optimization of Infrastructure with the Melbourne urban plan is, the ability to manage and sustain maintenance of Infrastructure to provide the acceptable level of service required by the community in a most effective manner which also strengthens service delivery to contribute towards Melbourne 2030. This paper particularly investigates some of the fundamental issues within the Melbourne urban plan such as Infrastructure Asset Management, AusLink and the Australian Road Management Act 2004, which the Governments at all levels must deal with to provide an economically viable solution to the changing Infrastructure so it may suits the needs and services the strategies of a metropolis.

  • PDF

A Study on the Reset of Examination Criteria for Energy Use Plan through Consultation Case Analysis (협의 사례 분석을 통한 에너지사용계획 검토기준 재설정 연구)

  • Suh, Kwang-Soo
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.4
    • /
    • pp.59-69
    • /
    • 2013
  • The Consultation about Energy Use Plan is prescribed by the Energy Use Rationalization Act. In order to reset Examination Criteria for Energy Use Plan, consultation case analysis from 2001 to 2010 were carried out and National Energy Master Plan was reviewed. This study proposes that Examination Criteria for Energy Use Plan be should divided into Urban & Tourism complex development project and Industrial complex development project for the prevention of civil complain. Also predicts that effect of energy savings calculated by Reset Examination Criteria on $1^{ST}$ energy demand BAU at 2030 is 2.2%, effect of new & renewable energy utilization at 2030 is 3% and the rate of $CO_2$ reduction to greenhouse gas emission BAU at 2020 is 1.1%.

A Development Case on the Healthy Urban Planning in a Urbanrural Complex Area (일개 도농 복합지역의 건강한 도시계획 개발 사례)

  • Koh, Kwangwook;Yun, Youngsim;Kim, Heesuk;Shin, Yonghyun;Kim, Hyunjun
    • Korean Journal of Health Education and Promotion
    • /
    • v.31 no.5
    • /
    • pp.159-166
    • /
    • 2014
  • Purpose: In spite of many Healthy Cities projects in Korea, there are few research about healthy urban planning. So we tried to use available recent models to a Healthy Cities project in a medium sized city in Gyeongnam province. Methods: Using mainly European Healthy Urban Planning Model and opinion leader survey, SWOT analysis, forum and discussion have been done to a city. Secondary city health indicator obtained from Ministry of Statistics. Results: There are strong need to develop health industry, green traffic and healthy living from survey using Healthy Cities policy direction of Korean Health Promotion Fund. Among the Healthy Urban Planning objectives, improvements of physical environments, prevention of accidents and crime, improvements of healthy esthetics rated highly. Although environmental pollution was problem local government push forward to the pilot healthy urban project as active healthy water-front development. Considering secondary healthy city indicators, change of external forces and internal capacity final task for healthy urban planning for Yangsan city were development of riverside physical education park and active living and anti-ageing environments etc. Conclusions: Comprehensive assessment and plan was possible through MAPP Model using European Healthy Urban Planning objectives to draw the direction of future urban planning for Healthy Cities Projects. Further research and formal introduction would be needed.

The Natures of urban Growth and newly Developed Districts of Taegu(I) - Urban Growth and Land Development in newly Developed Districts - (대구시의 도시성장과 신시가지 지역 특성에 관한 연구(I) - 도시성장과 신시가지 개발을 중심으로 -)

  • Jin, Won-Hyung
    • Journal of the Korean association of regional geographers
    • /
    • v.8 no.3
    • /
    • pp.295-313
    • /
    • 2002
  • While the growth of Taegu has occurred through the land readjustment project, the public sector development project and the construction of roads, its growth pattern has been shaped by physical constraints such as mountains, streams and rail roads. The processes of urban growth of Taegu are classified into four stages: the stage of urban embryo in the Chosun Era; the formation stage of the basic urban system after the Japanese Colonial Era up to 1960; the stage of urban growth in the industrialization period from 1960s to 1980; and lastly, the stage of urban expansion and maturation, with construction of extensive newly developed districts, after the 1980s. Since its promotion to a metropolitan city with the inclusion of Seongseo, Wolbae, Gosan, Ansim and Chilgok in 1981, those regions have grown into newly developed residential districts, with its accompanying high density and high rise apartments complexes, through the public sector development project. These newly developed districts are located about six to seven kilometers away from CBD of the city along with main radial roads. The sites are also located on the route of the fourth belt way of the city. While the Sangin, Seongseo and Jisan Beommul newly developed districts have developed contiguously with the existing built-up areas, the Siji and Chilgok districts have developed separately by the green belt and the Geumho River, respectively.

  • PDF

A Study of Private Development of Long-Term Unexecuted Urban Parks through a Special Act - Difficulties and Solutions of Pohang - (장기미집행 도시공원의 특례법에 따른 민간공원사업 특성연구 - 포항시의 사업추진 어려움과 해결방안 -)

  • Ahn, Byungkuk;Koo, Chamun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.25 no.1
    • /
    • pp.1-8
    • /
    • 2023
  • This is a case study of private sector's development of long-term unexecuted urban parks in Pohang through a special act, which provides a guideline of 30% of land for non-park while 70% of land for park. The strategy has a lot of validity in many respects along with the urban planning sunset system, but even with the special act it would not easy to be implemented in Pohang, where the guideline has been modified to 20% for non-park, mostly multi-family housing projects while 80% for park. Thus, participation of private companies would be discouraged due to low commercial validity. Also, there would exist various risks because the project would be completed through a long-term decision-making and execution process. Thus, this study argues that it would be better for Pohang to follow the original guideline of the government for better implementation of the projects, along with preparation of a law with which the government be able to recoup excess profits when too much profits would be given to private developers. For the project implemented smoothly, it is also important to understand local housing market and fluctuating economic conditions, and to prepare various incentives for private companies. In addition, to secure publicity, guidelines on the level of publicity of the project should be prepared through negotiation by parties to prevent the project being discouraged too much.

Development Process of Activities about Urban and Rural Interchange and Its Characteristics for Making Continuous Profit in Underdeveloped Rural Village -The Case of Cheonjang-ri(Alps village), Mount Chilgab-Region in Comprehensive Rural Village Development Project- (낙후농촌의 지속적 수익 창출 위한 도농교류활동 개발 전개과정과 특징 -농촌마을종합개발사업 칠갑산권역 천장리(알프스마을)을 사례로-)

  • Kim, Du-Han
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.2
    • /
    • pp.35-49
    • /
    • 2013
  • The study area is Cheonjang-ri, also called Alps village, making continuous profit after performing Comprehensive Rural Village Development Projects. This study aims to determine the development process of activities about urban and rural interchange and its characteristics for making continuous profit by residents themselves. A focus on thinking about the process is necessary to make activities in order to achieve continuous profits in the underdeveloped rural village by residents themselves. As a result of this study, Alps village has developed new activities, improving problems which are encountered on the development process of activities. And, Alps village has developed new activities by linking them with previous activities. To improve problems, Alps village has made an effort by itself and cooperated with the subject, both inside and outside of the village. This way has been effective for increasing the number of visitors in village. Increasing the number of visitors in village has been effective in making a continuous profit. Also, continuing to make new activities in order to substitute previous activities including problems has been effective to increase profit.

The Problem on Urban Regeneration of Korea (우리나라 도시재생의 과제)

  • Baek, Seung-Gwon;Kim, Jong-Hwan
    • Journal of the Korean Professional Engineers Association
    • /
    • v.41 no.4
    • /
    • pp.32-37
    • /
    • 2008
  • This Report intends theoretical background of urban planning, related national law system and instances to be researched and concluded as follows below and also to be shared with planners working in the field of urban planning technique services. Revision of new laws and systems are necessary for the reasonable Urban Regeneration promotion through comprehensive and systematic supporting composition revision. For the reason hereafter urban regeneration shall be various and inclusive in society, economy, culture, environment, resident participation. etc., the development model for regeneration project complying with Korean Urban Regeneration condition is required. Diversity and flexibility through governance system are required to ensure city competitive power.

  • PDF