• Title/Summary/Keyword: Urban Development Project

Search Result 590, Processing Time 0.03 seconds

Test Bed Application and Site Analysis to Apply Intelligent Unit Technology

  • Nam-Kyun Kim;Kyu-Shick Lee;Byung-Sun Yoo;Mu-Wook Pyeon;Jae-Sun Park;Jong-hwa Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1553-1558
    • /
    • 2009
  • Give high priority to the technologies that can be directly applicable to the U-City development projects which are in progress by many central and local governments. Create a real world product at the end of R&D phase by testing prototypes in test-beds or test-labs. Recently, new construction technologies have been developed, but they are rarely being applied to the construction filed. In this paper, the basic design was examined so that various technologies can be selected through a test-bed, analyzed for the real situation, and applied to actual construction sites. Improve productivity of regional and urban construction exercises and improve competitiveness of related products and services using IT-based telemetering/GIS technology.

  • PDF

The Policy Implications of Port Redevelopment and Urban Regeneration Experiences of Advanced Countries (선진국 항만재개발과 도시재생사업의 경험과 정책적 시사점)

  • Jin, Young Hwan
    • Journal of the Korean Regional Science Association
    • /
    • v.31 no.1
    • /
    • pp.83-101
    • /
    • 2015
  • This paper examines port redevelopment and urban regeneration projects of foreign advanced countries and investigates policy implications to apply to Korean port cities. Busan and Incheon have started to redevelop old port facilities located near old city centers and they have been faced several problems. Significant findings are found from the experiences of Inner Harbor in Baltimore, Darling Harbor in Sydney, Hafencity in Hamburg, Eastern Dockland in Amsterdam and Minatomirai 21 in Yokohama etc. At first, port and city have to be integrated to an unique regeneration project in order to solve the spatially disconnected problems originated from separate development in the initial stage. Preservation of historical regional assets is highly recommended to characterize its own value which is emphasized in the age of post modernism. Accurate and consistent design guidelines of port cities are stressed to build high standard cities. In the perspective of investigating a new business model, anchor facilities and place marketing strategies are introduced to induce more people to the place specially in the beginning stage. In addition, creative financing methods and competent implementing bodies are emphasized to running the projects stably regardless of real estate market status.

Consideration of the Spatial and Physical Planning and the Role of Participants for Ubiquitous City (u-City의 공간개념과 도시건설의 주체별 역할)

  • Choi, Bong-Moon
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.1
    • /
    • pp.438-445
    • /
    • 2009
  • Recently, the concern of ubiquitous City(u-City) in each level of governments is on the increase, and they are professing themselves to follow the u-city concept on constructing new urban development or urban renewal project. But the u-city plan and construction proceed as the simple sets of advanced technology without fundamental space concept or space plan of the u-city. Therefore, the u-city as a citizen's living space and a basic urban environment is defined in this article, the viewpoint of the space plan and the recent trends of u-city in korea are reviewed. On the basis of this review, this article proposed an approach of the spatial plan for a u-city construction, here the approach consisted of the 3 stages of planning, constructing, and maintaining of the u-city, and finally the role of the participant in the each stage and spatial hierarchy was proposed.

Application of the Fuzzy Models for the Efficient Operation of Pumping Station (배수펌프장의 효율적인 운영을 위한 퍼지모형의 적용)

  • Kim, Yun-Tae;Shim, Jae-Hyun;Chung, Jae-Hak;Ahn, Jae-Chan
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.3 s.14
    • /
    • pp.51-60
    • /
    • 2004
  • Urban flood damage has been caused by drainage deficiency. One of the methods to solve this problem is to construct detention basin and Pumping station and to pump out the water to the river. However, because of rapid urbanization, the capacity of drainage pipelines is sometimes not sufficient enough during the rainy season. Therefore, even though we have enough pumping stations, the inflow of surface water never reaches to the detention area, causing floods in urban area. This research is to find improvement of urban drainage system, estimating drainage pipeline risk. Also, eight models for a computer program were developed for practical use. The models were verified changing precipitation duration, intensity, design period, time distribution model, and etc. This verification was processed focusing that the model can regulate the water level in the detention basin and minimize the effect downstream. As a result Fuzzy models were found to be efficient to lower the water level in detention basin, and decreased about 8 cm in water level of downstream.

Linking LOD and MEP Items towards an Automated LOD Elaboration of MEP Design

  • Shin, Minso;Park, SeongHun;Kim, Tae wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.768-775
    • /
    • 2022
  • Current MEP designs are mostly applied by 2D-based design methods and tend to focus on simple modeling or geometry information expression such as converting 2D-written drawings into 3D modeling without taking advantage of the strength of BIM application. To increase the demand for BIM-based MEP design, geometric information, and property information of each member of the 3D model must be conveniently linked from the phase of the Design Development (DD) to the phase of Construction Document (CD). To conveniently implement a detailed model at each phase, the detailed level of each member of the 3D model must be specific, and an automatic generation of objects at each phase and automatic detailing module for each LOD are required. However, South Korea's guidelines have comprehensive standards for the degree of MEP modeling details for each design phase, and the application of each design phase is ambiguous. Furthermore, in practice, detailed levels of each phase are input manually. Therefore, this paper summarized the detailed standards of MEP modeling for each design phase through interviews with MEP design companies and related literature research. In addition, items that enable auto-detailing with DYNAMO were selected using the checklist for each design phase, and the types of detailed methods were presented. Auto-detailing items considering the detailed level of each phase were classified by members. If a DYNAMO algorithm is produced that automates selected auto-detailing items in this paper, the time and costs required for modeling construction will be reduced, and the demand for MEP design will increase.

  • PDF

Optimizing Urban Construction and Demolition Waste Management System Based on 4D-GIS and Internet Plus

  • Wang, Huiyue;Zhang, Tingning;Duan, Huabo;Zheng, Lina;Wang, Xiaohua;Wang, Jiayuan
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.321-327
    • /
    • 2017
  • China is experiencing the urbanization at an unprecedented speed and scale in human history. The continuing growth of China's big cities, both in city land and population, has already led to great challenges in China's urban planning and construction activities, such as the continuous increase of construction and demolition (C&D) waste. Therefore, how to characterize cities' construction activities, particularly dynamically quantify the flows of building materials and construction debris, has become a pressing problem to alleviate the current shortage of resources and realize urban sustainable development. Accordingly, this study is designed to employ 4D-GIS (four dimensions-Geographic Information System) and Internet Plus to offer new approach for accurate but dynamic C&D waste management. The present study established a spatio-temporal pattern and material metabolism evolution model to characterize the geo-distribution of C&D waste by combing material flow analysis (MFA) and 4D-GIS. In addition, this study developed a mobile application (APP) for C&D waste trading and information management, which could be more effective for stakeholders to obtain useful information. Moreover, a cloud database was built in the APP to disclose the flows of C&D waste by the monitoring information from vehicles at regional level. To summarize, these findings could provide basic data and management methods for the supply and reverse supply of building materials. Meanwhile, the methodologies are practical to C&D waste management and beyond.

  • PDF

The Development of Urban Metro Maintenance Facility System Using Construction Classification System Management (공종분류체계를 활용한 도시철도 시설물 유지관리시스템 개발)

  • Hyun, Ji-Hun;Yang, Byong-Soo;Moon, Sung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.69-77
    • /
    • 2012
  • The construction data should be controlled from the life-cycle perspective. The current PMIS (Project Management Information System) usually focuses on the construction operation stage. The PMIS does consider the utilization of the construction in the maintenance of constructed facilities. This paper tries to interface the construction data with the maintenance data for effective use of construction data in the life-cycle perspective. To achieve the research objective, a maintenance breakdown structure is established and connected to the work breakdown structures. The connection of the two breakdown structures provide a structured utilization of construction data for efficient maintenance work activities. A prototype suggests that the interface of maintenance and work breakdown structures can help provide a construction and maintenance data in a more efficient way for maintenance activities.

A Study on the Development of Design Indicator and User Participation Design for Green Remodeling of School Facilitiess (학교시설의 그린리모델링을 위한 디자인지표 개발 및 사용자참여설계 활용에 관한 연구)

  • Kim, Eun-Hee;Ryu, Soo-Hoon
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.24 no.3
    • /
    • pp.3-13
    • /
    • 2017
  • This study has developed a design indicator required to promote green remodeling in school facilities. And, implemented the green remodeling pilot test on the school facilities that are planning actual remodeling. This pilot test suggested user participation design methodology such as verification of the developed design indicator, design goal setting, evaluation and adjustment of design proposal. The Green Remodeling Design Indicators were classified into 3 large categories of architectural performance, usability, and design through analysis of cases related to 'green buildings' and 'remodeling'. We have developed nine middle categories such as architectural and structural performance, facility performance, environmentally-friendly, circulation, space, amenity, harmony with surroundings, form and symbolization. In addition, 42 detailed indicators were developed for each category, including general, functional, and special indicators. For the verification of this study, two green remodeling design workshops were conducted for Gwangju J elementary school. The first design workshop presented the importance of the design indicator and set the goal of the design plan of green remodeling for project. And, the second Workshop presented the evaluation of the satisfaction with the design and the direction of future adjustment for project. The design indicator developed in this study can be utilized as a design indicator of design quality management and decision system for the school green remodeling in the future. In addition, by accumulating information on the Green Remodeling Project, it is necessary to spread green remodeling and construct a sustainable building environment.

The Evaluation of Historical and Cultural Authenticity of the Three Major Cultural Areas Projects - Targeting Korean culture theme park in Yeongju-Zone and World confucian scholar culture park in Bonghwa-Zone - (3대문화권 사업 계획의 역사문화적 진정성 평가 - 한국문화테마파크 영주지구와 세계유교선비문화공원 봉화지구를 대상으로 -)

  • Jung, Kyoung-Ah;So, Hyun-Su
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.1
    • /
    • pp.25-35
    • /
    • 2016
  • This study targets Korean culture theme park in Yeongju-Zone and World confucian scholar culture park in Bonghwa-Zone among the Three Major Cultural Areas Projects supervised by Ministry of Culture, Sports and Tourism. The study analyzes the Historical and Cultural Authenticity of each project on the basis of the reports and the report materials for meeting with related organizations. The results of the study are drawn as follows. First, through the theoretical consideration, this study drew the types of authenticity: originality, identity, specificity and visibility, which are evaluation items on the Historical and Cultural Authenticity. Second, Bonghwa-Zone succeeded in acquiring originality with tangible cultural properties but Yeongju-Zone chose a project site without it. Third, with originality, Bonghwa-zone was evaluated as having resources and concept with high traditional culture connectivity and fulfilled identity. It led the feature showing the high affinity between originality and identity. Fourth, compared to the projects of Andong-Zone in the Three Major Cultural Areas Projects, these two projects failed to acquire the distinctions since the primary and the secondary influence area and major facilities & programs coincided with those of the projects of Andong-Zone. Fifth, compared to Bonghwa-Zone, Yeongju-Zone realized visibility faithfully by the conceptual flexibility of "Korean Culture" and a large-scale development. Sixth, in terms of the Historical and Cultural Authenticity of project plan, it is evaluated that Yeongju-Zone and Bonghwa-Zone only fulfilled visibility and specificity respectively.

INTRODUCTION OF THE G-7 PROJECT: Integrated System of Water Quality Management (G-7 과제에 대한 소개 : 수질관리를 위한 통합 시스템)

  • Kim, Kye-Hyun;Kim, Eui-Hong;Lee, Hong-Keun;Lee, In-Seon;Ryu, Joong-Hi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.1 no.2 s.2
    • /
    • pp.143-152
    • /
    • 1993
  • A long-term water quality study has been initiated by the Korean Ministry of Environment(MOE) - The G-7 Project--in cooperation with two national research institutes, an University research tn and a consulting firm. This study includes the development of computer software for total water quality management system, so called ISWQM (Integrated System of Water Quality Management). ISWQM includes four major components: a GIS database; two artificial intelligence (AI) based expert systems to estimate pollutant loadings and to provide cost-effective wastewater treatment system for small and medium size urban areas; and computer programs to integrate the database and expert systems. ISWQM is to provide user-friendly Decision Support System (DSS) for water quality planners. A GIS was used to create spatial database which stores all the necessary data to n DSS. GIS was also used to integrate the four components of ISWQM from data creation to decision making through Graphic User Interface (GUI). The results from the first phase of this study showed that GIS would provide an effective tool to build DSS using expert system.

  • PDF