The objective of this study is to analyze the distribution of urban parks and its problems in a city in Gyeonggi-do where new towns and old towns are mixed. The study will also analyze and understand the unbalanced deployment of urban parks - rest areas and carbon absorbers of an entire city - between old towns and new towns, suggest improvement opportunities and examine and suggest plans to create and expand urban parks in old cities that lack urban parks. Findings showed that first, new towns were 1.2~1.6 higher than old towns in the number of parks, park area, and per capita park area, indicating that parks were unbalanced across towns. Second, as for a plan for improving the unbalanced deployment of urban parks, when the use area needs to be changed in an urban development project, it was suggested to donate 10% of the project site to the city to create it into a park and it was suggested to identify and proactively improve alternative park resources that can replace parks such as rivers and recreational sites. Third, regarding a plan for improving urban parks in old towns, it was suggested to secure urban parks by attracting various urban development projects to old town areas. The amendment of related laws was proposed to double required park area to $6m^2$ per household. Amendments were also suggested for one law and four guidelines to specifically define the location of urban parks as well.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.117-123
/
2011
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
The purpose of this paper is to highlight the main policies of the last half century that have shaped the urban architectural fabric of Seoul today, and explore whether a modified approach might better address the current socioeconomic conditions in Korea. The paper defines and examines urban planning in Korea through an overview of the four main urban project policies implemented in Seoul from the 1960s to the present: Land Readjustment (LR), Housing Site Development (HSD), Urban Redevelopment (UR), and Housing Reconstruction (HR). While the fundamental ideology behind these policies served well during a prolonged period of high economic growth, evidence is growing that these policies are losing steam under today's conditions. A growing legacy of stalled and incomplete urban projects from the mid-2000s-the New Town Project is an example-begs the fundamental question as to whether an alternative urban planning paradigm is needed for Korea in an age of low economic growth, low birth rates and a fossil fuel energy crisis. Through the urban morphologies of the three residential areas in Seoul developed by LR projects, this paper looks at the possibility of urban regeneration through the sustainment of urban architecture in those residential areas that have not been affected by HSD, UR, and HR.
This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.
The trend of Development Projects has been changing through a few recent years. Small-scale development projects in the past were usually for building residences or officetel in a big cities. making lots of profits. These projects made not only lots of profits but also unbalance between the urban centers and the suburbs. So government made some regulations to prevent the things from being worse anymore, planned to develop the country in balance and began to lead large-scale development project such as Inno city and Newtown. At first, in this study, the phases and the characteristics of development project's change will be looked around. And then, after overview about PFV(project financing vehicle) used a lot in large-scale development projects will be seen, the better ways to use PFV in large-scale development projects are going to be proposed by considering the problems in PFV's conformation.
Purpose: The small-scale environmental impact assessment conducted during the development project stage has focused on the preservation of the natural environment centered on non-urban areas, due to the nature of urbanization, health problems for citizens of high-density urban areas have a limitation in that they are relatively neglected. In the case of strategic environmental impact assessment and environmental impact assessment in urban areas, there is no basis for evaluation in urban areas because there are exceptions to be excluded from the target projects or there are no target project regulations for buildings. Therefore, in this research, we examined the problems with the target project such as the current environmental impact assessment, and tried to establish a system improvement plan that can solve them. Research design, data and methodology: After reviewing the current environmental impact assessment-related laws (including enforcement ordinances) and national land planning laws (including enforcement ordinances), exceptions such as environmental impact assessment in urban areas were identified and problems were identified. Based on this, an amendment to the Enforcement Decree was proposed to provide institutional support for the expansion of target projects such as environmental impact assessment in urban areas. Results and Conclusions: Through this research, it is expected that the projects subject to environmental impact assessment on development projects in urban areas directly related to the health of the people will be expanded, and the net function of the environmental impact assessment system will be maximized.
This paper discusses Dortmund's municipal economic development policy, in particular during the period 2000-2010 in the context of the "Dortmund-project", a strategic concept designed at the end of the last millennium. Its core elements and key projects are presented in the following. We draw much attention to the interplay of cluster policy and urban development. In an earlier paper, Becker and Hermann (2013) had discussed some of other important milestones reached in the context of structural change in Dortmund, with a particular focus on the development of the TechnologieZentrum (=Technology Center) and the TechnologiePark (=Technology Park) Dortmund from its beginning in 1984. The "dortmund-project" was not addressed in detail. This present article and their paper are complementing one another.
사회·경제적 여건 변화에 따른 저성장시대에 진입하며, 전국 대부분의 도시에서 도시재생을 적극적으로 추진하고 있다. 도시재생은 막대한 국가재정이 투입된 사업임에도 불구하고, 아직 명확한 평가시스템이 마련되지 못하였다. 도시재생사업의 지속가능성을 담보하기 위해 도시재생사업의 성과를 평가하고, 정책을 보완하기 위한 환류체계 구축이 필요하다. 본 연구에서는 도시재생사업의 성과를 평가하기 위한 공간 빅데이터 기반의 도시재생성과 평가기법을 개발하는 것을 목적으로 한다. 도시재생성과 평가기법은 도시재생사업 유형, 대도시·중도소시 여부 등을 기준으로 도시재생사업 영향권을 차등화하였다. 인구·사회, 산업·경제, 물리·환경 측면 평가지표의 도시재생사업 영향권 내부·외부 간의 상대적 비교를 통해, 도시재생사업의 성과를 정량적으로 측정하였다.
The 6th International Conference on Construction Engineering and Project Management
/
pp.51-53
/
2015
As abnormal climate phenomena occur more frequently due to climate change, damage which results from meteorological disaster increases accordingly and its scale and variety are becoming wider. This paper draws out planning and design elements and application techniques to build cities more adaptive to climate change from urban development cases in US and Europe. An urban model is suggested, that enables built environment to be more resilient to risks caused by climate change is applicable to urban development projects in practice.
The Centralized Traffic Control(CTC) System of Urban Railway is an element(subsystem) of the Urban Railway system to aim safety operation and efficient management of rolling stock in accordance with a train scheduling program in train operation ways. That's why the CTC System must be developed considering systematic and safety-guaranteed methods such as RAMS(Reliability, Availability, Maintainability, and Safety) refereed to IEC standards. The CTC System is consists of rolling stock, signaling, power supply, communication, and mechanical equipment and preforms control and remote monitoring functions. The technical activities considering safety process are very important at such an early stage of development in a railway project. This paper introduces RAMS activities and an independent safety assessment by $3^{rd}$ Party focused on a safety applied to a development of the CTC system of Urban Railway and proposes the experiences as well practices.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.