• 제목/요약/키워드: Urban Development Project

Search Result 590, Processing Time 0.602 seconds

The Effect of the Characteristics of the Urban Area on the Apartment Price Level of the Area (연담도시권 특성이 지역 아파트가격 수준에 미치는 영향)

  • You, Sang-Beom;Lee, Chang-Soo
    • Journal of the Korean Regional Science Association
    • /
    • v.38 no.4
    • /
    • pp.31-44
    • /
    • 2022
  • This study was conducted with the aim of confirming the relevance and effect of the characteristics of the cities and cities in the neighborhood area, focusing on the sale price per square meter of apartment. Specifically, it was intended to determine whether cities in the relevant city and neighborhood area have differential characteristics between the metropolitan area and the non-metropolitan area, whether industrial characteristics, urban planning and development project characteristics, and location characteristics. Comparing the research results of the city and metropolitan area, it was found that there was a correlation in all areas of population characteristics. Industrial and urban planning projects and development project characteristics sectors are not significant in the city, but they appear significant when analyzed in the urban area of the year. When classifying and analyzing the metropolitan area and the non-metropolitan area, both the metropolitan area and the non-metropolitan area were significant in the population sector, and only the distance from Gangnam-gu was significant in the local sector. Since the population is concentrated in the Seoul metropolitan area now, the sale price per square meter of apartments is also concentrated in the Seoul metropolitan area, which is believed to result in such a result. This is judged to be an analysis that appears because the characteristics of the developable status of the metropolitan area and the non-metropolitan area are different. Accordingly, this study shows that the characteristics of neighboring areas as well as the city should be analyzed when analyzing the factors affecting the sale price per square meter of apartment, and suggests that housing market monitoring needs to be carried out together.

Conflict analysis and countermeasures due to construction of very-deep tunnels in urban area (도심지 대심도 터널건설에 따른 갈등분석 및 대책)

  • Moon, Joon-Shik;Jeon, Kichan;Kim, Young Geun;Moon, Hoonki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.371-384
    • /
    • 2021
  • Underground space, especially very-deep tunnel development in urban area, is a good alternative to solve the problem of insufficient ground space, and the need for underground space development is steadily increasing. However, due to the complex and time-consuming nature of design and construction, public conflicts related to the deep tunnel project are getting aggravating and more complex. In addition, since the public budget is mainly invested, when civil complaints arise, they often respond passively, resulting in amplification of conflicts or prolonging the deadlock in many cases. In this study, by analyzing the progress of major conflicts related to the construction of very-deep tunnels in urban area, the causes of conflicts, factors prolonging conflicts, and solutions are reviewed. Through a survey targeting ordinary citizens and tunnel experts, thoughts about the deep tunnel construction and major conflict factors were analyzed, and suggestions for minimizing conflicts were presented. The results of this study can be used to prepare alternatives such as various public involvement measures and improvement of project procedures to form a civic consensus on the construction of very-deep tunnels, and to prepare measures to improve prejudice against very-deep tunnels.

The Impact of Plan Characteristics of Residential Land Development Project on Inner Land Price Change (택지개발사업의 계획특성이 사업지구 지가변동에 미치는 영향)

  • Jang, In-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.698-705
    • /
    • 2016
  • The purpose of this study is to analyze the impact which the plan characteristics of Residential Land Development Projects have on land price changes in the project district and to derive policy implications for the efficient promotion of these projects. For this purpose, we analyzed the promotion land price change progress of Residential Land Development Projects step-by-step. After theoretical consideration and a review of the references, 16 plan characteristics of Residential Land Development Projects affecting land price changes were selected ((1) The rate of land price change, (2) Business area, (3) Residential land ratio, (4) Commercial land ratio, (5) Semi-residential land ratio, (6) Neighborhood facilities land ratio, (7) Apartment house ratio, (8) Street ratio, (9) Park & green ratio, (10) Ratio of land for schools, (11) Site development cost for $1m^2$, (12) General residential area ratio, (13) Semi-residential area ratio, (14) Commercial area ratio, (15) Semi-Industrial area ratio, and Natural green area ratio). We used SPSS Version 20.0 to analyze the impact of the 16 selected plan characteristics on the land price changes. As a result, it was found that the land price began to rise two years (before/after?) the appointment of the district and became stabilized after the completion of the project. The plan characteristics that affect the land price changes were found to be the (2) Business area, (4) Commercial land ratio, (6) Neighborhood facilities land ratio, (8) Street ratio, (11) Site development cost for $1m^2$, and (12) General residential area ratio.

A Study on the Block Structure of the Land Readjustment Project Districts Focused on the case study of Cheongju City in the 1970's (토지구획정리사업지구의 가구(街區)체계에 관한 연구 -1970년대 청주시 사례를 중심으로-)

  • Kim, Mi Yeon;Oh, Deog-Seong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.551-563
    • /
    • 2019
  • This study examined the characteristics of a district through the concept of a block system in the physical aspect of the four land readjustment project districts of Cheongju City in the 1970s. The results of this study are as follows. First, the local road system for accessing the main road network and blocks was well established compared with the current urban development standards. On the other hand, since the access roads to the individual lots in the block were not equipped properly, it was difficult to improve a house. Second, according to the characteristics of the block, the Aspect Ratio of blocks was 1: 2 on average and most of those directions was east-west. The area of block from the 1st to 3rd districts was increasing, but districts 4 were decreasing. This also was changed to the shape of a contemporary block system. The larger the size of the block area, the lower the Jeobdoyul. Third, in terms of the characteristics of the lot array, blocks with a multi-row system of $4{\times}4$ or more were lots up to the 1st to 3rd district, but 4th district was improved greatly. Because blocks close a square shape have become excessively poor with Jeobdoyul, it was judged that it is difficult to improve the residential environment. Moreover, as the type of the residential development by the land readjustment project is standardized considerably and this type of land area is extensive, it can be an alternative to control the urban sprawl of suburbs if it finds the way to improve this type of the residential area considering this characteristic.

An Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project (초고층 개발사업 추진을 위한 단계별 리스크 요인의 특성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.103-115
    • /
    • 2016
  • The 106 buildings of 200 meters' height or greater were completed around the world in 2015 (CTBUH, The Council on Tall Buildings and Urban Habitat). They beat every previous year on record, including the previous record high of 99 completions in 2014. This brings the total number of 200-meter-plus buildings in the world to 1,040, exceeding 1,000 for the first time in history and marking a 392% increase from the year 2000, when only 265 existed. South Korea recorded three completions during 2015 - improving slightly over 2014, in which it had one. This study focused on the fact that high-rise building development project risks have not reduced in Korea in spite of numerous studies and measures. And it attempted to examine whether existing studies and measures have been presented on the basis of the accurate analysis of existing studies and measures and classify and analyze the characteristics of each phase' s risk factors in the hope that its results would be one reference point as to the measure to prevent high-rise building development project risks in the future. A high-rise building development project is the high risk project as compared with the low-rise project. Because a high-rise development project takes long and is very sensitive to the changing environment. Therefore, in order to succeed the project it becomes necessary to effectively manage the risk involved in the process of the high-rise building development project. The result of this study can be used as the guideline to make the risk management system for the high-rise development project.

Estimation of low impact development duration of estuaries at urban area (도시 유역에 위치한 하구를 구성하는 하천의 저영향 개발 기간 산정)

  • Jeong, Anchul;Lim, Jeongcheol;Kim, Songhyun;Baek, Chungyeol
    • Journal of Wetlands Research
    • /
    • v.21 no.4
    • /
    • pp.290-297
    • /
    • 2019
  • The estuary is a transition zone where fresh water and salt water meet because the stream is connected to the open sea area. So estuaries have very high biodiversity and form a unique ecosystem. However, before the recognition of the ecological value of the estuaries, various damage and disturbances have been occurred so countermeasures are needed. The river master plan is acting as a disturbance factor. However, the river master plan has the public object such as water disaster defense, river function improvement, and national water resources management. Therefore, it is necessary to study the ways in which the opposite relationship of development and ecosystem protection coexist. In this study, the concept of environmental windows were used to estimate the low impact development duration. We expected that proposed method for low impact development duration estimation can be used as a basis and basic data to protected the ecosystem from development project and disturbance in the future.

An Hybrid Approach for Designing Detention and Infiltration-based Retentions to Promote Sound Urban Hydrologic Cycle (도시 물 순환 건전성을 위한 유수지와 침투기반 저류지의 복합설계기법)

  • Choi, Chi-Hyun;Choi, Dae-Gyu;Lee, Jae-Kwan;Kim, Sang-Dan
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • This article proposes a hybrid approach involved in determining the size of stormwater control facilities as part of a very large scale urban retrofit project. The objective of the proposed hybrid approach is to restore the pre-development hydrologic cycle. Firstly, an appropriate IETD is determined to isolate single storm events from the continuous rainfall record. Then, using the NRCS-CN method, direct runoff and infiltration volume are computed for every storm events. Long-term statistics of direct runoff and infiltration volume are analyzed in each case of pre-development, post development, post development with detention only, and post-development with the proposed hybrid approach. In order to preserve long-term statistics of direct runoff and infiltration volume in the case of pre-development, the size of detention and infiltration-based retention are estimated using the genetic algorithm. The result shows that the proposed hybrid approach is very useful for restoring statistics of natural direct runoff and infiltration volume.

A Revitalize Rural Hub Project in Hwayang-eup by Introducing the Concept of Place Marketing (장소마케팅 개념을 도입한 화양읍 농촌중심지 활성화 사업 계획)

  • Park, ji-Hwan;Kim, Tae-Gu;Oh, Chang-Song
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.2
    • /
    • pp.119-130
    • /
    • 2019
  • In a situation in which rural areas are declining, local governments are seeking to revitalize areas by place marketing. Place marketing, defined by various efforts to promote the image of a place, has been used as an economic tool. As a result, the image has been over-promoted and marketing has been driven in a perfunctory manner, so individual residents' lives and experiences have been ignored. Thus, in addition to the traditional types of cultural place marketing and economic place marketing, this study established a 'project for rural revitalization of Hwayang-eup' so that it could be applied to political place marketing aimed at inducing internal investment and improving the welfare of local residents. To implement this project, the concept was set up as building network organization, sustainable development and symbiotic relationship, and various H/W and S/W plans were developed. First of all, in terms of political place marketing, the Hwaeyang Oulim Center was constructed to strengthen the capacity of local autonomous organizations. In terms of cultural place marketing, we explored cultural resources at the village level and created a small community space. In terms of economic place marketing, the landscape around the main street and the township was reorganized to create a cultural business space for urban and rural exchanges. The reinterpretation of place marketing seen through this project was first, it was more process-oriented than results, second, it was important to induce the community-participating village-making project, and finally, the role of experts was important to expand the community movement.

A Study on the Process of Pacific Park Development in NYC -Focusing on the Changes & Responds Shown in the Development Process- (뉴욕시 퍼시픽 파크 개발의 진행과정에 대한 분석적 고찰 -개발 진행상의 변화 및 위기대응과정을 중심으로-)

  • Lee, Woo Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.1
    • /
    • pp.745-752
    • /
    • 2020
  • The purpose of this study is to analyze the development progress of Pacific Park (formerly Atlantic Yard) in Brooklyn, New York City. Along with the Hudson Yards Development in Manhattan, Pacific Park is one of New York City's leading large-scale urban development projects using space right above an existing railway and has attracted worldwide attention. With the resurgence of large-scale development, its advanced form has received social attention. In particular, the development was evaluated as an exemplary development using the Community Benefits Agreement, which benefits local residents. Unfortunately, due to various difficulties, the development has been struggling from delays and changes away from the early stages, which have also caused social concerns and criticism. In this regard, this study examines the development through the process and the public sector's responses to the risk-inducing factors and reactions. The theoretical background of the US urban redevelopment is examined, and the specific changes and major contents of the project are analyzed. The following implications were drawn based on changes and responses in the development process: 1) securing the flexibility and mandatoryness of developers, 2) comprehensive control of the development site, 3) communication with and responding to the public, 4) securing additional financial resources, and 5) verification of new technologies.

A Study on the Improvement of Efficient Execution System for Cadastral Resurvey Project (지적재조사사업의 효율적인 추진체계 개선에 관한 연구)

  • Kim, Jae Myeong;Choi, Yun Soo;Yoon, Ha Su;Kim, Young Dan
    • Spatial Information Research
    • /
    • v.21 no.4
    • /
    • pp.47-62
    • /
    • 2013
  • Recently there are growing arguments about the needs to improve Cadastral Resurvey Projects more efficiently and rationally since the projects have realistically started. This study aims to analysis some problems of the projects and finds out the solutions. With this purpose, we have surveyed some literatures related to the demonstration projects, and then have examined some similar domestic urban development projects and international Cadastral Resurvey Projects in order to apply their appropriate tools to the present or future projects. Generally the execution process of Cadastral Resurvey Projects has four steps and this study arranges the main problems in each steps. In the result it suggests that some improvements should change as the followings. (1) It is more effective to take planning-based approach than project-based one. (2) The project boundary needs to be decided with the rectangular patterns not the irregular ones for the efficient project. (3) The adjusting the current baseline of agreement should be reconsidered because too high baseline may make the project difficult to progress. (4) Not only systematical public relations to promote the projects but also a variety of incentives to induce the public participations is very important to solve the problems of involvement. (5) Institutional tools for collaborate planning is also desirable to solve the conflicts among stakeholders rationally and effectively.