• Title/Summary/Keyword: Unloading speed

Search Result 60, Processing Time 0.026 seconds

A Study on Loading/Unloading Methods for High-Speed Container Loading/Unloading System (고속 컨테이너 하역시스템의 하역방법에 관한 연구)

  • 박경택;김선호;김두형
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1998.10a
    • /
    • pp.167-174
    • /
    • 1998
  • Recently several researches of high speed container ship and loading system are mainly accomplished in U.S.A. and Japan. Its shipping service is not realized but it is realized in near future. To effective use of the feature and efficiency of them, quay, loading/unloading. yard operation system, port management system and connection transport system must be well integrated and operated. Specially, loading /unloading speed of container crane is important for making effective use of them. To speed up loading/unloading system, RO-RO and LO-LO methods that are mostly exclusive system are studied on the container crane with special structure and mechanism to handle individual container or bundle of containers. In this paper these methods are shown. When new high speed loading system of container is desighed, the realistic constrains must be considered.

  • PDF

Model based Simulation of Container Loading/Unloading

  • Lee, Soon-Sup
    • International Journal of Ocean System Engineering
    • /
    • v.2 no.3
    • /
    • pp.170-175
    • /
    • 2012
  • Currently, most logistics use containers. The construction of new port and high speed medium size container ship for the transportation of merchandise have become very important. The problem of ship stability is also important because of its direct influence on the loss of human life, ships, and merchandise. The stability of a container ship during its operation is not a large problem because it is well considered in the design process. However, the assessment of ship stability during container loading/unloading in port still depends on the expertise of experienced personnel. In this paper, a model based simulation system is introduced, which is able to assess ship stability during container loading/unloading, using ENVISION, a general purpose simulation system.

Reliability analysis of LNG unloading arm considering variability of wind load (풍하중의 변동성을 고려한 LNG 하역구조물의 신뢰성해석)

  • Kim, Dong Hyawn;Lim, Jong Kwon;Koh, Jae Pil
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.2
    • /
    • pp.223-231
    • /
    • 2007
  • Considering wind speed uncertainty, reliability analysis of the LNG unloading arm at Tongyoung Production Site was performed. Extreme distribution of wind speed was estimated from the data collected at the weather center and wind load was calculated using wind velocities and coefficients of wind pressure. The unloading arm was modeled with plate and solid elements. Contact elements were used to describe the interface between base of structure andground. Response surface for maximum effective stress was found for reliability analysis and then reliability functions was defined and used to determine exceeding probability of allowable and yield stresses. In addition, sensitivity analysis was also performed to estimate the effect of possible material deterioration in the future.

The study of wheel unloading change in case of tilting actuation (틸팅차량의 곡선부 틸팅동작 시 윤중감소율 병화에 대한 고찰)

  • Kim Nam-Po;Kim Jung-Seok;Oh Il-Geun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.435-442
    • /
    • 2004
  • Tilting train allow the train to pass curve at higher speed without affecting passenger comfort. As the tilting trains run curve track about 30$\%$ higher than non-tilting trains, the centrifugal force and dynamic force will be higher. Therefore it is very important for tilting train to ensure safety against derailment, and to reduce the lateral track forces by applying light-weight design, optimized suspension design and steering mechanism. The 180 km/h Korean Tilting Train(TTX) which is now developing as a part of the Korean National R & D project, was designed and analytically verified to meet these special requirements. This paper describes the analytic study to verify the safety against derailment, especially on the wheel unloading in case of tilting actuation. The severest curve geometry and curving speed was assumed, the tilting control pattern was also assumed as trapezoidal force function applied to tilting bolster and bogie frame. For the comparison, the operation with the speed of tilting train without tilting actuation was numerically simulated and the operation with the balanced speed without tilting actuation was also numerically simulated. Through the numerical simulation of various operating case, we found that derailment quotients, wheel unloading and Q/P was not affected by tilting actuation and that the bogie of TTX was nicely designed to satisfy the safety against the derailment.

  • PDF

The review of safety against derailment on twisted track for Korean tilting train design (한국형 틸팅차량 설계의 비틀린 궤도상의 탈선안전도 검토)

  • Kim Nam-Po;Kim Jung-Seok;Park Tae-Won
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.299-307
    • /
    • 2005
  • The 180 km/h Korean Tilting Train(TTX) which is now developing as a part of the Korean National R&D project, was elaborately designed. As the tilting trains run curve track with the $30\%$ higher speed than normal trains, the higher centrifugal and dynamic force are expected. Furthermore the complex tilting system increase the probability of failure. Therefore it is very important for tilting train to ensure safety against derailment under the various kind of failed condition in the middle of running as well as normal operating condition. The TTX train have the relatively high roll stiffness to improve the lateral ride comfort and to limit the roll displacement on the curve. But the higher roll stiffness increase the risk of derailment on the twisted track. This paper describes the study to review the safety against derailment caused by the wheel unloading on the severely twisted track. The worst combination of maximum cant change with maximum twist defect was established by numerical simulation. And also it was assumed that the air bag deflated and still the train run its speed limit. Those kind of assumption might be the worst case from the view point of wheel unloading derailment on the twisted track. The dynamic simulation was done by means of VAMPIRE S/W and non-linear transient analysis. We found that derailment quotients Q/P was only slightly influenced by track twist but the wheel unloading was greatly influenced. And we ascertained that the higher roll stiffness the higher wheel unloading. In case of air bag deflated situation, the wheel unloading reached up to $100\%$ which means the wheel lift or jumped. Therefore it was concluded that the design need to be improved to ensure the safety against derailment on the maximum twisted track in case of air bag deflated and tilting train's speed limit.

  • PDF

Stability Evaluation on Aerodynamics of High Speed Railway Train (공력에 의한 HEMU-400x 고속열차의 주행안정성 평가)

  • Choi, J.H.;Park, T.W.;Sim, K.S.;Kwak, M.H.;Lee, D.H.
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.22 no.3
    • /
    • pp.244-252
    • /
    • 2012
  • Recently, the speed of a train has been increased. So the trains are being exposed to wind more severely than before. Because of the operation of high speed trains and lightweight of the train, risks of train derailment have being increased. In this study, aerodynamic effects of a newly designed high speed train, HEMU-400x, are evaluated. For aerodynamic effect evaluation, analysis method is selected by examining the safety standards for high speed train. The condition of aerodynamic effects is selected by adverse effect conditions. In order to calculate $C_s$ coefficients, numerical analysis is conducted. Using $C_s$ coefficients, the side force is calculated. Through dynamics analysis, derailment and wheel unloading are obtained. Using these results, derailment evaluation is performed.

AUTOMATIC CABBAGE FEEDING, PILING, AND UNLOADING SYSTEM FOR TRACTOR IMPLEMENTED CHINESE CABBAGE HARVESTER

  • Song, K.S.;Hwang, H.;Hong, J.T.
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 2000.11b
    • /
    • pp.489-497
    • /
    • 2000
  • Since Chinese cabbages weigh 3 to 5kgf and are big in size at the time of harvest, handling operations such as harvesting, loading and unloading including transportation require the highest labor demand among all other cultivation processes. Recently, though several cabbage harvesters were developed in Japan and Europe, those harvesters were not suitable for Chinese cabbages cultivated in Korea because of the size and shape. The cabbage harvester is almost meaningless without any proper cabbage piling and pallet unloading mechanism. Most harvesters developed so far adopted a sort of slide and free falling way in collecting cabbages into the pallet. Three or four labors are usually required for cleaning incoming cabbages and loading those in the pallet. Because of the required time for piling cabbages without severe damage and the required space capacity to carry empty and loaded pallets, harvesting speed should be adjusted in accordance with time required for consecutive operations. Up to now, any automatic or semi-automatic collecting device has not been developed in the world to pile cabbages on the layer one by one into the pallet in the ordered way with little damage and to unload pallet from the harvester continuously during the harvest process. To compromise system expenses and function, Semi-automatic cabbage piling and pallet unloading mechanism was devised and it required one labor. The foldable mesh pallet with a size of 1050mm x 1050mm x 1000mm and holding capacity of around 70 cabbages was utilized. The prototype for piling and unloading mechanism was composed of three parts such as feeding device, automatic piling device with retractable bellows, and pallet unloading device. Prior to developing the prototype, the geometric properties and the amount of the damage of the cabbage caused during the piling operation were investigated. Considering the height of the pallet, a series of cabbage carrying plates were mounted to the bracket chain to lift and to carry cabbages to the loading device. Indoor laboratory experiments showed that the cabbage carrying chain conveyor worked successfully. Considering the conveying speed 0.46m/sec of the pull up belt from the cabbages on the ground, the speed of cabbage carrying chain conveyor worked property in the range of 0.26m/sec to 0.36m/sec. The system allowed the operator to modify the position of cabbage slightly. Overall system worked successfully resulting into almost same capacity without severe damage to the cabbage as human did.

  • PDF

An Analysis of Running Safety for Railway Vehicle Depending on Actual Track Conditions (실제선로 조건에 따른 철도차량의 주행안전성 해석)

  • Kim, Yong-Won;Lee, Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.983-988
    • /
    • 2009
  • When the railway vehicle passing through curves & transitions, the running speed must improve by proposing the practical standard about maximum running possibility speed of each section on existing line considering running safety. In this paper, when the railway vehicle passing through curves of actual track conditions (Namsunghyun-Chungdo up & down lines), the effect that has influence on running safety is examined to devise the high speed of vehicle which passing through curves which risk of derailment is high. The running safety analysis is performed that running speed by curve radius improves 5-20% compared with existing speed under actual track conditions. In result of the running safety analysis, in case the speed condition is fewer than 15% compared with existing speed, the derailment coefficient and unloading ratio are within acceptable level. so we could confirm possibility of speed improvement on the whole Namsunghyun-Chungdo up & down lines.

Review on the Dynamic Behavior of G7 High Speed Train(KHST) in the KTX Test Line (경부고속철도 시험선 구간에서 G7 고속전철 차량의 동특성 검토)

  • 박찬경;김영국;배대성;박태원
    • Journal of the Korean Society for Railway
    • /
    • v.4 no.4
    • /
    • pp.131-137
    • /
    • 2001
  • The dynamic behavior of high speed train is very important because of its safety and passengers' ride comfort. The railway vehicle is composed of many suspension components, such as 1st springs, 1st dampers, 2nd springs and 2nd dampers, that have an influence on the dynamic characteristics of high speed train. Also, the wheel/rail shapes and the track geometry affect the dynamic behavior of high speed train. This paper reviews the dynamic behavior of KHST in the KTX test line. The VAMPIRE program is used for this simulation. The simulation results are within the limits of safety criteria. Thus the KHST can operate safely at 350 km/h in the KTX test line.

  • PDF

Dynamic Analysis for 1 inch micro-drive (1인치 마이크로 드라이브의 동특성 해석)

  • 황창호;박경수;전정일;박영필;박노철
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.592-597
    • /
    • 2003
  • To solve a problem of micro drive due to small size and portability, it is necessary to understand and to investigate micro drive widely ,deeply. So, we performed modal analysis of suspension of micro drive, and load/unload experiment for Input current to VCM coil and disk speed. To determine the effect of ramp profile, curve fitting of lateral speed is performed with equation of speed. The results indicate that small load/unload speeds decrease the number of head/disk contacts, and during unloading process, low disk speed increase the number of head/disk contacts.

  • PDF