• 제목/요약/키워드: Unloader Scheduling

검색결과 2건 처리시간 0.017초

신뢰성 분석 기반 발전설비 점검계획 수립 시스템 연구- 석탄 하역기를 중심으로 - (Study of Reliability Analysis Based Power Generation Facilities Maintenance System - Focused on Continuous Ship Unloader -)

  • 황성환;김유림;강성우
    • 품질경영학회지
    • /
    • 제51권2호
    • /
    • pp.315-327
    • /
    • 2023
  • Purpose: Recently, research has continued to predict the time of failure of the facility through measurement data obtained by attaching a sensor to the facility. However, depending on the facility, it may be difficult to attach a sensor. The purpose of this study is to propose a power generation maintenance plan system based on failure record data obtained from Continuous Ship Unloader, one of the facilities that is difficult to attach sensors. Methods: This study uses data collected from 2012 to 2022 from the 'CSU-1B' model among Continuous Ship Unloader operated by Korea Midland Power Co., LTD. By fitting fault record data to the Weibull distribution, appropriate maintenance cycles and ranges for each target facility subsystem are derived. In addition, maintenance group between subsystems is selected through Euclidean distance, a metric often used for time series data similarity. Through this, a system for establishing an maintenance plan for power generation facilities is proposed. Results: The results of this study are as follows. For the 17 subsystems of the Continuous Ship Unloader, proper maintenance cycles and ranges were determined, and a total of four maintenance groups were chosen. This resulted in the creation of an power generation maintenance plan system and the establishment of an maintenance plan. Conclusion: This study is a case study of power generation facilities. We proposed a maintenance plan system for Continuous Ship Unloader among power generation facilities.

이단계 계층적 구조를 이용한 원료 운송 일정계획 전문가 시스템 (A Two-Level Hierarchical Expert System for Raw Material Scheduling)

  • 서민수;고영관;김창현;최해운
    • 지능정보연구
    • /
    • 제2권1호
    • /
    • pp.75-91
    • /
    • 1996
  • 제철소에서의 원료 운송 작업은, 선박에 선적된 원료를 하역하여 야드에 적치한 후, 제반 원료 소요공장까지의 벨트 컨베이어를 통한 원료 수송 작업을 의미한다. 본 연구에서는 원료 운송과 관련한 선박 접안, 원료 하역 및 벨트 컨베이어 수송 일정 계획을 효과적으로 수립하기 위하여 이단계 계획적 구조를 이용한 일정계획 휴리스틱을 개발하고 이를 구현하기 위한 전문가 시스템을 개발하였다. 이단계 계층적 구조는 상위 단계의 Scheduler 와 하위 단계의 복수개의 Dispatcher 로 구성되어 있다. 하위 단계의 Dispatcher는 주어진 제약조건하에서 단위 문제를 해결하고 이를 상위 단계의 Scheduler에게 보고하게 된다. 상위 단계의 Scheduler 는 전체적인 문제 해결의 우선 순위 결정 및 Dispatcher 간의 상층을 해결하는 역할을 맡게 된다. 이러한 계층적 구조를 이용한 분산처리를 통해 문제의 복잡성을 줄이고, 시스템 설계의 모듈화 및 유연성있는 시스템 구축이 가능하게 되었다. 본 시스템은 실시간 전문가 시스템 도구인 G2를 이용하여 SUN Workstation에서 개발되었다.

  • PDF