• Title/Summary/Keyword: Unit schedule

Search Result 159, Processing Time 0.03 seconds

A study on the physico-chemical characteristics of municipal solid wastes generated in the sunchon city (순천시의 생활폐기물 발생량 예측 및 재활용시설의 용량산정에 관한 연구)

  • Hu, Kwan;Moon, Ok-Ran;Wang, Seung-Ho
    • Journal of the Korea Organic Resources Recycling Association
    • /
    • v.9 no.4
    • /
    • pp.125-134
    • /
    • 2001
  • The purpose of this study is to provide basic information for a future countermeasure municipal and to establish several wastes policy after investigating solid wastes from Sunchon City. In addition, this research can be supported to manage of recycling plant and to reuse plant of each wastes. Results are as bellows after checking up and analysis type of waste in Sunchon city Unit solid waste generation rate from single family is $0.50kg/person{\cdot}day$, and total solid wastes are 41.9ton/day. Unit solid waste generation rate from apartments is $0.45kg/person{\cdot}day$, and solid wastes generation is 55.5ton/day. Unit solid waste generation rate from agricultural is $0.22kg/person{\cdot}day$ and total solid wastes are 13.5ton/day. That show total amount of municipal solid wastes from residential are 110.9ton/day. Unit solid waste generation rate from traditional markets is $1.85kg/person{\cdot}day$, and solid waste total volume is 5,400kg/day. Unit solid waste generation rate from small store is $2.03kg/person{\cdot}day$, and solid waste total are 25,101kg/day. Therefore, this show that total wastes are 30.50kg from downtown and commercial area. Solid waste quantity from Industrial area (Factory region) is 8.5ton and in case of school and hospitals are 7.2kg/day and 3.0kg/day. Solid waste amount from Institutional is 6.6kg/day. Food wastes were eliminated from municipal solid wastes as standard 63.4ton/day, and combustible wastes were 126.9ton/day. If it schedule about 5 years (by 2006) as durable year for food wastes treatment plant, it is expected 42.5ton/day for treatment capacity. We can judge that it is effective to be set 2 lines equipment ${\times}25ton/day$ as treatment ability under considering unexpected working condition such as any repair, trouble and an electrical load. If it schedule about 10 years (by 2011) as durable year for food wastes treatment plant, it is expected 150 ton/day for treatment capacity. We can conclude that it is effective to be set 2 lines equipment ${\times}80ton/day$ as treatment ability under considering working condition such as low loaded operating and the repair for incineration.

  • PDF

Timing Verification of AUTOSAR-compliant Diesel Engine Management System Using Measurement-based Worst-case Execution Time Analysis (측정기반 최악실행시간 분석 기법을 이용한 AUTOSAR 호환 승용디젤엔진제어기의 실시간 성능 검증에 관한 연구)

  • Park, Inseok;Kang, Eunhwan;Chung, Jaesung;Sohn, Jeongwon;Sunwoo, Myoungho;Lee, Kangseok;Lee, Wootaik;Youn, Jeamyoung;Won, Donghoon
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.22 no.5
    • /
    • pp.91-101
    • /
    • 2014
  • In this study, we presented a timing verification method for a passenger car diesel engine management system (EMS) using measurement-based worst-case execution time (WCET) analysis. In order to cope with AUTOSAR-compliant software architecture, a development process model is proposed. In the process model, a runnable is regarded as a test unit and its temporal behavior (i.e. maximum observed execution time, MOET) is obtained along with on-target functionality evaluation results during online unit test. Furthermore, a cost-effective framework for online unit test is proposed. Because the runtime environment layer and the standard calibration environment are utilized to implement test interface, additional resource consumption of the target processor is minimized. Using the proposed development process model and unit test framework, the MOETs of 86 runnables for diesel EMS are obtained with 213 unit test cases. Using the obtained MOETs of runnables, the WCETs of tasks are estimated and the schedulability is evaluated. From the schedulability analysis results, the problems of the initially designed schedule table is recognized and it is fixed by redesigning of the runnable mapping and task offset. Through the various test scenarios, the proposed method is validated.

Comparison of Shift Satisfaction, Sleep, Fatigue, Quality of Life, and Patient Safety Incidents Between Two-Shift and Three-Shift Intensive Care Unit Nurses (중환자실 간호사의 2교대와 3교대근무 간 근무 만족도, 수면, 피로, 삶의 질과 환자안전사고 비교)

  • Chae, Min Jin;Choi, Su Jung
    • Journal of Korean Critical Care Nursing
    • /
    • v.13 no.2
    • /
    • pp.1-11
    • /
    • 2020
  • Purpose : The aim of this study was to compare shift satisfaction, sleep, fatigue, quality of life (QOL), and patient safety incidents between a newly implemented two-shift system and a traditional three-shift system. Methods : A total of 127 intensive care unit nurses (48 two-shift nurses and 79 three-shift nurses) working in a tertiary hospital in Seoul were recruited from January 1, 2017, to March 31, 2017. They completed a self-reported questionnaire about their work hours, shift satisfaction, sleep patterns, sleep quality, fatigue, QOL, and patient safety incidents in the past 2 weeks. Data were analyzed using SPSS version 23.0. Results : The two-shift group showed higher shift satisfaction scores compared with the three-shift group (6.93 vs. 4.37, p<.001). Sleep latency was shorter and sleep quality was better in the two-shift group compared with the three-shift group. There were no significant differences in other sleep parameters, fatigue, QOL, and patient safety incidents between the two groups. Conclusion : Although a two-shift system did not improve nurses' fatigue or QOL in this study, it may effectively serve as an alternative shift-work system that can increase sleep quality and shift satisfaction without increasing patient safety incidents.

A Study on the Test and Evaluation Process Development for Korea Next Generation Highspeed Electric Multiple Unit (차세대 고속열차 시험평가 프로세스에 관한 연구)

  • Lee, Tae-Hyung;Kim, Sang-Soo;Kim, Seog-Won;Kim, Ki-Hwan;Chung, Heung-Chai
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.7 no.2
    • /
    • pp.7-11
    • /
    • 2011
  • A high-speed railway system represents a typical example of large-scale multi-disciplinary system, consisting of subsystems such as rolling-stock, electrical hardware, electronics, control, information, communication, civil technology etc. The system design and acquisition data of the large-scale system must be the subject under strict configuration control and management. Systems engineering technology development project for Korea next generation High-speed Electric Multiple Unit (HEMU) system in progress is a national large system development project that is not only a large-size and complex but also multi-disciplinary in nature. Therefore, all stakeholders must understand and share the functional and performance requirements of HEMU throughout its life-cycle phases. Also in the test and evaluation phase, all systems requirements must be verified. In 2011, the prototype train manufacturing will be completed. It will do test run on the commercial line and all systems requirements are verified until 2012. For the system verification, the test and evaluation process have to be established before the test trial run. Using a systems engineering tool, the system design database(SDD) with requirements traceability and development process management in the course of the development have to be established. This paper represents the test and evaluation process development based on the SEMP(Systems Engineering Management Plan) developed in the design stage. The test and evaluation process is refined and updated in comparison to the design stage one. The test and evaluation process consists of procedure, test and evaluation method and schedule. So through this process, it is defined that each systems requirements is verified on which test and about what time.

Urinary 1-Hydroxypyrene Levels in Workers Exposed to Polycyclic Aromatic Hydrocarbon from Rubber Wood Burning

  • Choosong, Thitiworn;Phakthongsuk, Pitchaya;Tekasakul, Surajit;Tekasakul, Perapong
    • Safety and Health at Work
    • /
    • v.5 no.2
    • /
    • pp.86-90
    • /
    • 2014
  • Background: Urinary 1-hydroxypyrene (1-OHP) was selected as a biomarker of polycyclic aromatic hydrocarbons (PAHs) to explore the accumulation level in the bodies of workers at rubber smoke sheet factories in southern Thailand. Methods: Spot urine samples were taken from four groups of workers from June 2006 to November 2007. The nonexposure or control groups included habitual cigarette smokers and nonsmokers. The other two groups were workers exposed to particle-bound PAHs from rubber wood smoke and they were nonsmokers. All spot urine samples were analyzed for 1-OHP and creatinine levels. Results: The mean${\pm}$standard deviation urinary 1-OHP in the control group of habitual smokers and the nonsmokers was $0.24{\pm}0.16{\mu}mol/mol$ creatinine and not-detected to $0.14{\mu}mol/mol$ creatinine, respectively. In the workers, the 1-OHP levels on workdays had no significant difference from the 1-OHP levels on the days off. The yearly average 1-OHP level was $0.76{\pm}0.41{\mu}mol/mol$ creatinine whereas the average 1-OHP level during 10 consecutive workdays was $1.06{\pm}0.29{\mu}mol/mol$ creatinine (p > 0.05). Conclusion: The urinary 1-OHP levels of workers exposed to PAHs were high. The accumulation of 1-OHP in the body was not clear although the workers had long working hours with few days off during their working experience. Therefore, a regular day off schedule and rotation shift work during high productive RSS should be set for RSS workers.

Construction of Aluminum Curtain Wall with 3D Elevation for TRUTEC Building (트루텍 빌딩의 3차원 입체 커튼월 시공)

  • Park, Choel;Hong, Doo-Pyo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.119-122
    • /
    • 2007
  • TRUTEC building, which is located at DMC B block is zone, is just one the office building in Soeul. TRUTEC building is designed by Barkow Leibinger Architeken in Germany, has 5 stories under and 12 stories above and has been finished with the unique three dimensional curtain wall unit. Big trial to make unique elevation succeeded as getting rid of the typical plain curtain wall unit. In addition, aluminum bars are treated by the latest CNC machine in order to achieve 3D section. Construction of curtain wall is highly focused from the moment of contract to keep the schedule because the contract period is 18 months. Regular design meeting and technical meeting between stakeholders including construction manager, designer, engineer, consultant and so on have been held during the construction to minimize the risks from the unique elevation and trial. Step by step mock-up test (design mock-up and visual mock-up on site) has been performed before functional mock-up test.

  • PDF

An Efficient Channel Selection and Power Allocation Scheme for TVWS based on Interference Analysis in Smart Metering Infrastructure

  • Huynh, Chuyen Khoa;Lee, Won Cheol
    • Journal of Communications and Networks
    • /
    • v.18 no.1
    • /
    • pp.50-64
    • /
    • 2016
  • Nowadays, smart meter (SM) technology is widely effectively used. In addition, power allocation (PA) and channel selection (CS) are considered problems with many proposed approaches. In this paper, we will suggest a specific scenario for an SM configuration system and show how to solve the optimization problem for transmission between SMs and the data concentrator unit (DCU), the center that collects the data from several SMs, via simulation. An efficient CS with PA scheme is proposed in the TV white space system, which uses the TV band spectrum. On the basic of the optimal configuration requirements, SMs can have a transmission schedule and channel selection to obtain the optimal efficiency of using spectrum resources when transmitting data to the DCU. The optimal goals discussed in this paper are the maximum capacity or maximum channel efficiency and the maximum allowable power of the SMs used to satisfy the quality of service without harm to another wireless system. In addition, minimization of the interference to the digital television system and other SMs is also important and needs to be considered when the solving coexistence scenario. Further, we propose a process that performs an interference analysis scheme by using the spectrum engineering advanced Monte Carlo analysis tool (SEAMCAT), which is an integrated software tool based on a Monte-Carlo simulation method. Briefly, the process is as follows: The optimization process implemented by genetic evolution optimization engines, i.e., a genetic algorithm, will calculate the best configuration for the SM system on the basis of the interference limitation for each SM by SEAMCAT in a specific configuration, which reaches the solution with the best defined optimal goal satisfaction.

Thermal Evolution of BaO-CuO Flux as Sintering Aid for Proton Conducting Ceramic Fuel Cells

  • Biswas, Mridula;Hong, Jongsup;Kim, Hyoungchul;Son, Ji-Won;Lee, Jong-Ho;Kim, Byung-Kook;Lee, Hae-Weon;Yoon, Kyung Joong
    • Journal of the Korean Ceramic Society
    • /
    • v.53 no.5
    • /
    • pp.506-510
    • /
    • 2016
  • The eutectic melt of BaO-CuO flux is known to be a potential sintering aid for $Ba(Zr,Y)O_3$ (BZY) electrolyte for proton-conducting ceramic fuel cells (PCFCs). A density of BZY higher than 97% of theoretical density can be achieved via sintering at $1300^{\circ}C$ for 2 h using a flux composed of 28 mol% BaO and 72 mol% CuO. In the present study, chemical and structural evolution of BaO-CuO flux throughout the sintering process was investigated. An intermediate holding step at $1100^{\circ}C$ leads to formation of various impurity compounds such as $BaCuO_{1.977}$, $Ba_{0.92}Cu_{1.06}O_{2.28}$ and $Cu_{16}O_{14.15}$, which exhibit significantly larger unit cell volumes than the matrix. The presence of such secondary compounds with large lattice mismatch can potentially lead to mechanical failure. On the other hand, direct heating to the final sintering temperature produced CuO and $Cu_2O$ as secondary phases, whose unit cell volumes are close to that of the matrix. Therefore, the final composition of the flux is strongly affected by the thermal history, and a proper sintering schedule should be used to obtain the desired properties of the final product.

An Optimization of the Planned Target Sequencing Problem Using Scheduling Method (스케줄링을 이용한 계획표적 사격순서의 최적화 방안)

  • Hwang, Won-Shik;Lee, Jae-Yeong
    • Journal of the military operations research society of Korea
    • /
    • v.33 no.1
    • /
    • pp.105-115
    • /
    • 2007
  • It is essential to give a fatal damage to the enemy force by using prompt and accurate fire in order to overcome the lack of artillery force. During the artillery fire operations, minimizing the firing time will secure the adapt ability in tactical operation. In this paper, we developed a mathematical model to schedule the artillery fire on the multiple targets to decrease total fire operation time. To design a program to describe a real firing situation, we consider many possible circumstances of changes such as commander's intention, firing constraints, target priority, and contingency plan to make a fire plan in an artillery unit. In order to work out the target sequencing problem, MIP is developed and the optimum solution is obtained by using ILOG OPL. If this analytical model is applied to a field artillery unit, it will improve the efficiency of the artillery fire force operations.

Causes and Countermeasures of School Records Misclassifications : Focusing on the 'General Disposition Authority for School Records' (학교 기록물 분류의 문제점과 개선방안 학교 기록관리기준표 분석을 중심으로)

  • Woo, Jee-won;Seol, Moon-won
    • The Korean Journal of Archival Studies
    • /
    • no.58
    • /
    • pp.299-332
    • /
    • 2018
  • The purpose of this study is to investigate the current status and causes of misclassification of school records and to suggest the directions to improve the School Records Management Criteria Table(general disposition authority for school records), which will lead to misclassification reducement. This study begins with analysing the records created or received in four schools sampled for one year to investigate the status and causes of misclassifications. A advisory group including four administrative officers and seven records managers was formed and group meeting was held twice to identify the causes of the misclassification and to suggest alternatives. In this study, 33 unit tasks(transactions) with frequent misclassification were identified, and the cause of misclassification was analyzed based on focus group interviews. The main causes of misclassification were categorized into two types. This study concludes with suggesting the improvement of the School Records Management Criteria Table for addressing the causes, including commentary reinforcement and the addition of workflow to complex tasks.