• Title/Summary/Keyword: Unit pollutant load

Search Result 86, Processing Time 0.024 seconds

LIDMOD Development for Evaluating Low Impact Development and Its Applicability to Total Maximum Daily Loads (지속가능한 도시개발을 위한 LID평가모델(LIDMOD)개발과 수질오염총량제에 대한 적용성 평가)

  • Jeon, Ji-Hong;Choi, Dong Hyuk;Kim, Tae Dong
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.1
    • /
    • pp.58-68
    • /
    • 2009
  • Low impact development (LID) technique is relatively new concept to reduce surface runoff and pollutant loading from land cover by attempting to match predevelopment condition with various integrated management practices (IMPs). In this study, computational model for designing and evaluating LID, named LIDMOD, was developed based on SCS-CN method and applied at Andong bus terminal to evaluate LID applicapability and design retention/detention area for volume or peak flow control. LIDMOD simulated with 21 years simulation period that yearly surface runoff by post-development without LID was significantly higher than that with LID showing about 2.8 times and LID could reduce efficiently yearly surface runoff with 75% reduction of increased runoff by conventional post development. LIDMOD designed detention area for volume/peak flow control with 20.2% of total area by hybrid design. LID can also efficiently reduce pollutant load from land cover. Pollutant loads from post-development without LID was much higher than those from pre-development with showing 37 times for BOD, 2 times for TN, and 9 times for TP. Pollutant loads from post-development with LID represented about 57% of those without LID. Increasing groundwater recharge reducing cooling and heating fee, creating green refuge at building area can be considered as additional benefits of LID. At the point of reducing runoff and pollutant load, LID might be important technique for Korean TMDL and LIDMOD can be useful tool to calculate unit load for the case of LID application.

Correlation Analysis on the Runoff Pollutants from a Small Plot Unit in an Agricultural Area

  • Kang, Meea;Choi, Byoung-Woo;Lee, Jae-Kwan
    • Environmental Engineering Research
    • /
    • v.15 no.4
    • /
    • pp.191-195
    • /
    • 2010
  • This study was carried out to investigate the important factors relating to runoff and pollutant loads in a plot unit located in an agricultural area. Of the precipitation parameters, such as total precipitation, days since last rainfall (ADD, the rainfall was more than 10mm) and average rainfall intensity on runoff, the strongest effect was obtained due to total precipitation, but the rainfall intensity showed a slightly positive correlation. It was expected that both variables, i.e. total precipitation and rainfall intensity, would lead to the generation of greater runoff. In contrast, runoff was negatively correlated with ADD, which is understandable because more infiltration and less runoff would be expected after a long dry period. The TSS load varied greatly, between 75.6 and $5.18{\times}10^4g$, per event. With the exception of TN, the TSS, BOD, COD and TP loads were affected by runoff. The correlations of these items were proportional to the runoff volume, with correlation coefficients (r) greater than 0.70, which are suitable for use as NPS model data. The TSS load showed very good relationships with organics (BOD & COD) and nutrients (TN & TP), with correlation coefficients greater than 0.79. Therefore, the removal of TSS is a promising factor for protecting water basins.

Assessment of Water Quality Impact of Submerged Lakeside Macrophyte (저수지 주변 식물의 침수시 수질 영향)

  • Lee, Yo-Sang;Park, Jong-Geun
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.5
    • /
    • pp.255-262
    • /
    • 2005
  • In summer and early autumn, eutrophication occurs occasionally in many reservoirs. Lakeside macrophyte which is one of internal pollutants effects on water quality when it is submerged during water surface is rising after rainy season. This study include examination of pollutant load, species of plant, community structure and productivity of macrophyte in unit area at lakeside. The result of this research will be used as a guideline of water quality management on reservoir through assessing water quality effect of submerged plant. The areal distribution, composition of species and submerged area of macrophyte changes according to rainfall pattern every year, so it is difficult to calculate nutrient load annually from submerged macrophyte. In this study, the nutrient load from submerged macrophyte assess from Daecheong and Juam reservoir in 2001. TN and TP load of submerged macrophyte shows 0.043% and 0.069%, respectively, of annual discharge load on Daecheong watershed. At lake Juam, TN and TP shows 0.64% and 1.28% load, respectively. The reason that nutrient load of lake Juam is greater than that of lake Daecheong is that macrophyte distribution area of lake Juam is 5 times greater than that of lake Daecheong. Total nutrient load of lake Daecheong is 3 times greater than that of lake Juam.

Estimation of Pollutants Loading from Non-Point Sources Based on Rainfall Event and Land use Characteristics (강우강도와 토지이용을 고려한 비점오염물질 부하량 산정에 관한 연구)

  • Lee, Hye-Won;Choi, Nam-Hee;Lee, Yong-Seok;Choi, Jung-Hyun
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.8
    • /
    • pp.572-577
    • /
    • 2011
  • The unit load has simply been used to estimate total pollutant loading from non-point sources, however, it does not count on the variable pollutant loading according to land use characteristics and rainfall intensity. Since pollutant emission from the watershed is strongly dependent on the rainfall intensity, it is necessary to find out the relationship between pollutant loading and rainfall intensity. The objective of this study is to develop simple and easy method to compute non-point source pollution loads with consideration of rainfall intensity. Two non-point source removal facility at Gyeongan-dong (Gwangju-si) and Mohyeon-myeon (Yongin-si), Gyeonggi-do was selected to monitor total rainfall, rainfall intensity, runoff characteristics and water quality from June to November, 2010. Most of Event Mean Concentrations (EMC) of measured water quality data were higher in Gyeongan which has urban land use than in Mohyeon which has rural land use. For the case of TP (Total Phosphorus), Mohyeon has higher values by the influence of larger chemical uses such as fertilizer. The relationship between non-point source pollution load and rainfall intensity is perfectly well explained by cubic regression with 0.33~0.81 coefficients of determination($R^2$). It is expected that the pollution loading function based on the long-term monitoring would be very useful with good accuracy in computing non-point source pollution load, where a rainfall intensity is highly variable.

Estimation of Pollutants Loads using Unit Load Method in Hong-Bo Watershed (원단위법을 이용한 홍보유역의 오염부하량 산정)

  • Kim, Sun-Joo;Lee, Suk-Ho;Heo, Bae-Young
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.492-496
    • /
    • 2001
  • The purpose of this study is to estimation of pollutants loads using unit load method in Hong-bo watershed. In general, because river water quality management have been conducted with point source pollutant in our country, pollutants caused by precipitation have not been managed well so far. Especially the pollutants tends to concentrate in the reservoir of reclaimed land. Therefore, the reservoir of reclaimed land is need to continuous monitoring and update of an accurate data. also, It is need to improvement of environmental pollution. There are divide into nine sub-catchments and made an estimate of pollutants loads using unit load method in Hong-bo basin. The sample of data was during the 10 years.

  • PDF

Empirical Equation for Pollutant Loads Delivery Ratio in Nakdong River TMDL Unit Watersheds (낙동강 오염총량관리 단위유역 유달율 경험공식)

  • Kim, Mun Sung;Shin, Hyun Suk;Park, Ju Hyun;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.4
    • /
    • pp.580-588
    • /
    • 2009
  • In this study daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. Finally, multiple regression analysis is carried out to estimate empirical equations for pollutants delivery ratio. The results show that there is positive relation between the flow rates and delivery ratios, and the proposed empirical formulas for delivery ratio can predict well river pollutant loads.

A Study of GIS-based Estimation of Pollutant Loads in Accordance with Spatial Landuse Variation - Focussing on Wangsook Watershed - (토지이용의 공간적 다양성에 따른 GIS 기반 오염부하 산정에 관한 연구 - 왕숙천 유역을 중심으로 -)

  • Kim, Kyoung-Soon;Kim, Kye-Hyun;Kwon, Oh-Jun
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.5
    • /
    • pp.305-315
    • /
    • 2005
  • The scheme to classify pollution sources in Korean TMDL planning has been pointed out too much complex to implement practically because of requiring a wide range of items to be collected from a field. Within a deficient situation to collect field data, the mathematical scheme that focuses only on counting an uniform area ratio of the different land uses to estimate of pollutant loads from individual sub-catchments has been used without taking into account of the spatial characteristics of major land uses as well as the locations of pollution sources in each sub-catchment. It would cause to significant level of errors to estimate the pollution loads. Therefore, this study proposes a renovated scheme that can be adopted more easily to classify pollution sources in the watershed and reduce the estimation errors in the spatial distribution of pollution sources by introducing a spatial analysis based on digital land cover maps. In order to estimate a unit area to calculate the uniform pollution load, the pollution response unit area that is locating spatially at the same place and having same land use is identified through the application of GIS overlay technique. Unlikely existing conventional method to calculate the pollution load based on equal distribution of pollutants for each administrative boundary, it is assumed that the pollution load from household and livestock sources are generated and washed off from only residential areas. While, pollution from business population comes from commercial area and industrial load from wastewater discharge facilities are from industrial areas. From comparison of the calculated results from the existing the method and the proposed one, it is found that although the estimation of pollution load from sub-catchment in the case of the existing conventional method application results in negligible difference in total pollution amounts from the whole area of Wangsook watershed as a study area, significant difference of pollution load among sub-catchment in which pollution response unit areas are diverse, however, appears in the case of the application of the renovated scheme.

Estimation of Pollutant Loadings from Watershed into Lakes of Ganwol and Boonam (간월호 및 부남호의 유입 오염부하량 산정)

  • Lim, Kyeong-Ho;Lee, Young-Sin;Kim, Lee-Hyung
    • Journal of Wetlands Research
    • /
    • v.8 no.4
    • /
    • pp.33-40
    • /
    • 2006
  • The water of rivers and lakes in Korea is the main sources for drinking, industrial and agricultural purposes. However, various pollutants washed-off from watershed area make worse and worse the water quality. Particularly, the changes of land uses in watershed area is the main pollutant sources in many cases in Korea, it is usually called to nonpoint pollution sources. In this reason, the Ministry of Environment are programing the total maximum daily load for four major large rivers in order to improve the water quality by controlling the watershed area. Therefore, this research was performed to estimate the total pollutant input from watershed areas to lakes of Ganwol and Boonam located in Chungnamdo. The AGNPS water quality model and monitoring were used to estimate the pollutant loading rates with unit pollutant concentration of each land use. The main landuse of the research area are forest, wet and dry paddy field and small urban area. The research shows that the pollutant sources in Ganwol and Boonam lakes are from the various landuses. In this manuscripts, the results will provide important informations for mitigating the pollutants to the lakes.

  • PDF

LIDMOD2 Development for Evaluation of LID/BMPs (LID/BMPs 효과분석을 위한 LIDMOD2 개발)

  • Jeon, Ji-Hong;Choi, Donghyuk;Na, Eun Hye;Park, Chan-Gi;Kim, Tae-Dong
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.3
    • /
    • pp.432-438
    • /
    • 2010
  • LIDMOD2 was developed for evaluation of low impact development (LID) and best management practice (BMP) by modification of Site Evaluation Tool (SET). The modification includes employment of SCS-CN method for annual runoff simulation, unit load method for annual pollutant loads simulation, and the method proposed by Korean TMDL for calculating pollutant reduction by BMPs. The CN values were updated with regionalized parameters within Nack-Dong River basin because these are important parameters for simulating hydrology. LIDMOD2 was tested by applying to Andong Bus terminal. As a simulation results, pollutant loads and surface runoff will be significantly increased by post-development without LID compared with those from pre-development. LID technique was simulated to efficiently reduce surface runoff and pollutant load and increase infiltration. LIDMOD2 is screening level tool and easy to use because LIDMOD2 is based on spread sheet and most of parameters are regionalized. LIDMOD2 was illustrate that it could evaluate LID well by summarizing and graphing annual hydrology, annual pollutant loading, and hydrograph for event storm. The calculation methods related with pollutant loads are employed from the guideline of Korean TMDL and it can be useful tool for Korean TMDL to evaluate the effect of LID/BMP on developing area.

Basic Monitoring Concept for Revised Unit Load on NPS (비점오염원 원단위 개정을 위한 조사연구 방향)

  • Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.4
    • /
    • pp.429-433
    • /
    • 2007
  • Many researchers have made a study of NPS unit-loads and the scientific evaluation method which need for formulating and enforcing a Total Maximum Daily Load (TMDL) management system and modifying a pollutant discharge loadings function. Some showed the event mean concentration (EMC) on single land-use. For the most parts, as the results showed on multiple land-uses, those cannot be used for NPS unit-loads calculation. NPS runoff shows various phenomena depending on rainfall monitoring data, therefore sampling methods and frequency for NPS monitoring must be different from the general monitoring for water quality trend assessment.