• Title/Summary/Keyword: Unit Price

Search Result 602, Processing Time 0.034 seconds

A Study on Standard Unit Price Analysis of e-learning & Postal Distance Learning (인터넷 및 우편 원격 기관 훈련비용 기준단가 분석 연구 공학교육에 관한 연구)

  • Rha, Hyeon-Mi
    • Journal of Engineering Education Research
    • /
    • v.14 no.3
    • /
    • pp.61-71
    • /
    • 2011
  • Korea has introduced the levy-grand system in the vocational learning finance. The standard unit price system of training cost was utilized in the distribution of training budget and the reimbursement system including total or partial training cost return has been operated in the corporate training after completing the learning course particularly. The standard unit price was calculated in the base of analyzing on supporting budget by the government per training institutions and corporate payment decision to learning institutions. The proposing standard unit price system of training cost was analyzed in the current standard price unit of training cost and then an improvement policy and the implication are derived from it. At the result of this study, the current government supporting level to e-learning and postal distance learning indicates good status.

Basic Research for Construction Standard Unit Price and BIM library Linkage (표준시장단가 및 BIM 라이브러리 연계 활용에 관한 기초연구)

  • Jin, Zheng-xun;Baek, Seung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.251-252
    • /
    • 2021
  • With the recent emergence of the 4th Industrial Revolution, the government is promoting the development of smart construction technology and institutional improvement through various policies to induce cutting-edge and technological innovation in the construction industry. As part of such smart construction technology, the application of BIM is being activated, and related regulations and guidelines are constantly being supplemented. In relation to BIM, there are many studies on the fields of library, design standards etc., but research on specific unit price utilization and unit price DB construction for calculating construction cost is insufficient. Therefore, in this study, a basic study was conducted on the linkage of the construction standard market unit price and the BIM library. Based on the basic research conducted in the future, we intend to establish specific standards for calculating BIM-based construction costs.

  • PDF

A Feasibility Study Method for Apartment Remodeling by Hedonic Model (헤도닉 모델을 활용한 공동주택 리모델링 사업성 평가방법)

  • Yu, In-Geun;Kim, Cheon-Hak;Yun, Yeo-Wan;Yang, Geuk-Yeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.3
    • /
    • pp.117-124
    • /
    • 2004
  • This study aims to evaluate the feasibility of remodeling business by predicting the future price of apartment house after remodeling using Hedonic Price Model. The data concerning such 8 independent variables as location, unit size, unit plan, landscape, parking, the number of elapsed years after completion, number of units, brand per apartment unit from 25 regions in Seoul metropolitan city were collected and evaluated by established evaluation criteria. The coefficients affecting the price of apartment unit were made by way of linear multi-regression and put into Hedonic Price Model. The feasibility evaluation model for apartment was made and verified by data of remodelled apartment. The predicted results using suggested evaluation model coincide with actual apartment market situations.

The Influence of Community Facilities on the Price of Housing with Block Unit on the Price of Housing with Block Unit: Focused on 82 Complexes in the Seoul Metropolitan Area (블록단위 단독주택의 주민공동시설이 가격에 미치는 영향에 관한 연구: 수도권 82개 단지를 중심으로)

  • Kim, Ji-Hun;Jo, Hang-Hun
    • Land and Housing Review
    • /
    • v.11 no.3
    • /
    • pp.1-9
    • /
    • 2020
  • This study fulfills an empirical analysis how the physical factors affect the formation of housing price with the block unit. Block unit houses are a type of housing that pursues comfort and convenience in that the characteristics of individual houses and apartment houses are mixed. Existing studies have focused only on the physical characteristics of various planning elements such as block-type residential complexes. Nevertheless, it is not known whether the physical characteristics of block-type residential complexes reflect the preferences of actual consumers. In addition, there are no sufficient studies on how to evaluate them from the market side. In this study, block-level detached housing sites the target complexes with 10 or more households built between 2002 and 2019. The target areas for analysis are 163 complexes in Paju, Namyangju, Goyang, Suwon, Yongin, Ansan, Gimpo, Incheon, Seongnam, Hwaseong and Gwangju, Gyeonggi-do. The physical elements that make up the unit housing were classified through factor analysis. Finally, regression analysis was conducted to establish the basis determining the price-forming factors. As a result of the analysis, the factors that influenced the price were the site area and the number of community facilities. The variable with negative influence was the distance from Seoul. Based on the results of this study, it can be said that the influence on price formation in various areas was confirmed by presenting the relationship between the facility composition and price of a detached house.

A Study on Profitability of Power Plant for Landfill Gas (매립가스 자원화를 위한 가스엔진 발전의 수익성에 관한 연구)

  • Kim, Oh-Woo;Lee, Jeong-Il
    • Korean Business Review
    • /
    • v.19 no.2
    • /
    • pp.69-94
    • /
    • 2006
  • Landfill gas is a mixture of methane and carbon dioxide produced by the bacterial decomposition of organic wastes, and it is considered to produce bad smells and pollute the environment. Economic trials and the developments of landfill gas, as an alternative energy resource, become known at the recent years. Resource development of landfill gas, which is managed by Korea up to now, is for the most part generation using gas engine. Medium BTU and High BTU are considered for the power generation as well. I\10st income of generation using gas engine is selling charge through a power plant. Expecting to manage the power plant for up to 10 years, the analysis based on revenue and expenditure shows when the unit price is 65.2 Won and the operating rate reaches 90%, it is possible to be into the black in 2012 without considering additional financial expense. It was also analyzed that the profit at a unit price of 85 Won under the anticipated rising unit price by the operating rate of 71% is larger than at the operating rate of 90% under limited unit price of 65.2 Won. It means to manage the power plant at a unit price of 65.2 Won and the operating rate must be higher than 90% for economic logicality. If we assume that the operating rate is 90% and it increases the unit price, the unit price must be higher than 85 Won for the management of a power plant. Analysis of changing a unit price, however, might be expected to have a gradual rise of prices. If there is no price rising and additional income related to CDM(Clean Development Mechanism) and emission trading upon Kyoto protocol, the management of a power plant using gas engine will get financial difficulties because of many operating expenses. However, since landfill gas is considered as a worthy energy resource for the guarantee of sustainable development and for the equity between recent generation and future generation, the development of it must be accomplished by the government's additional supporting and efforts under the interest of all stakeholder who are involved.

  • PDF

Estimating the Home-Purchase Cost of Seoul Citizens

  • Oh, Deok-Kyo;Burns, James R.
    • Korean System Dynamics Review
    • /
    • v.12 no.2
    • /
    • pp.5-36
    • /
    • 2011
  • Seoul citizens are currently suffering from high housing price. Home prices have risen more rapidly than salaries so owning a housing unit (apartment, condominium, or single-family home) in Seoul is becoming more difficult than ever. Therefore, this research examines the behavior of average Seoul citizen in owning housing unit in Seoul, Korea, particularly in terms of the length of time required to afford a house unit. This research estimates that it will take about 18.75 years in maximum after getting a job (12.75 years after purchasing the housing unit) to own housing unit in Seoul that is currently valued at $300,000 where the growth rate of income is 2.97% and consumption price increases at a rate of 2.95% per annum. Finally in this research, the optimal growth rate of housing price is estimated ranged from 3.5 to 4.0% minimizing the loan payoff period.

  • PDF

Study of a Online Survey System for Monitering of Construction Cost on Construction Site (건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF

BIM-based Priority Activity in Construction Standard Unit Price (BIM기반 표준시장단가 우선적용 공종 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.204-205
    • /
    • 2022
  • Recently, the application of BIM has been continuously expanded according to various government policies, and the application performance is being analyzed in BIM projects such as roads and railways. In line with this trend, the government is making additional efforts to introduce full-scale design BIM. The BIM design in the public sector is directly related to the estimated price. However, looking at the current status of BIM introduction, there is no support system in place for calculating the estimated price. Therefore, this study intends to analyze the priority activity that is easy to develop BIM unit price among the construction standard unit Price of construction work. In this study, in order to derive the BIM-based priority activity, BIM application statements and application guidelines were analyzed. As a result of the analysis, cast-in-place concrete construction (civil engineering) and reinforced concrete construction (architecture) were deduced as suitable construction activities for the preferential application of BIM. Since the results presented in this study are a rough analysis, it is judged that additional detailed analysis is necessary for the future.

  • PDF

A Study on Profitability of Power Plant for Landfill Gas (매립가스 자원화를 위한 가스엔진 발전의 수익성에 관한 연구)

  • Kim, O-U;Lee, Jeong-Il
    • 한국산학경영학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.147-170
    • /
    • 2006
  • Landfill gas is a mixture of methane and carbon dioxide produced by the bacterial decomposition of organic wastes, and it is considered to produce bad smells and pollute the environment. Economic trials and the developments of landfill gas, as an alternative energy resource, become known at the recent years, Resource development of landfill gas, which is managed by Korea up to now, is for the most part generation using gas engine. Medium BTU and High BTU are considered for the power generation as well. Most income of generation using gas engine is selling charge through a power plant. Expecting to manage the power plant for up to 10 years, the analysis based on revenue and expenditure shows when the unit price is 65.2 Won and the operating rate reaches 90%, it is possible to be into the black in 2012 without considering additional financial expense, It was also analyzed that the profit at a unit price of 85 Won under the anticipated rising unit price by the operating rate of 71% is larger than at the operating rate of 90% under limited unit price of 65.2 Won. It means to manage the power plant at a unit price of 65.2 Won and the operating rate must be higher than 90% for economic logicality. If we assume that the operating rate is 90% and it increases the unit price, the unit price must be higher than 85 Won for the management of a power plant. Analysis of changing a unit price, however, might be expected to have a gradual rise of prices. If there is no price rising and additional income related to CDM(Clean Development Mechanism) and emission trading upon Kyoto protocol, the management of a power plant using gas engine will get financial difficulties because of many operating expenses. However, since landfill gas is considered as a worthy energy resource for the guarantee of sustainable development and for the equity between recent generation and future generation, the development of it must be accomplished by the government's additional supporting and efforts under the interest of all stakeholder who are involved.

  • PDF

A Study on the Building of Remodeling Evaluation Model (리모델링 사업성 평가 모델 구축에 관한 고찰)

  • Yoo In-Geun;Kim Chun-Hag;Yoon Yer-Wan;Yang Keek-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.3 s.21
    • /
    • pp.67-73
    • /
    • 2006
  • This study aims to evaluate the feasibility of remodeling business by predicting the future price of apartment house after remodeling using Hedonic Price Model. The data concerning such 9 independent variables as location, unit size, unit plan, landscape, parking, the number of elapsed years after completion, number of units, mechanical performance, interior from 25 regions in Seoul metropolitan city were collected and evaluated by established evaluation criteria. The coefficients affecting the price of apartment unit were made by Ivay of linear multi-regression and put into Hedonic Price Model. The feasibility evaluation model for apartment was made and verified by data of remodelled apartment. The predicted results using suggested evaluation model coincide with actual apartment market situations.