In today's uncertain economic environment, economic risk is inherent in making large investments on manufacturing facilities. It is, therefore, practically meaningful to divide investment over multiple periods, reducing the risk of investment. Then, the cash-flow over the entire planning horizon would comprise positive inflow and negative outflow. In this case, in general, evaluation by internal rate of return (IRR) is not feasible, because multiple IRRs are involved. This paper deals with a problem of evaluating profitability, as well as risk, of investment alternatives made in multiple times of investment over the entire horizon. Typically, an additional investment is required after the initial one, for expanding manufacturing capacity or other reasons. The paper pays attention to a unit cash-flow over two periods, decomposing the total cash-flow into a series of unit cash-flow patterns. It is easy to evaluate profitability of a unit cash-flow by using IRR. The total cash-flow can be decomposed into the series of two types of unit cash-flows: an investment type one (negative-positive) and the borrowing type one (positive-negative). This paper, therefore, proposes a method in which only the borrowing type unit cash-flow is eliminated in the series by converting total cash-flow using capital interest rate. Then, a unique IRR can be obtained and the profitability is evaluated. Thus, the paper extends the method of IRR so that it may help decision making in complicated cash-flow pattern observed in practice.
Journal of Institute of Control, Robotics and Systems
/
v.11
no.11
/
pp.956-962
/
2005
This paper presents an integrated analysis of production and financing decisions. We assume that a cash storage unit is installed to manage the cash flows related with production activities such as raw material procurement, process operating setup, Inventory holding cost and finished product sales. Temporarily financial investments are allowed for more profit. The production plant is modeled by the Batch-Storage Network with Recycle Streams in Yi and Reklaitis (2003). The objective function of the optimization is minimizing the opportunity costs of annualized capital investment and cash/material inventory while maximizing stockholder's benefit. No depletion of all the material and cash storage units is major constraints of the optimization. A novel production and inventory analysis formulation, the PSW(Periodic Square Wave) model, provides useful expressions for the upper/lower bounds and average level of the cash and material inventory holdups. The expressions for the Kuhn-Tucker conditions of the optimization problem can be reduced to two subproblems and analytical lot sizing equations under a mild assumption about the cash flow pattern of stockholder's dividend. The first subproblem is a separable concave minimization network flow problem whose solution yields the average material flow rates through the networks. The second subproblem determines the decisions about financial Investment. Finally, production and financial transaction lot sizes and startup times can be determined by analytical expressions as far as the average flow rates are calculated. The optimal production lot and storage sizes considering financial factors are smaller than those without such consideration. An illustrative example is presented to demonstrate the results obtainable using this approach.
In this paper, the techno-economic analysis of glycerol steam reforming for $H_2$ production capacity of $300m^3\;h^{-1}$ was carried out. The process of glycerol steam reforming was constructed by using Aspen $HYSYS^{(R)}$, a commercial process simulator, and parametric studies for the effect of the operating temperature on $H_2$ production was performed. Moreover, the economic analysis was conducted through an itemized cost estimation, sensitivity analysis (SA) and cash flow diagram (CFD), and the unit $H_2$ production cost was 5.10 $ ${kgH_2}^{-1}$ through the itemized cost estimation of glycerol steam reforming for $H_2$ production capacity of $300m^3\;h^{-1}$. SA was employed to identify key economic factors and various economic indicators such as net present value (NPV), discounted payback period (DPBP), and present value ratio (PVR) were found according to $H_2$ selling price using CFD.
International conference on construction engineering and project management
/
2015.10a
/
pp.210-212
/
2015
The growth-share matrix is a portfolio planning tool developed by the Boston Consulting Group (BCG) to assist competitive positioning in the international market including those in the construction industry. This matrix is helpful in balancing the firm's cash-flow, and it can suggest strategic directions for each business unit. However, its effectiveness and applicability have long been debated in the academic field due to the complex and unique industrial context of construction. To solve the dispute, this research clarifies the applicability of theories underlying the growth-share matrix to the construction industry. Empirical research based on actual financial data of Korean construction firms is adopted for the statistical analysis including one-way analysis of variance and correlation analysis. The results of this research show that empirical findings on the relationship between performance variables. In this context, this research can provide important insights on the concept of portfolio management in the construction industry.
This paper deals with two problems of optimal portfolio strategies in continuous time. The first one studies the optimal behavior of a firm who is forced to withdraw funds continuously at a fixed rate per unit time. The second one considers a firm that is faced with an uncontrollable stochastic cash flow, or random risk process. We assume the firm's income can be obtained only from the investment in two assets: a risky asset (e.g., stock) and a riskless asset (e.g., bond). Therefore, the firm's wealth follows a stochastic process. When the wealth is lower than certain legal level, the firm goes bankrupt. Thus how to invest is the fundamental problem of the firm in order to avoid bankruptcy. Under the case of different lending and borrowing rates, we obtain the optimal portfolio strategies for some reasonable objective functions that are the piecewise linear functions of the firm's current wealth and present some interesting proofs for the conclusions. The optimal policies are easy to be operated for any relevant investor.
With worldwide efforts to increase the portion of renewable energy for $CO_2$ reductions, a lot of attention has been paid to P2G (power-to-gas) in Europe and Japan to efficiently utilize the surplus electricity. In this paper, economic feasibility analysis has been carried out for P2G using PEM water electrolysis by reflecting current economic status in Korea. In addition, efficiency and electricity price required to be competent in Korean market were provided. Based on cash flow diagrams, unit production costs for $H_2$ and $CH_4$ were estimated and profitability of P2G using PEM water electrolysis was analyzed.
In this research, schedule optimization is defined as balancing the number of workers while keeping the demand and needs of the project resources, creating the perfect schedule for each activity. Therefore, when one optimizes a schedule, multiple potentials of schedule changes are assessed to get an instant view of changes that avoid any over and under staffing while maximizing productivity levels for the available labor cost. Optimizing the number of workers in the scheduling process is not a simple task since it usually involves many different factors to be considered such as the development of quantity take-offs, cost estimating, scheduling, direct/indirect costs, and borrowing costs in cash flow while each factor affecting the others simultaneously. That is why the optimization process usually requires complex computational simulations/modeling. This research attempts to find an optimal selection of daily maximum workers in a project while considering the impacts of other factors at the same time through OPEN BIM based multiple computer simulations in resource leveling. This paper integrates several different processes such as quantity take-offs, cost estimating, and scheduling processes through computer aided simulations and prediction in generating/comparing different outcomes of each process. To achieve interoperability among different simulation processes, this research utilized data exchanges supported by building SMART-IFC effort in automating the data extraction and retrieval. Numerous computer simulations were run, which included necessary aspects of construction scheduling, to produce sufficient alternatives for a given project.
International conference on construction engineering and project management
/
2007.03a
/
pp.800-809
/
2007
Current payment methods have many faults which are detrimental to the formation and completion of a project. This includes the use of unfair payment terms, pricing strategies and payment mechanisms between the contracting parties. This resulted in being criticised and remain in doubt, the use of current payment methods to reward good contractors and to distinguish poorly performed construction firms. In order to have an insight into this issue, a structured survey was conducted amongst UK construction practitioners. It was found that traditional pricing methods (i.e. lump sum and unit price), payment methods (i.e. interim valuation) and retention still dominate current practice. The empirical findings show that there are significant differences in the use of pricing and payment methods (when making and receiving payments) in construction. Significant differences also found in the factors affecting the choice of pricing methods when making (and receiving) construction payments. The paper concludes with analysis of the findings and future direction of research in payment systems is also provided.
Private stevedoring companies are leasing and operating the container terminals of the Busan Port. The total amount of lease fees private stevedoring companies paid in 2010 reached 161 billion wons, an approximately 66 percent of the total revenue of the Busan Port Authority(BPA). In other words, lease fees are the most important revenue source for BPA. However, the lease fee assessment system of Busan container terminals goes against the principle of equity due to different assessment methods and criteria adopted by each container terminal. Therefore, the purpose of the study is to analyze the systematic problems of the lease fee assessment system that is used at Busan container terminals, and propose a new standardized scheme with a case study on the new system. In order to standardize the assessment system, the assessment methods need to be simplified by using the Discounted Cash Flow(DCF) method. In addition, the assessment criteria such as assessment duration, discount rates, price indexes, estimated container throughputs, sales unit price per TEU, operation costs, including labor costs, need to be standardized as well. The new standardized assessment system can be applied to estimate lease fees for new terminals. However, for existing terminals to run the new system, factors such as assessment duration, discount rates, price indexes, estimated container throughputs, investment and re-investment costs, and maintenance & repair costs of the new system should be changed slightly.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.