• Title/Summary/Keyword: Underwater Pile Monitoring

Search Result 4, Processing Time 0.021 seconds

Drivability Monitoring of Large Diameter Underwater Steel Pipe Pile Using Pile Driving Analyzer. (수중 대구경강관말뚝의 항타관입성 모니터링을 위한 PDA 적용 사례)

  • Kim, Dae-Hak;Park, Min-Chul;Kang, Hyung-Sun;Lee, Won-Je
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.11-19
    • /
    • 2004
  • When pile foundation constructed by driving method, it is desirable to perform monitoring and estimation of pile drivability and bearing capacity using some suitable tools. Dynamic Pile Monitoring yields information regarding the hammer, driving system, and pile and soil behaviour that can be used to confirm the assumptions of wave equation analysis. Dynamic Pile Monitoring is performed with the Pile Driving Analyser. The Pile Driving Analyser (PDA) uses wave propagation theory to compute numerous variables that fully describe the condition of the hammer-pile-soil system in real time, following each hammer impact. This approach allows immediate field verification of hammer performance, driving efficiency, and an estimate of pile capacity. The PDA has been used widely as a most effective control method of pile installations. A set of PDA test was performed at the site of Donghea-1 Gas Platform Jacket which is located east of Ulsan. The drilling core sediments of location of jacket subsoil are composed of mud and sand, silt. In this case study, the results of PDA test which was applied to measurement and estimation of large diameter open ended steel pipe pile driven by underwater hydraulic hammer, MHU-800S, at the marine sediments were summarized.

  • PDF

Study on safety early-warning model of bridge underwater pile foundations

  • Xue-feng Zhang;Chun-xia Song
    • Structural Monitoring and Maintenance
    • /
    • v.10 no.2
    • /
    • pp.107-116
    • /
    • 2023
  • The health condition of of deep water high pile foundation is vital to the safe operation of bridges. However, pier foundations are vulnerable to damage in deep water due to exposure to sea torrents and corrosive environments over an extended period. In this paper, combined with aninvestigation and analysis of the typical damage characteristics of main pier group pile foundations, we study the safety monitoring and real-time early warning technology of the deep water high pile foundations, we propose an early warning index item and early warning threshold of deep water high pile foundation by utilizing a numerical simulation analysis and referring to domestic and foreign standards and literature. First, we combine the characteristics of structures and draw on more mature evaluation theories and experience in civil engineering-related fields such as dam and bridge engineering. Then, we establish a scheme consisting of a Early Warning Index Systemand evaluation model based on the analytic hierarchy process and constant weight evaluation method and apply the research results to a project based on the Jiashao bridge in Zhejiang province, China. Finally, we verify the rationality and reliability of the Early Warning Index Systemof the Deep Water High Pile Foundations.

A Study on the Excavation Method Near Fish Farms and Livestock (양만장 및 가축사육시설 인접지역 암굴착공법 검토에 관한 연구)

  • Lim, Dae-Kyu;Shin, Young-Cheol;Jun, Yang-Bae
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.23-32
    • /
    • 2013
  • Construction vibration such as explosive blast, hydraulic breaker, vibratory roller, pile driving noise and so on, injuries in areas around the construction sites. In particular, underwater sound caused by ground vibration is propagation such as structure borne noise. Vibration and underwater sound due to construction activities may cause injury to river, sea or land fish farms near construction sites. The purpose of present study is to measure the sound pressure level and frequency analysis of the underwater noise generated by ground vibration(Blasting, hydraulic crawler drill, hydraulic breaker, vibratory roller). Underwater noise were monitoring by a hydrophone (TC 4013) and recorded, analysis were made using a by software (Prosig).

Investigation on the Contamination of the Vicinity of Abandoned Coal Mines Located Near the Obong Darn and Preventive Measures (오봉댐 유역의 폐탄광에 의한 오염특성과 감소방안 연구)

  • Park, Sun Hwan;Chang, Yoon Young;Jeong, Jeong Ho;Son, Jeong Ho;Park, Seok Hyo
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.2
    • /
    • pp.143-156
    • /
    • 2007
  • This study has researched the management status and the pollution level of water, soil, stream sediments of 11 abandoned coal mines out of a total of 12 within Obong-Dam area except Bukyung mine, which was submerged when constructing Obong-Dam, and selected areas which are in needs to have pollution control facilities in the first place. From the results of examination on the runoff at the waste rock pile and mineheads, the runoff from Sueun mine (pH, Fe, Al), Samwon mine (pH, Al), Wangdo mine (pH, Al), Mose mine (pH, Fe, Al) and Daeryeong mine (pH) exceeded the permissible discharge standards of the water quality, but the water at merging point with Obong-Dam after joined with Doma branch satisfied both Water Quality Standards and Drinking Water Quality Standards. In regard to groundwater contamination, it is found that areas where exceeded the Drinking Water Quality Standards are Wangdo mine (pH), Jangjae mine (pH, Zn), Daeryeong mine (pH) whereas all areas satisfied Soil Contamination Warning Standards of Soil Environmental Conservation Law. When comparing a research result on underwater sediments of branches of abandoned mines to the EPA Guidelines for classification of great lakes harbor sediments, Dongguk Gaerim (Fe), Jungwon mine (Fe), Daebo mine (Mn), Samwon mine (Mn) and Daeryeong mine (Mn) showed mid-level of contamination, whereas Sueun (Fe, Mn), Daebo mine (Fe), Woosung mine (Fe, Mn), Wangdo mine (Fe, Mn), Mose mine (Fe) and Daeryeong mine (Fe) showed high-level of contamination. In addition, contamination levels of underwater sediments in Wangsan and Doma branch where abandoned mine's branches merge together, Wangsan branch showed no contamination at all whereas Doma branch shows mid-level of contamination which reflect the Doma branch is affected by waste rock pile and minehead runoff of the abandoned mines in the Doma branch area. It is concluded that Mose mine and Sueun mine required treatment of acid mine drainage. and Wangdo, Jungwon, and Samwon mines were in need of mine tailing and erosion control work. The Samwon mine additionally required a control system for closed minehead runoff. Although the Samwon mine reached a high concentration of Al, Mn $Ca^{2+}$, $SO{_4}^{2-}$ in the runoff, the levels decreased after it was combined with a tributary. It has been concluded that after further monitoring of the cause of pollution, a preventive measure system may be needed to be built.