• Title/Summary/Keyword: Underwater Pile Driving

Search Result 8, Processing Time 0.025 seconds

Drivability Monitoring of Large Diameter Underwater Steel Pipe Pile Using Pile Driving Analyzer. (수중 대구경강관말뚝의 항타관입성 모니터링을 위한 PDA 적용 사례)

  • Kim, Dae-Hak;Park, Min-Chul;Kang, Hyung-Sun;Lee, Won-Je
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.11-19
    • /
    • 2004
  • When pile foundation constructed by driving method, it is desirable to perform monitoring and estimation of pile drivability and bearing capacity using some suitable tools. Dynamic Pile Monitoring yields information regarding the hammer, driving system, and pile and soil behaviour that can be used to confirm the assumptions of wave equation analysis. Dynamic Pile Monitoring is performed with the Pile Driving Analyser. The Pile Driving Analyser (PDA) uses wave propagation theory to compute numerous variables that fully describe the condition of the hammer-pile-soil system in real time, following each hammer impact. This approach allows immediate field verification of hammer performance, driving efficiency, and an estimate of pile capacity. The PDA has been used widely as a most effective control method of pile installations. A set of PDA test was performed at the site of Donghea-1 Gas Platform Jacket which is located east of Ulsan. The drilling core sediments of location of jacket subsoil are composed of mud and sand, silt. In this case study, the results of PDA test which was applied to measurement and estimation of large diameter open ended steel pipe pile driven by underwater hydraulic hammer, MHU-800S, at the marine sediments were summarized.

  • PDF

Effects of Underwater Noise on Fishes (수중소음이 어류에 미치는 영향)

  • Yoon, Jong-Rak;Lee, Seong-Wook;Ahn, Soo-Yong;Park, Ji-Hyun;Bae, Jong-Woo;Ahn, Myung-Seog
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2006.11a
    • /
    • pp.739-746
    • /
    • 2006
  • Anthropogenic underwater sound such as ship radiated noise, pile driving noise. underwater explosive blast and so on, affects marine animals. This study describes the effects of underwater noise on fishes. The characteristics of noise, fish hearing and response, and sound propagation loss are analysed based on existing results and measured data in marine construction site. Finally, the safety zone range of fish on man made underwater noise is derived.

  • PDF

Movement range and behavior characteristics of Pagrus major by acoustic telemetry in Byeonsan Peninsular, Korea (음향 텔레메트리에 의한 변산반도에서의 참돔(Pagrus major)의 이동 범위 및 행동 특성)

  • HEO, Gyeom;HEO, Min-A;KANG, Kyoungmi;HWANG, Doo-Jin;SHIN, Hyeon-Ok
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.57 no.1
    • /
    • pp.34-44
    • /
    • 2021
  • In order to collect basic information of response behavior of red seabream (Pagrus major) during pilling, works for constructing wind power station in Byeonsan Peninsular, Korea were investigated. Four cultured red seabream CRB1 to CRB4 [total length (TL): 27.1 ± 1.0 cm; body weight: 359 ± 30 g] were tagged with an acoustic tag and used in experiment. CRB1 and CRB2 to CBR4 were released on the sea surface at same time around the constructing site of the wind power plant on September 22, 2017 and July 18, 2018, respectively. The tracking of the CRB1 to CRB2 and CRB3 to CRB4 were conducted for two hours, approximately, using VR100 receiver including a directional hydrophone and VR2W receivers array consisted of 19 presence/absence receivers (VR2W receivers), respectively. The underwater noise level before (no pile driving works) and during pile driving works was measured 116.0-118.0 dB (re 1��Pa) and a maximum of 160 dB (re 1��Pa), respectively. CRB1 moved about 6.0 km with average swimming speed of 80.2 ± 20.5 cm/s for 2.1 hours without pile driving work. The average water depth of the sea bed on the route of CRB1 was 9.1 ± 0.4 m. CRB2 moved about 7.3 km with the average swimming speed of 96.8 ± 27.1 cm/s for 2.1 hours with pile driving work. The water depth of the sea bed on the route of CRB2 was 11.9 ± 0.6 m. At results of the Rayleigh's z-test two fishes CRB1 and CRB2 showed significant directionality in the movement (p < 0.01). Movement mean angles of CRB1 and CRB2 were 92.7 and 251.8°, respectively. CRB2, CRB3 and CRB4 exhibited the escaping behavioral response from the noise of source during the pile driving work. The swimming speed of the CRB2 exposed on the heavy underwater noise stimuli due to the pile driving work was 1.21 times faster than that of the CRB1 exposed on the ambient underwater noise in the study site.

Analysis of the behavior of gray rockfish (Sebastes schlegelii Hilgendorf) on the construction of wind power generators in the sea area around Byeonsan Peninsula, Korea (변산반도 주변해역에서 풍력발전기 건설공사에 대한 조피볼락(Sebastes schlegelii Hilgendorf )의 행동분석)

  • HEO, Gyeom;HWANG, Doo-Jin;MIN, Eun-Bi;OH, Sung-Yong;PARK, Jin Woo;SHIN, Hyeon-Ok
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.55 no.2
    • /
    • pp.129-137
    • /
    • 2019
  • This study was conducted to investigate the effects of underwater noise caused by pile driving during marine construction on fish. In this study, the three gray rockfish were released about 1 km away from the construction site of wind power generation on July 18, 2018 and traced using two acoustic telemetry techniques. The behavior of the fish was analyzed by calculating the moving distance, swimming speed and direction of the gray rockfish. In the results of the acoustic tracking using the ship, the rockfish moved about 2.11 km for about two hours at a speed of $0.28{\pm}0.14m/s$ (0.94 TL/s). The bottom depth of the trajectory of the rockfish was $1.0{\pm}0.6m$ on average. There was a significant directionality in swimming direction of the gray rockfish, and there was no significant correlation between the swimming direction and tidal current direction. Moving distance during 5 minutes (5MD) during pile driving and finishing operations between rock surface and bedrock were 0.94-0.96 times (76.0-77.0 m) and 1.81-2.73 times (146.0-219.5 m), respectively, compared with no pile driving. This study is expected to be used as a basic data of fish behavior research on underwater noise.

A Study on the Excavation Method Near Fish Farms and Livestock (양만장 및 가축사육시설 인접지역 암굴착공법 검토에 관한 연구)

  • Lim, Dae-Kyu;Shin, Young-Cheol;Jun, Yang-Bae
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.23-32
    • /
    • 2013
  • Construction vibration such as explosive blast, hydraulic breaker, vibratory roller, pile driving noise and so on, injuries in areas around the construction sites. In particular, underwater sound caused by ground vibration is propagation such as structure borne noise. Vibration and underwater sound due to construction activities may cause injury to river, sea or land fish farms near construction sites. The purpose of present study is to measure the sound pressure level and frequency analysis of the underwater noise generated by ground vibration(Blasting, hydraulic crawler drill, hydraulic breaker, vibratory roller). Underwater noise were monitoring by a hydrophone (TC 4013) and recorded, analysis were made using a by software (Prosig).

Development and Application of Dry Process Caisson for Maintenance of Submerged Barber Structure

  • Lee, Joong-Woo;Lee, Seung-Chul;Oh, Dong-Hoon;Kwak, Seung-Kyu;Lee, Jeong-Su
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.10a
    • /
    • pp.105-114
    • /
    • 2006
  • Together with the trend of enhancement in domestic industrial development and economic progress due to import and export, the demand for construction of the roads, bridges, especially port facilities, and several coastal protection and ocean structures is increasing rapidly. MOMAF of Korean Government is driving construction of 9 new ports and renovation of the existing fishery ports. Among these structures most of bridge base, wharves, dolphins, quays, and jetties are being newly built of steel or concrete pile. As the base, supporting bulkheads, and piles are underwater after construction, it is difficult to figure out the status of structures and not enough to get maintenance and strengthen the structures. Every year, moreover, these works suck the government budget due to higher incomplete maintenance expense for protection from corrosions of structures and increased underwater construction period. for the purpose of cutting down the government budget, it is necessary to extend the life cycle of the existing structures. We developed a new method for maintenance of submerged structures near the waterline by allowing dry work environment with the floating caisson. The method shows easy to move around the working area and handle. It also showed not only a significant reduction of maintenance expenses and time for anti-corrosion work but also better protection. This will be a milestone to reduce the maintenance and construction expenses for the shore and water structures.

  • PDF

Development of Dry Process Caisson Method for Maintenance of Submerged Harbor Structure (수중 항만구조물의 유지보수를 위한 건식 케이슨 공법 개발)

  • Lee Joong-Woo;Oh Dong-Hoon;Kwak Seung-Kyu;Kim Sung-Tae
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.447-455
    • /
    • 2006
  • Together with the trend of enhancement in domestic industrial development and economic progress due to import and export, the demand for construction of the roads, bridges, especially port facilities, and several coastal protection and ocean structures is increasing rapidly. MOMAF of Korean Government is driving construction cf 9 new ports and renovation cf the existing fishery ports. Among these structures most of bridge base, wharves, dolphins, quays, and jetties are being newly built cf steel or concrete pile. As the base, supporting bulkheads, and piles are underwater after construction, it is difficult to figure out the status of structures and not enough to get maintenance and strengthen the structures. Every year, moreover, these works suck the government budget due to higher incomplete maintenance expense for protection from corrosions cf structures and increased underwater construction period. For the purpose cf cutting down the expense cf government budget, it is necessary to extend the life cycle of the existing structures. Therefore, we developed a new method for maintenance of submerged structures near the waterline by allowing dry work environment with the floating caisson. The method shows easy to move around the working area and handle. It also showed not only a significant reduction of maintenance expenses and time for anti-corrosion work but also better protection This will be a milestone to reduce the maintenance and construction expenses for the shore and water structures.

Development of Dry Process Caisson Method for Maintenance of Submerged Harbor Structure (수중 항만구조물의 유지보수를 위한 건식 케이슨 공법 개발)

  • Lee Joong-Woo;Oh Dong-Hoon;Kwak Seung-Kyu;Kim Sung-Tae
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.06b
    • /
    • pp.163-170
    • /
    • 2006
  • Together with the trend of enhancement in domestic industrial development and economic progress due to import and export, the demand for construction of the roads, bridges, especially port facilities, and several coastal protection and ocean structures is increasing rapidly. MOMAF of Korean Government is driving construction of 9 new ports and renovation of the existing fishery ports. Among these structures most of bridge base, wharves, dolphins, quays, and jetties are being newly built of steel or concrete pile. As the base, supporting bulkheads, and piles are underwater after construction, it is difficult to figure out the status of structures and not enough to get maintenance and strengthen the structures. Every year, moreover, these works suck the government budget due to higher incomplete maintenance expense for protection from corrosions of structures and increased underwater construction period. For the purpose of cutting down the expense of government budget, it is necessary to extend the life cycle of the existing structures. Therefore, we developed a new method for maintenance of submerged structures near the waterline by allowing dry work environment with the floating caisson. The method shows easy to move around the working area and handle. It also showed not only a significant reduction maintenance expenses and time for anti-corrosion work but also better protection. This will be a milestone to reduce the maintenance and construction expenses for the shore and water structures.

  • PDF