• Title/Summary/Keyword: Underground water

Search Result 1,335, Processing Time 0.033 seconds

An Experimental Study on the Waterproofing Performance of Expansion Equipment for Underground Structures (지하구조물용 신축이음장치의 방수성능에 관한 실험연구)

  • Lee, Young-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.9
    • /
    • pp.4302-4309
    • /
    • 2012
  • Underground structures without the expansion joint in the settled intervals, the underground structures may suffer from structural crack and the water leakage thereby resulting in the occurance of the efflorescence. In this study, the performance of new expansion joint used in underground structures were verified. The spacing of expansion joint was defined by the finite element analysis. Expansion length, resistance and waterproofing performance of developed expansion joint were confirmed by experiment.

Development of a Robot System for Monitoring and Repairing a Underground Pipe (지하매설 배관의 탐사 및 도장을 위한 로봇시스템 개발)

  • Yeo, Hee-Joo;Sung, Mun-Hyun
    • Proceedings of the KIEE Conference
    • /
    • 2007.04a
    • /
    • pp.346-348
    • /
    • 2007
  • Underground pipe is an instrument to transport rapidly and safely a lot of fluid like gas, oil, water supply and drain system. It acts like blood vessels of human body in a modern industry. As in this country, the pipe facilities have been constructing since 1970's. The pipes constructed for a long time ago are already starting to reveal the problem like corrosion and most of them are built underground. So for companies, the managing of the underground pipes is very hard because it needs high technology and a lot of money. So we made a new robot system to repair and maintain the pipes at a low price. This new robot is devised using pressing wall type to work inside 700${\sim}$900(mm) size pipe. And it has good carrying and working power.

  • PDF

Analysis of DC Traction Stray Current Influences on Buried Pipelines (전철 누설전류가 지하매설 배관엘 미치는 영향 해석)

  • Lee, H.G.;Ha, T.H.;Bae, J.H.;Ha, Y.C.;Kim, D.K.
    • Proceedings of the KIEE Conference
    • /
    • 2003.07b
    • /
    • pp.1273-1275
    • /
    • 2003
  • Corrosion of metallic structures arises when an electric current flows from the metal into the electrolyte such as soil and water. The potential difference across the metal-electrolyte interface, the driving force for the corrosion current, can emerge due to a variety of temperature, pH, humidity etc.. In this paper we analyze P/S potential and axial current of the pipeline with CP systems using BEM and DC traction stray current influences on buried pipelines.

  • PDF

Waterproofing Method for Waterproof Design of Underground Floor and Exterior Wall of Residential Buildings (공동주택 지하바닥 및 외벽부위 방수설계를 위한 방수공법 제안)

  • Lee, Jung-Hun;Seo, Hyun-Jae;Choi, Eun-Kyu;Song, Je-Young;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.233-234
    • /
    • 2019
  • Research has begun to change the waterproofing design of domestic underground structure parts from the current negative-side waterproof design to the positive-side waterproof design. For this, active review from the design stage to prevent the ingress of external ground water into the waterproofing measures of the underground of apartment buildings is needed. Therefore, in this study, proper waterproofing method for the major leaks identified in the previous studies and a waterproofing method for the waterproof design of the underground floor and the outer wall is proposed. It is hoped that a follow-up study, such as a review of field applicability, for the proposed methods will provide an alternative to secure leakage stability in waterproof design.

  • PDF

Groundwater Contamination (지하수 오염)

  • Jeon, Hyo-Taek
    • 수도
    • /
    • v.25 no.1 s.88
    • /
    • pp.25-35
    • /
    • 1998
  • Factors controlling water quality, water-quality standards, and normal ranges of concentrations in unpolluted fresh water and the sources of elements were explained in this paper. In particular, the sources of groundwater contamination such as the disposal of domestic waste water, landfills, chemical spills and leaking underground tanks, and agricultural and mining activities were discussed.

  • PDF

A study on the applicability of under ground structure using steel tubular roof in Korean geotechnical condition (대구경강관을 이용한 지하구조물 축조공법의 국내지반 적용성 연구)

  • Lee, Young-Bock;Kim, Jeong-Yoon;Park, Inn-Joon;Kim, Kyong-Gon;Lee, Jong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.4
    • /
    • pp.401-409
    • /
    • 2003
  • Recently, the development of underground structures is to be inevitably necessary due to the increase in population and traffic volume that has caused to the limit of urban land use and the heavy traffic jams. Therefore, underground structures such as subway, underground shopping centers, lifeline facilities and so on, have been increasingly constructed, On the other hand, several social problems have occurred during construction, i.e., ground subsidence, noise, and vibration. Therefore, safer and more beneficial methods for underground construction are on the demand. In this research, N.T.R.(New Tubular Roof) method has been modified and utilized for solving those problems and overcoming the difficulties connected with the bored tunnel construction of large underground openings in unfavorable ground, often under the water table, and with overburdens that are too shallow to solve problems of stability using traditional methods. The N.T.R. method has been modified to suit for Korean geotechnical conditions, and was made up for the weak points-the water leakage from walls and tops, the maintenance and the lack of stability-of the conventional methods. This paper dealt with the features and the applicability of N.T.R. Method based on the results from numerical analysis and data from in-situ monitoring system.

  • PDF

A Physical Model Test on Behavior of Shield-tunnel Lining according to Drain Conditions (배수조건에 따른 쉴드터널 라이닝의 거동연구를 위한 모형실험)

  • Choi, Gou-Moon;Yune, Chan-Young;Ma, Sang-Joon
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.5
    • /
    • pp.55-65
    • /
    • 2014
  • Most shield tunnels are designed based on the assumption of a undrained condition. But they are operated as drained tunnels in which underground water flows and passes through a drainage facility. Therefore, it is necessary that the drainage condition be considered in the shield tunnel design. In this research, new testing device which can simulate the underground tunnel located below ground water level, was developed. Total stress and pore water pressure were examined and an inflow water into an inner pipe was measured using the testing device. Test results showed that the total stress, which was the sum of effective stress and pore pressure, increased more in an undrained condition and an inflow water into an inner pipe was proportional to the water pressure but inversely proportional to the loading stress. Consequently, if the drainage is considered in the shield tunnel design, the more economical design can be expected because of the stress reduction of the lining.

A Study on Applicability of Water Pipe Detecting Using GPR (상수관로 탐사에 대한 지중레이더의 적용가능성에 관한 연구)

  • Lee, Won-Jong;Lim, Sung-Min;Choi, Yun-Soo;Min, Kwan-Sik
    • Journal of Cadastre & Land InformatiX
    • /
    • v.45 no.2
    • /
    • pp.131-147
    • /
    • 2015
  • In modern society, as to the underground urban infrastructure facilities(communication electricity water and sewage gas etc.) were contained many risks because of excavating. The exact position of underground facilities and the attribute information should be built in order to prevent accidents. As the result of analyzing the public surveying results from 2004 to 2009, it shows that low detecting rate of water pipeline which is only 52.4%, because the exploration of electromagnetic induction only detect metal pipeline and positioning survey only detect new pipeline before burying. Therefore development and verification of the correct and efficient exploration techniques are needed to improve the detecting rate. In this study, determined based on the location measurement results for the non-metal pipes and metal pipes before burial. It was compared with values that obtained through the ground penetrating radar and electromagnetic induction detecting. As a result, detecting rate of the concrete section showed a 100%, unpaved section showed a 94.7%, asphalt section showed 60%. So it confirmed the applicability of the ground penetrating radar at underground facilities detecting.

Evaluation of grout for reinforcing soft section in subsea tunnel (해저터널 연약 구간 보강용 그라우트 내구성 평가)

  • Moon, Junho;Jeong, Ghangbok;Xin, Zhenhua;Kim, Younguk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.947-956
    • /
    • 2018
  • Subsea tunnel built in abyssal zone is exposed to environment under high water pressure caused by seawater and etc., and this high pressure from underground water may facilitate leaching. In particular, since underground water can be easily flown in during construction, this might cause many problems related to cutoff water. Therefore, in order to secure safety, it is necessary to apply grouting equipment and materials which are appropriate to construction environment. Accordingly, in this research, evaluation was made on the physical characteristics of grouting materials (strength, leaching and etc. depending on curing methods for each of used materials and condition) which can be applied during subsea tunnel construction. As a result of this research, stable strength increase was found in CA and CSA type, and it is determined that no decrease in their durability was found, so these can be used as stable materials for structures under influenced by seawater.

Geothermal Effects on the Underground Water Conveyance Pipe System from Han River (한강수계 광역상수도 원수관의 지열 영향 조사)

  • Cho, Yong;Park, Jin-Hoon;Park, Tae Jin;Kim, Youngjoon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.171.2-171.2
    • /
    • 2010
  • Geothermal effects on the underground water conveyance pipe system have been investigated through the multiregional water supply system from Paldang water intake station. To make an investigation of raw water thermal energy, temperature sensors are installed the surface of the pipes of metropolitan area water supply system. In 2009 winter and early spring seasons, the monthly averaged temperatures at Paldang 2 intake stations are $1.94^{\circ}C$ in February, $4.96^{\circ}C$ in March, and $10.56^{\circ}C$ in April. After the transfer in 26.0 km distance of tunnel and buried pipe, the raw water temperatures are raised to $3.13^{\circ}C$, $6.04^{\circ}C$, and $11.39^{\circ}C$ respectively. As the temperature difference between the raw water and the air reduces, the temperature increasement is reduced by $1.19^{\circ}C$ in Feb., $1.08^{\circ}C$ in Mar., and $0.83^{\circ}C$ in Apr. Since the flowrate is over 1,150,000 $m^3$/day, it is estimated that the water exchanges a huge amount of heat over 1.0 Tcal a day with the ground.

  • PDF