• 제목/요약/키워드: Underground station

검색결과 316건 처리시간 0.03초

A new decision method for construction scheme of shallow buried subway station

  • Qiu, Daohong;Yu, Yuehao;Xue, Yiguo;Su, Maoxin;Zhou, Binghua;Gong, Huimin;Bai, Chenghao;Fu, Kang
    • Geomechanics and Engineering
    • /
    • 제30권3호
    • /
    • pp.313-324
    • /
    • 2022
  • With the development of the economy, people's utilization of underground space are also improved, and a large number of cities have begun to build subways to relieve traffic pressure. The choice of subway station construction method is crucial. If an inappropriate construction method is selected, it will not only waste costs but also cause excessive deformation that may also threaten construction safety. In this paper, a subway station construction scheme selects model based on the AHP-fuzzy comprehensive evaluation. The rationality of the model is verified using numerical simulation and monitoring measurement data. Firstly, considering the economy and safety, a comprehensive evaluation system is established by selecting several indicators. Then, the analytic hierarchy process is used to determine the weight of the evaluation index, and the dimensionless membership in the fuzzy comprehensive evaluation method is used to evaluate the advantages and disadvantages of the construction method. Finally, the method is applied to Liaoyang east road station of Qingdao metro Line 2, and the results are verified by numerical simulation and monitoring measurement data. The results show that the model is scientific, practical and applicable.

상용 휴대폰을 이용한 LBS 시스템 구축 (Development of LBS used cellular phone)

  • 이경규;이용우
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 한국정보통신설비학회 2007년도 학술대회
    • /
    • pp.185-190
    • /
    • 2007
  • This article describes a development CDMA LBS in order to apply to "Control System of Underground Infrastructure Fire Accident" which one of U-City Projects of Seoul City. Our goal guides taking shelter of the sufferer it will not be able to use a GPS when the fire occurs from subway station. There are Location measurement methods which measures the AOA(Angle of Arrival) of the signal which it sends with the MS(Mobile station) from the BS(Base station), an electronic delivery time (TOA:Time of Arrival) and the relative difference of electronic arrival time from Base stations (TDOA:Time Difference of Arrival). This time the error due to a multiplex course error and near-far problem and NLOS(Non Line of Sight). We are planning to construct the Test Bed which is an error below 1 meter.

  • PDF

시공단계를 고려한 대단면 정거장 터널 안정성 해석 (The stability analysis on large sectional tunnel station considering construction steps)

  • 강은구;김양운;안경철;한명식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.1062-1068
    • /
    • 2009
  • Urban construction has numerous difficulties due to ground weakness and various complaints from third party, so it is not economically efficient and constructability is not favorable. Therefore, underground, which has good ground conditions, was used for construction field and facilities such as stations, and they are scaled up to enhance accommodation of facility limitation and function of stations. Large section tunnel station construction has numerous risk factors such as work boundary of excavation equipment, a relaxation of stress concentration, a safety plan of tunnel stability, and so on. Therefore, by using large section tunnel station stability analysis considering construction step, we expect to analyze the latent problem during construction, and to stabilize a future project plan of a large section structure design by using an auxiliary method and a support design.

  • PDF

서울일대 암반을 대상으로 한 Geotechnical Information System (GTIS)의 개발 및 활용 (2) (A Development and utilization of Geotechnical Information System(GTIS) of the Rock Mass in Seoul Metropolitan Area(2))

  • 김정엽;박형동
    • 터널과지하공간
    • /
    • 제6권3호
    • /
    • pp.223-233
    • /
    • 1996
  • Geotechnical Information System (GTIS) for efficient management of three dimensional borehole data has been developed. Geotechnical maps in the vicinity of Bulkwangdong, Seoul station, Itaewon, Han river near Yuido, and Jungrangchon were constructed by Kriging method. In Bulkwangdong and Jungrangchon area where boundary between granite and gneiss is present, gneiss has been more weathered than granite, but in Seoul station and Itaewon area where the boundary is also present, granite has been more weathered than gneiss. It has been inferred that when Seoul granite intruded, the strength of gneiss in Bulkwangdong and Jungrangchon area was lowered by the attitude of foliation plane than in Seoul station and Itaewon area, so the gneiss has been easily fractured and weathered in Bulkwangdong and Jungrangchon area. Geotechnical map in the vicinity of Yuido showed that there is an NW-SE trend weakness zone that might be affected by major faults under Han river and it is expected that the fault zone may be present in construction area of Kyoungbu Highspeed Railway that lies below the Han river like the Subway Line No.5.

  • PDF

수소충전소 및 수소자동차의 사고 시나리오 개발 (Development of Accident Scenarios for Hydrogen Refueling Station and Fuel Cell Vehicle)

  • 박병직;김양균;임옥근
    • 자동차안전학회지
    • /
    • 제15권1호
    • /
    • pp.27-34
    • /
    • 2023
  • The registration rate of eco-friendly vehicles, such as hydrogen vehicles, is increasing rapidly, however, few first responders have experienced related accidents. Accident scenarios at hydrogen refueling stations and hydrogen vehicles on a road were investigated, and the relative importance of each scenario was analyzed using AHP analysis. Leakage, jet flame, and explosion that occurred inside and outside the hydrogen refueling station were reviewed, and the hydrogen gas explosion in the compartment showed the highest importance value. In case of the hydrogen vehicle, traffic accident statistics and actual accidents were used. It was analyzed that the hydrogen vessel explosion on the road due to the failure of TPRD and the leakage in the underground parking area were difficult to respond. The developed accident scenarios are expected to be used for first responder training.

재배방법(栽培方法)이 감자의 흑지병 발생(發生) 및 수량(收量)에 미치는 영향(影響) (Effects of Cultural Methods on Infection by Rhizoctonia Disease (Rhizoctonia solani $K\"{u}hn$) and Yield of Potato (Solanum tuberosum L.))

  • 박천수;함영일;신관용
    • 한국응용곤충학회지
    • /
    • 제26권4호
    • /
    • pp.251-255
    • /
    • 1987
  • 본(本) 시험(試驗)은 복토(覆土)깊이, 파종기(播種期), 최아방법(催芽方法) 및 고조제처리(枯凋劑處理)가 감자흑지병발생 및 수량(收量)에 미치는 영향(影響)을 구명(究明)하고자 남작(男爵)(Irish Cobbler)과 수미(秀美)(Superior)를 공시(供試)하여 실시(實施)하였으며 그 결과(結果)를 요약(要約)하면 다음과 같다. 1. 복토(覆土) 깊이가 깊을수록 출아(出芽)가 늦어졌으나 이병률(罹病率)은 뚜렷한 차이(差異)를 인정(認定)할 수 없었으며 수량(收量)은 10cm구(區)에서 증수(增收)하는 경향(傾向)이었다. 2. 이병률(罹病率)은 4월 28일 파종구(播種區)에서 가장 높았으며 5월(月) 이후(以後)의 파종간(播種間)에는 뚜렷한 차이(差異)가 없었다. 수량(收量)은 조기파종(旱期播種)인 4월(月) 28일(日) 파종(播種)에서 가장 낮았고 5월(月) 8일(日) 파종(播種)에서 가장 높았다. 3. 욕광최아처리구(浴光催芽處理區)에서 이병률(罹病率)이 가장 낮았고 수량(收量)은 가장 높았으며 무광최아(無光催芽)에서는 무최아(無催芽)보다도 이병률(罹病率)이 높았으며 수량(收量)은 낮았다. 4. 고조제처리(枯凋劑處理) 후(後) 수확시기(收穫時期)가 늦어질수록 이병괴경(罹病塊莖)이 증가(增加)하는 경향(傾向)을 보였는데 지상부(地上部) 고사(枯死) 후(後) $6{\sim}15$일(日)까지는 괴경이병율(塊莖罹病率)의 증가폭(增加幅)이 컸으나 그 후(後)부터는 완만(緩慢)하였다. 5. 나작(男爵)은 수미(秀美)보다 경(莖)의 이병률(罹病率)은 높았으나 괴경이병률(塊莖罹病率)은 낮은 경향(傾向)을 보였다.

  • PDF

도시철도역사에서 화재유동에 대한 병렬계산방법연구 (The development of parallel computation method for the fire-driven-flow in the subway station)

  • 장용준;이창현;김학범;박원희
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1809-1815
    • /
    • 2008
  • 본 연구는 병렬처리기법을 이용하여 지하역사 화재유동을 시뮬레이션 하였다. 화재해석 프로그램으로는 LES(Large Eddy Simulation)화재해석 프로그램 중 하나인 FDS(Fire Dynamics Simulation)를 사용하여 연구를 진행하였으며, 각 Node당 3.0Ghz_2set이 탑재된 6-node parallel Cluster장비를 사용하여 병렬계산을 수행하였다. 시뮬레이션 모델은 광주 금난로 4가 지하역사를 대상으로 하였으며, 총 시뮬레이션 시간은 600s로 하였다. 먼저 Single-CPU와 Multi-CPU를 이용한 병렬계산과의 결과 비교를 위하여 전체역사를 1-Mesh와 8-Mesh로 나누어 각각 Single-CPU계산과 Multi-CPU를 이용하여 계산결과를 비교분석 하였으며, Single-CPU에서 처리가 불가능한 격자수($15{\times}10^6$)를 가지고 승강장 중앙에서의 화재와 객차 내에서의 화재유동분석 하였다. 연구결과 Single-CPU 해석과 Multi-CPU를 이용한 병렬계산에 있어서, 해석결과의 차이는 거의 없는 것으로 나타났다. 또한 계산시간의 비교에서도 14개의 Mesh를 가지고 약 300만개의 격자를 사용한 경우에 있어서 2CPU(4core)와 7CPU(14core)의 계산시간은 1CPU에 비하여 각각, 2배, 5배의 차이를 보였다. 병렬처리기법의 도입으로 Single-CPU의 한계를 극복하여 보다 빠르고 정확한 결과값을 얻을 수 있을 것으로 기대된다. 향후 병렬처리기법연구에 있어서 계산효율성 증대를 위한 연구가 계속적으로 진행되어야 할 것이다.

  • PDF

터널 시공 중 3차원 절대변위 계측시스템의 개발과 적용 (Development of 3D absolute displacement monitoring system and its application at the stage of tunnel construction)

  • 방준호;김기영;정용훈
    • 한국터널지하공간학회 논문집
    • /
    • 제9권3호
    • /
    • pp.229-240
    • /
    • 2007
  • 터널 및 지하공간 시공 중 일상계측에서의 계측관리 효율성 및 고급의 내공변위 분석을 위해 3차원 광파기, 선단앵커정착형 타겟부착장치, 절대변위 계측관리 프로그램으로 구성된 3차원 절대변위 계측시스템을 구축하였다. 본 연구를 통해 3차원 절대변위 계측에 필요한 광파기의 종류와 사양을 제시하였고, 기존 타겟부착장치의 문제점을 개선한 선단앵커정착형 타겟부착장치에 대한 성능시험을 수행하여 우수한 시준거리와 측정정밀도를 확인하였다. 또한 절대변위 계측관리 프로그램에 대한 현장성능시험을 수행하여 얻어진 경향선/영향선 등 다양한 분석방법을 활용하여 막장전방의 연약대 존재 예측이 가능하였고, TSP탐사결과와 비교하여 정확성을 확인하였다.

  • PDF

지하철 역사 승강장 화재발생시 열/연기 거동 분석을 위한 실험 및 수치 연구(II) - 수치적 접근 - (Experimental and Numerical Studies on Heat/Smoke Behavior due to a Fire on Underground Subway Platform (II) - Numerical Approach -)

  • 장희철;김태국;박원희;김동현
    • 한국화재소방학회논문지
    • /
    • 제20권3호
    • /
    • pp.15-20
    • /
    • 2006
  • 본 연구는 상대식 지하철 역사에서 화재발생시 작동되는 두 가지 환기팬 풍량에 의한 열 및 연기 분포 특성 예측을 위하여 수치해석적 연구를 수행하였다. 터널연결부에서 발생되는 자연풍, 배기구 유속 및 온도 등 PART I에서 얻은 계측값을 경계조건으로 입력하였다. 배연용량에 따른 승강장 내의 열, 연기, 가시거리 그리고 유독가스 분포를 파악하기 위하여 2가지 경우를 고려하였다. Case I에서는 해당역사 현장에서 계측한 값을 Case II에서는 국가화재 안전기준(National Fire Safety Codes, NFSC 501)에서 제시한 배연량을 사용하였다. 수치해석 결과에서 보여주듯이 배기구의 유속 크기는 화재에 의한 열 및 연기유동에 크게 영향을 미치는 것을 알 수 있으며, 배연 풍량이 클수록 높은 제연효과를 나타내는 것을 확인 할 수 있었다.

복합환승센터 피난대피구역 적정 배치 방법론 개발 (Optimal Deployment for Evacuation Safety Zone at Intermodal Transfer Station)

  • 유소영;정은비
    • 한국ITS학회 논문지
    • /
    • 제18권1호
    • /
    • pp.27-42
    • /
    • 2019
  • 대심도 실내공간에서 직면하는 재난상황에서 재실자는 종합적인 상황인지가 불가능하며, 공간지각 능력 저하로 황금시간 내 탈출이 쉽지 않다. 주어진 시간내 피난대피가 어려운 상황에서는 최대한 안전한 구역으로 이동 가능한 설계를 제시하여야 하는데, 본 연구에서는 실내 공간 보행 통행량 기반 평가 시뮬레이션인 PATS (Pedestrian movement based Assessment Toolkit for Simulation)을 활용하여, 복합환승센터 피난대피구역 적정 위치 선정을 위한 분석 체계를 수립하고, 지하 6층 대심도 복합환승센터의 시나리오 분석을 통해 피난대피 경로 상 문제점을 도출하여 이에 적합한 피난대피 구역 적정 위치를 제안하였다.