• Title/Summary/Keyword: Underground space construction

Search Result 935, Processing Time 0.02 seconds

Numerical Investigation of the Radial Convergence of Circular Tunnel Excavated in Rock Mass for Generalized Hoek-Brown (일반화된 Hoek-Brown 암반에 굴착된 원형터널의 내공변위 특성 분석)

  • Lim, Kwang-Ok;Lee, Youn-Kyou
    • Tunnel and Underground Space
    • /
    • v.28 no.1
    • /
    • pp.59-71
    • /
    • 2018
  • Since the generalized Hoek-Brown (GHB) function predicts the strength of the jointed rock mass in a systematic manner by use of GSI index, it is widely used in rock engineering practices. In this study, a series of 2D elasto-plastic FE analysis, which adopts the GHB criterion as a yield function, was carried out to investigate the radial convergence characteristics of circular tunnel excavated in the GHB rock mass. The effect of the plastic potential function on the elasto-plastic displacement was also examined. In the analysis, the wide range of both the $K(={\sigma}_h/{\sigma}_v)$ and GSI values are considered. For each K value, the variation of the ratio of sidewall displacement to roof displacement was calculated with varying GSI values and the obtained displacement patterns were analysed. The calculation results show that the displacement ratio significantly depends not only on the K value but also on the range of GSI value. In particular, for lower range of GSI value, the displacement ratio pattern calculated in the elasto-plastic regime is opposite to that predicted by the elasticity theory. In addition, the variation of the radial displacement ratio with GSI value for different types of plastic potential function showed similar trend.

Evaluation of Mechanical Performance of a Segment Lining coated by a Sprayed Waterproofing Membrane by a Full-scale Loading Test (실물 재하실험에 의한 뿜칠 방수 멤브레인이 타설된 세그먼트 라이닝의 역학적 성능 평가)

  • Kang, Tae-Ho;Choi, Soon-Wook;Lee, Chulho;Park, Byungkwan;Kim, Jintae;Choi, Myung-Sik;Chang, Soo-Ho
    • Tunnel and Underground Space
    • /
    • v.28 no.1
    • /
    • pp.97-110
    • /
    • 2018
  • The application of sprayed waterproofing membrane with high adhesion and ductility is considered to be promising as a measure for repair and reinforcement of a tunnel structure. Therefore, a powder-type and one-component membrane prototype with high tensile and bond strengths was made in this study. Then, its reinforcement effect on a shield segment was evaluated by carrying out a series of full-scale loading tests of segment specimens on which the membrane was sprayed. From the tests, it was confirmed that the initial cracking loads increased by approximately 34% due to cracking retardation by membrane coating. Even though the increase of failure loads were not so high as cracking loads, the strain-softening behaviors were observed from specimens coated by the membrane. Therefore, it is expected that the membrane coated on the inner surface of a lining might be effective in preventing its brittle failure.

Calculation of Failure Load of V-shaped Rock Notch Using Slip-line Method (Slip-line법을 이용한 V형 암석 노치의 파괴하중 계산)

  • Lee, Youn-Kyou
    • Tunnel and Underground Space
    • /
    • v.30 no.4
    • /
    • pp.404-416
    • /
    • 2020
  • An analytical procedure for calculating the failure load of a V-shaped rock notch under two-dimensional stress conditions was developed based on the slip-line plastic analysis method. The key idea utilized in the development is the fact that the α-line, one of the slip-lines, extends from the rock notch surface to the horizontal surface outside the notch when the rock around the notch is in the plastic state, and that there exists an invariant which is constant along the α-line. Since the stress boundary condition of the horizontal surface outside the rock notch is known, it is possible to calculate the normal and shear stresses acting on the rock notch surface by solving the invariant equation. The notch failure load exerted by the wedge was calculated using the calculated stress components for the notch surface. Rock notch failure analysis was performed by applying the developed analytical procedure. The analysis results show that the failure load of the rock notch increases with exponential nonlinearity as the angle of the notch and the friction of the notch surface increase. The analytical procedure developed in this study is expected to have applications to the study of fracture initiation in rocks through wedge-shaped notch formation, calculation of bearing capacity of the rock foundation, and stability analysis of rock slopes and circular tunnels.

The Analysis of the Possibility for Using Converged Spatial Information(CSI) in National Territorial Planning - The Case Study of LH's Future Business about Land and Housing (융복합 공간정보의 국토계획 분야 활용가능성 분석 - LH 국토·주택관련 미래사업 예시를 중심으로)

  • Choi, Jun Young
    • Spatial Information Research
    • /
    • v.21 no.4
    • /
    • pp.71-81
    • /
    • 2013
  • Due to explosively increasing utilization in spatial information and a rapid development in geospatial technology related to national territorial and housing, there are increasing demands for converging spatial information on not only urban planning and real estate data but also newly generated data from smart phone, GPS to achieve comparative advantage of national territory. In this paper, we prospect the utilization of Converged Spatial Information(CSI) to future national territorial planning for the purpose of enhancing territorial competitiveness. For this purpose, considering the Korea Land and Housing corporation(LH) takes charge most of government's land and housing development projects, CSI usage of this company's 6 future business domains until 2029 were used as a case study. Also, 7 CSIs derived from literature review were surveyed to find the degree of CSI utilization in the national territorial future. In the analysis result, it was found that 3D data and mobile data among others have higher degree of utilization, and urban and regional development is the most highly utilizable domain for CSIs. After all, to revitalize the use of CSI in national territorial future, it is required to do a balanced construction of territorial use spatial information about marine use, coastal use, underground space besides land use.

Characteristics of the Horizontal Stress and the Possibility of Stress Induced Brittle Failure in Chuncheon-Yanggu Mountainous Region by the In-situ Stress Measurements (현장 측정에 의한 춘천-양구 산악지역 내 수평응력 분포와 취성파괴 가능성에 관한 연구)

  • Bae Seongho;Jeon Seokwon
    • Tunnel and Underground Space
    • /
    • v.15 no.2 s.55
    • /
    • pp.157-167
    • /
    • 2005
  • Current initial rock stress state is one of the key factors required to evaluate the stability and failure around an excavated opening and its importance increases as the construction depth become deeper and the scale of the rock structure become larger. In this paper, the study was performed to evaluate the characteristics of the regional stress state at Chuncheon-Yanggu mountainous region, the East-North part of Kyeonggi Massif. Forty nine field stress measurements in 9 boreholes were conducted at the depth from 20 m to 290 m by hydraulic fracturing method. The fracturing tracing works were carried out by acoustic televiewer scanning. The study results revealed that the different intial rock stress states presented at different formation rock type and the excessive horizontal stress state with stress ratio(K) close to 3.0 was measured at the depth of 200 m and deeper in the intrusive unite body of the study area. The results from the investigation of excessive horizontal stress and its effect on failure mode showed that there exist several points where the localized excessive horizontal stresses are big enough to potentially induce brittle failures around the future openings greater than 100 m in depth within the granite body of the study area.

Research Background and Plan of Enhanced Geothermal System Project for MW Power Generation in Korea (MW급 EGS 지열발전 상용화 기술개발사업의 추진 배경 및 계획)

  • Yoon, Woon-Sang;Song, Yoon-Ho;Lee, Tae-Jong;Kim, Kwang-Yeom;Min, Ki-Bok;Cho, Yong-Hee;Jeon, Jong-Ug
    • Tunnel and Underground Space
    • /
    • v.21 no.1
    • /
    • pp.11-19
    • /
    • 2011
  • Geothermal energy is believed to be an important source among the renewable energy sources to provide the base load electricity. Although there has been a drastic increase in the use of geothermal heat pump in Korea, there is no geothermal power plant in operation in Korea. Fortunately, the first EGS (Enhanced Geothermal System) Project in Korea has started in Dec 2010. This five year project is divided into two stages; two years for exploration and drilling of 3 km depth to confirm the minimum target temperature of 100 degrees, and another three years composed drilling 5 km doublet, hydraulic stimulation of geothermal reservoir with expected temperature of 180 degrees (40 kg/s) and construction of MW geothermal power plant in the surface. This EGS project would be a landmark effort that invited a consortium of industry, research institutes and university with expertises in the fields of geology, hydrogeology, geophysics, geomechanics and plant engineering.

Pillar Width of Twin Tunnels in Horizontal Jointed Rock Using Large Scale Model Tests (대형모형실험을 통한 수평 절리암반에서의 병설터널 이격거리)

  • Lee, Yong-Jun;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.20 no.5
    • /
    • pp.352-359
    • /
    • 2010
  • Stability of twin tunnels depends on the pillar width and the ground condition. In this study, large scale model tests were conducted for investigating the influence of the pillar width of twin tunnels on their behavior in the regular horizontal jointed rock mass. Jointed rocks was composed of concrete blocks. Pillar width of twin tunnels varied in 0.29D, 0.59D, 0.88D and 1.18D, where D is the tunnel width. During the test, pillar stress, lining stress, tunnel distortion, and ground displacement were measured. Lateral earth pressure coefficient was kept in a constant value 1.0. As a result, it was found that the pillar stress and the displacement of the ground and tunnel were increased by decreasing pillar width. The maximum displacement rate was measured just after the upper excavation in each construction sequence. And the maximum influence position was the right shoulder of the preceeding tunnel at the pillar side. It was also found that for the stability assessment the inner displacement was more critical than the crown displacement. The influence zone was formed at the pillar width 0.59D~0.88D that was smaller than 0.8D~2.0D, which was proposed by experience for a good ground condition. And it would be concluded that horizontal joints could also influence on the stability of the twin tunnels.

Application of Strength Reduction Method to Evaluation of Pillar Safety Factor in very Closely Spaced Tunnels (근접병설터널에서 필라부 안전율 평가를 위한 강도감소법의 적용성 연구)

  • Jun, Sung-Kwon;Yoon, Dong-Ho;Song, Jae-Joon;Kim, Se Hyung
    • Tunnel and Underground Space
    • /
    • v.29 no.5
    • /
    • pp.346-355
    • /
    • 2019
  • When evaluating pillar stability in very closely spaced tunnels, a local safety factor (strength/stress ratio) at the minimum width has been widely used. Tension bolts have been frequently applied as reinforcement for the cases where safety factors are less than 1.0 from FEM stress analysis. However, the local safety factor shows a constant value irrespective of the change in pillar width/tunnel diameter (PW/D) and the safety factor of the pillar is underestimated because the variation of deviation stress is relatively small even when the pre-stressing is applied to the tension bolt. In addition, the average safety factor proposed by Hoek and Brown(1980) was reviewed, but the pillar safety factor was relatively overestimated when the width of the pillar was increased. As an alternative, the SRM safety factor using shear strength reduction method shows the effect of changing the safety factor in the case of no reinforcement and tension bolt reinforcement as the pillar width/tunnel diameter(PW/D) changes. The failure shape is also similar to the previous limit theory result. In this study, the safety factor was evaluated without considering rock bolt and shotcrete to distinguish reinforcing effect of tension bolt.

A Study on the Ward Module according to the External Design of the Hospital (병원 외주부 디자인에 따른 병실모듈 연구)

  • Lee, Hyunjin;Park, Wonbae
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.3
    • /
    • pp.71-78
    • /
    • 2021
  • Purpose: It is important to plan the ward module at a time when the size of beds, the floor area, and the construction budget are all set prior to the hospital design. In this context this study aims (1) to derive various factors affecting the ward module, and (2) to analyze the appropriate room module according to the type. Methods: Design factors related to hospital modules are derived through precedential studies, and the types of ward elevation are classified by reviewing the drawings of 18 case hospitals. And the detailed dimensions and area of the derived elements are analyzed. Results: The X-axis modules of the ward are switched to long span structural columns of 9.9 m, 12.6 m and 13.2 m, but the ward modules still represent 6.6 m. The Y-axis module of the ward shows a dimension of 9 to 9.9m in the process of changing a multi-person room into a four-person room. Type A of curtain wall with columns located on the wall of the room and type B of curtain wall located in the center of the room are analyzed due to their variations. The square window type, which forms the elevation of the square window by exposing the columns to the elevation, and the outframe type, which protrudes from the structural columns and beams, have elevation designs limited. There are, however, no obstacles to the interior space of the hospital room, so the wall composition and furniture arrangement are expected to be free. The ward area of Curtain Wall Type A, which can secure an effective area of 5.9m*5.0m, are 52.1m2. The Curtain Wall Type A, Square window type, and the outframe type are 49.8m2. Implications: As part of the hospital standard module plan for economical and reasonable hospital building planning, a type was proposed in this study in conjunction with the external design. It is hoped that it be a base for standard module research linked together to the Central Treatment department, Outpatient department and underground parking lot.

Numerical Analysis on Effect of Stemming Condition in Mine Ventilation Shaft Blasting (광산 통기수갱발파에서 전색조건이 발파효율에 미치는 영향에 관한 수치해석적 연구)

  • Kim, Jun-ha;Kim, Jung-gyu;Jung, Seung-won;Ko, Young-hun;Baluch, Khaqan;Kim, Jong-gwan
    • Explosives and Blasting
    • /
    • v.39 no.3
    • /
    • pp.15-23
    • /
    • 2021
  • Ventilation shafts are pathways in mines and tunnels for the removal of dust or smoke during underground space construction and operation. In mines, blasting with long blast holes is preferred for the excavation of a ventilation shaft in the 10~20m long crown pillar section. In this case, the bottom part of the blast hole is completely drilled in order to determine the drilling error, and this causes a problem of lowering the explosive charge and blasting efficiency. It is possible to solve the problem of explosive loading and to increase the blast efficiency by covering the curb of the blasthole by using stemming material. In this study, simulations for the blasting of a ventilation shaft were performed with various stemming lengths and the blasthole diameters(45, 76mm) using AUTODYN 2D SPH(Smooth particle hydrodynamics) analysis technique. Also the optimal bottom stemming column was derived by checking the size of the boulder and burden line according to blasting. Analysis result, blasting efficiency is lessened in case of stemming length less than 30cm and the optimal length of the stemming material should be 30cm or higher to achieve high efficiency of blasting.