Deformation Characteristics of Underground Pipe with In-situ Soil CLSM (현장발생토 CLSM을 이용한 지하매설관의 변형특성)

  • 박재헌;이관호;조재윤;김석남
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.3
    • /
    • pp.129-139
    • /
    • 2004
  • During the construction of circular underground pipe, the non-proper compaction along the pipe and the decrease of compaction efficiency have been the main problems to induce the failure of underground pipe or facility. The use of CLSM (controlled low strength materials) should be one of the possible applications to overcome those problems. In this research, the small-scaled model test and the numeric analysis using PENTAGON-3D FEM program were carried out for three different cases on the change of backfill materials, including the common sand, the soil from construction site, and the CLSM.. From the model test in the lab, it was found out that the use of CLSM as backfill materials reduced the vertical and lateral deformation of the pipe, as well as the deformation of the gound surface. The main reason for reducing the deformation would be the characteristics of the CLSM, especially self-leveling and self-hardening properties. The measured earth pressure at the surround of the corrugated pipe using the CLSM backfills was smaller than those in the other cases, and the absolute value was almost zero. Judging from the small-scaled model test and FEM analysis, the use of CLSM as backfill materials should be one of the best choices reducing failure of the underground pipes.

Assessment of Criteria for selecting Rainwater Management Strategies (도시 물순환 건전화를 위한 빗물관리 계획요소 평가)

  • Lee, Tae-Goo;Han, Young-Hae
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.9-17
    • /
    • 2010
  • The purpose of this study is to draw out objective bases for selecting various applicable facilities in case of the establishment of rainwater management strategies. To do so, sixteen facilities were selected from decentralized rainwater management systems that induce rainwater infiltration and detention as well as centralized end-of-pipe type infiltration and detention facilities in local areas. With these facilities, it attempted to evaluate them in terms of sustainability, pollutant elimination, flood control capacity and costs and subsequently analyzed correlations between each characteristic. The outcomes of the analysis were as follows: First was the analysis of characteristics between decentralized rainwater management systems and end-of-pipe rainwater management systems. From the decentralized rainwater management systems, the mulden-rigolen system and grass swale at street level had the highest in the total of the four items while the totals of the underground detention tank and temporary detention site were highest in end-of-pipe rainwater management systems. After analyzing the correlation between different types of facilities and each variable, it can be said that decentralized rainwater management systems have a higher correlation than end-of-pipe rainwater management systems in terms of sustainability whereas the latter are better in flood control capacity than the former. Second, the analysis of correlation in variables of each facility is as follows: first, there is a negative correlation between sustainability value and flood control capacity value; and there is a positive correlation between flood control capability and pollutants elimination. In addition, it revealed that the higher the flood control and pollutant elimination capability the higher the facility costs. Based on these assessments, it is possible to use them as objective selection criteria for facility application in case of site development project or complex plan.

Real-time Underground Facility Map Production Using Drones (드론을 이용한 실시간 지하시설물도 작성)

  • NO, Hong-Suk;BAEK, Tae-Kyung
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.20 no.4
    • /
    • pp.39-54
    • /
    • 2017
  • Between 1998 and 2010, the computerization of underground facilities was completed in 84 cities. Since 2011, new pipelines have been laid or existing pipelines have been maintained, renovated, and renewed. To measure the exact location and depth of the exposure pipe, a map of underground facilities was created before filling the ground. This method is based on the time when the underground facilities of the National Geographic Information Institute Regulation No. 134 of the National Geographic Information Office revised in 2010 were drafted. The process of the drone taking the video is based on a theoretical basis of ground control points. The method works by removing all ground control points located outside of the error range and re-processing it for calculating the best result. Furthermore, using a drone-based spontaneous measuring method allows workers to obtain a high accuracy underground facilities map in error bound. The proposed method could be used as a new way to standardize the processing.

Analysis on the Effects of Flood Damage Mitigation according to Installation of Underground Storage Facility (지하저류조 설치에 따른 침수피해 저감효과 분석)

  • Kim, Young Joo;Han, Kun Yeun;Cho, Wan Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.1B
    • /
    • pp.41-51
    • /
    • 2010
  • In this study, runoff simulation was carried out in the area of Bisan 7-dong, Seo-gu, Daegu as drainage basin and the effects of the installation of underground storage facilities were analyzed during heavy rainfall. SWMM model was used for the runoff and pipe network analysis on Typhoon Maemi, 2003. 2-D inundation analysis model based on diffusion wave was employed for inundation analysis and to verify computed inundation areas with observed inundation trace map. The simulation results agree with observed in terms of inundation area and depth. Also, the effects of flood damage mitigation were analyzed through the overflow discharge and 2-D inundation analysis, depending upon whether the underground storage facility is installed or not. When the underground storage facility ($W:120m{\times}L:180m{\times}H:1.7m$) is installed, volume of overflow could be reduced by 72% and flooding area could be reduced by 40.1%. When the underground storage facility ($W:120m{\times}L:180 m{\times}H:2.0m$) is installed, volume of overflow could be reduced by 84.8% and flooding area could be reduced by 50.6%. When the underground storage facility ($W:120m{\times}L:180m{\times}H:2.2m$) is installed, volume of overflow could be reduced by 94% and flooding area could be reduced by 91.2%. There is no overflow of manhole, when the height of storage facility is 2.5 m. It is expected that the study results presented through quantitative analysis on the effects of underground facilities can be used as base data for socially and economically effective installation of underground facilities to prevent flood damage.

Evaluation of Construction Operation and Design Properties of CLSM for Corrugated Pipe in Underground (파형강관을 이용한 지하매설물용 뒤채움재 설계 및 시공성 평가)

  • Lee Kwan-Ho;Park Jae-Heon
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.63-74
    • /
    • 2006
  • During the construction of circular underground pipe, the non-proper compaction along the pipe and the decrease of compaction efficiency have been the main problems to induce the failure of underground pipe or facility. The use of CLSM (controlled low strength materials) should be one of the possible applications to overcome those problems. In this research, the full-scaled field test and the numeric analysis using PENTAGON-3D FEM program were carried out for three different cases on the change of backfill materials, including the common sand, the soil from construction site, and the CLSM. From the full-scaled test in field, the use of in-situ CLSM as backfill materials reduced the vertical and lateral deformation of the pipe, as well as the deformation of the ground surface. The main reason for reducing the deformation would be the characteristics of the CLSM, especially self-leveling and self-hardening properties. The measured earth pressure at the surround of the corrugated pipe using the CLSM backfills was the smaller than the other cases, and the absolute value was almost zero. Judging from the full-scaled field test and FEM analysis, the use of CLSM as backfill materials should be one of the best choices reducing the failure of the underground pipes.

  • PDF

Cause Analysis for Reduced Effect of Sewer Pipe Improvement Project Based On Investigation of Interceptor Sewers (차집관로의 조사 및 분석을 통한 하수관로정비 사업의 효과 감소 원인 분석)

  • Chae, Myungbyung;Bae, Younghye;Kim, Hungsoo
    • Journal of Wetlands Research
    • /
    • v.20 no.3
    • /
    • pp.219-226
    • /
    • 2018
  • Interceptor sewer is installed underground near to the river side mostly ofstate-owned land and the management efficiency of public sewage disposal facilities is decreasing as too much infiltration/inflow(I/I) and river flow to interceptor sewer are caused by broken or deteriorated sewer. This also affects the sewer pipeline project and decreases its efficiency. Therefore, the aim of this study is to investigate interceptor sewer which has influence on the reduction of the project effect. The investigation were performed for three study areas. The study includes the investigation of current condition of interceptor sewer(sewer extension, pipe diameter, pipe type, installed year, installed locations, etc), investigation of inside of sewer by CCTV accompanied by pumping and dredging works where required, investigation of inside of manholes by eyes, calculation of pollutant load using the results of investigation of flow quantity and quality. Multipoint investigations were simultaneously performed for flow quantity at confluence area and other investigations were also performed for flow quantity and BOD for interceptor sewer and comparison of pollutant load, investigation of infiltration/inflow(I/I) caused by deterioration of interceptor sewer. As the result of the study, a main reason for reduced effect of sewer pipe improvement project was analyzed as the low-density sewage and I/I in public seweage treatment Facility due to deteriorated and unmanaged interceptor sewers.

Engineering Characteristics of CLSM Using Bottom Ash and Eco-friendly Soil Binder (친환경 고결제와 저회를 활용한 유동성 복토재의 공학적특성)

  • Park, Giho;Kim, Taeyeon;Lee, Yongsoo;Lee, Bongjik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.5
    • /
    • pp.23-29
    • /
    • 2019
  • In general, pipe laying works are performed by constructing underground facilities such as pipes and then refilling the rest of the area with sand or soil. However, there are many problems in the compaction process such as difficulties in tampering around the underground facility and low compaction efficiency. Such problems cause deformation and damage to the underground pipes during refilling work and ultimately cause road sinks. Construction methods using CLSM are one of the typical methods to solve these issues, and recently, studies on CLSM using coal ash, which has similar engineering properties as sand, have been actively performed to protect environment and recycle resources. While many studies have been conducted to recycle fly ash in many ways, the demand for recycling bottom ash is increasing as most of the bottom ash is not recycled and reclaimed at ash disposal sites. Therefore, in order to find bottom ash applications using eco-friendly soil binders that are environmentally beneficial and conform with CLSM standards, this study investigated flow characteristics and strength change characteristics of eco-friendly soil binders, weathered granite soil, a typical site-generated soil, bottom ash, and fly ash mixed soil and evaluated the soil pollution to present CLSM application methods using bottom ash.

A Study on the Simulation of Underground Acoustic Telemetry (지중 원격 음파통신 시뮬레이션 연구)

  • Shin, Younggy
    • Plant Journal
    • /
    • v.18 no.2
    • /
    • pp.41-45
    • /
    • 2022
  • The conventional communication method using mud flow pressure waves has a speed of 1-2 bps, so it takes a long time to communicate, making real-time control impossible. Although the sound wave communication method for improving the communication speed by 10 times or more has been commercialized, its use is limited due to its high price and there are not many application cases. In this study, the simulator corresponding to the facility was developed to develop performance similar to the actual test results. For simulating sound wave communication through a drill pipe, we proposed a governing equation that can simulate friction damping by mud and developed a numerical analysis model. The attenuation factor was corrected by comparing it with the attenuation rate of sound wave energy at the drilling site. The developed numerical analysis model was applied to the QPSK modulation type communication algorithm to confirm the excellent performance of the communication error rate of 0.04% in the ground. This is the communication performance under the condition that noise has not been mixed yet, and in order to apply it, the technology of reproducing the actual noise signal for mixing by securing the field noise data was established.