• Title/Summary/Keyword: Underground displacement

Search Result 451, Processing Time 0.024 seconds

Numerical Analysis for Dynamic Behavioral Characteristics of Submerged Floating Tunnel according to Shore Connection Designs (지반 접속부 설계에 따른 수중터널의 동적 거동 특성에 대한 수치해석적 연구)

  • Seok-Jun, Kang;Joohyun, Park;Gye-Chun, Cho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.1
    • /
    • pp.27-41
    • /
    • 2023
  • Submerged floating tunnels must be connected to the ground to connect continents. The displacement imbalance at the shore connection between the underground bored tunnel and submerged floating tunnel can cause stress concentration, accompanying a fracture at the shore connection. The elastic joint has been proposed as a method to relive the stress concentration, however, the effect of the elastic joints on the dynamic behavior should be evaluated. In this study, the submerged floating tunnel and shore connection under dynamic load conditions were simulated through numerical analysis using a numerical model verified through a small-scaled physical model test. The resonant frequency was considered as a dynamic behavioral characteristic of the tunnel under the impact load, and it was confirmed that the stiffness of the elastic joint and the resonant frequency exhibit a power function relationship. When the shore connection is designed with a soft joint, the resonant frequency of the tunnel is reduced, which not only increases the risk of resonance in the marine environment where a dynamic load of low frequency is applied, but also greatly increases the maximum velocity of tunnel when resonance occurs.

Numerical Analysis of the Stability of a High-Strength Joint Buried Pile Retaining Wall Method (수치해석을 이용한 고강도 결합 매입말뚝 흙막이 공법의 안정성 검토에 관한 연구)

  • Hyeok Seo;Yeongpan Ha;Junyoung Choi;Kyungho Park;Daehyeon Kim
    • The Journal of Engineering Geology
    • /
    • v.34 no.2
    • /
    • pp.249-262
    • /
    • 2024
  • Retaining walls are widely used in the construction of underground structures. This study reviews the stability of the high-strength joint buried pile method at a site in Korea. [Consider giving details of the location.] The method is assessed by considering the amount of ground settlement, as calculated by finite element analysis and measured at the site. Comparison of the measured and numerical results confirmed the method's stability and field applicability. Settlement of 13.42~13.65 mm was calculated for seven cross-sections [The Abstract should be comprehensible without reference to the main text. The labels A-A' to G-G' should not be introduced here without explanation.] using numerical analysis, and the measured settlement reached a maximum of 2.00 mm. The observed differences and variations [Please state what differed/varied.] did not exceed the design expectations in any section. Instruments installed at the back of the excavation area were used to assess the conditions. An underground gradient meter recorded a cumulative horizontal displacement of between -0.40 and 0.60 mm, and an underground water meter recorded slight displacements of between -0.21 and 0.28 m compared with the initial measurements. A surface settlement meter observed very little movement, with a maximum of -2.00 mm compared with the initial measurement, thereby confirming the establishment of a stable state within the management criteria.

A Case of Design and Field Construction on the Removable Post-tensioned Soil Nailing System (제거식 포스트텐션 쏘일네일의 설계 및 시공사례)

  • Park, Si-Sam;Park, Joo-Suck;Kim, Eung-Soo;Yoon, Myung-June;Park, Ji-Woong;Kim, Hong-Taek
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1081-1086
    • /
    • 2010
  • The general soil nailing support system may result in excessive deformations particularly in an excavation zone of the existing weak subsoils. Pretensioning the soil nails then, could play important roles to reduce deformations mainly in part of the nailed-soil excavation system as well as to improve local stability. Morever, soil nails are installed underneath roads, underground structures, and subway structures, thereby resulting in difficulties in nail remval after completion of temporary soil nailed walls. Hence, to date, in order to solve the technical difficulties and avoid legal issues related to the construction of soil nails underneath the surrounding areas and structures, the removable soil nailing system has been developed and used. But, Therefore, a new soil nailing technique called Removable Post-tensioned Soil Nailing(RPTN) system has been developed in the current study. In this study, an investigation of the RPTN system has been conducted by carrying out field measurement. Hence, the RPTN system can reduce ground displacement and enhance stability of the soil nailed walls.

  • PDF

Behavior of 2-Arch Tunnel with Stiffness of Grouting (그라우팅 강성도에 따른 2-Arch 터널의 거동)

  • Lee, Jong-Min;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.20 no.4
    • /
    • pp.260-266
    • /
    • 2010
  • In this study, wish to analyze effect that affect on each tunnel (right and left tunnel) according as proceeding of leading tunnel (right tunnel), following tunnel (left tunnel) and pilot tunnel excavation through behavior of tunnel and surrounding base by model tests. And stress-transfer mechanism that occurs from in-situ loosing area and arching effect by difference of stiffness ratio and overburden heights were verified experimentally. The model tests were carried out by varying the stiffness of reinforced area and overburden height, measured deformation of tunnel and displacement of surrounding base. The model tests followed exactly the real 2-Arch tunnel construction stages.

Tunnel Safety Diagnosis in Near-excavation by In-depth Inspection of Tunnel (기존터널 안전진단 결과를 통한 근접시공 시 터널 안정성 평가)

  • Kim, Seok-Jae;Kim, Min-Seok;Kim, Jun-Chul;Yoo, Young-Il;Oh, Joung-Bae;Oh, Sae-Joon
    • Tunnel and Underground Space
    • /
    • v.16 no.4 s.63
    • /
    • pp.347-356
    • /
    • 2006
  • We analyzed case studies doing in-depth inspection of tunnel to maintain safety of existing tunnel in constructing new tunnel near to a existing tunnel with single track. Futhermore, We accomplished in-depth inspection of existing tunnel and numerical analysis. We suggested remedies to security safety of existing tunnel. We applied line drilling and pre-large hole boring method not to have an effect on existing tunnel and convinced the safety of existing tunnel from blast-vibration and blast-noise of numerical analysis. We planed to install basset system to measure displacement of existing tunnel according to excavating new tunnel.

Stability analysis of a tunnel excavated in weak rocks and the optimal design for the support pattern (연약지반내 굴착터널의 안정성 평가 및 최적보강설계에 관한 연구)

  • 최성웅;신희순
    • Tunnel and Underground Space
    • /
    • v.7 no.3
    • /
    • pp.191-201
    • /
    • 1997
  • Geological and geotechnical surveys, in general, should precede the excavation to ensure the safety of the tunnel and should be followed up according to the various geological condition during the excavation. However actually the standard support patterns which were decided during the design step used be insisted for the whole excavation steps in spite of the various geological conditions. OO tunnel was excavated with NATM and a support pattern type-V in weak rocks. When the tunnel was excavated up to 25m long, the severe displacement was generated in the portal area and the shotcrete was damaged to make the cracks and the tunnel face was totally collapsed. It might happen owing to the one-day heavy rain, but the exact reason for that accident should be found out and the new optimal support patternt needed. Consequently three dimensional numerical analysis was applied for the evaluation of the cause of the tunnel collapse instead of two dimensional analysis, because three dimensional analysis can show better the real field phenomenon than two dimensional analysis in which the load distribution methods are adopted for the tunnel excavation. We could simulate the actual situations with three dimensional finite difference code and propose the new optimal support patterns.

  • PDF

Mechanical Properties of the Ground Improved by High Pressure Jet-Grouting and Analysis of Deformation of Propped Retaining Walls (고압분사주입공법으로 보강된 개량체의 특성 및 흙막이벽의 변형해석)

  • 심태섭;주승완
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.42 no.6
    • /
    • pp.98-105
    • /
    • 2000
  • Recently, the construction method of high pressure jet-grouting is in wide-use, for the purpose of structure foundation ground, reinforcing of ground behind propped retaining walls and cut-off in order to perform safe construction of underground excavation work. This study was performed a serious of tests of field permeability and unconfined compressive strength upon ground improved established on the ground behind propped retaining walls and examined proper jet mechanism by changing the construction parameter value of high pressure jet-grouting. In addition, we got the conclusion like the followings as a result of inspecting the condition of earth pressure distribution and deformation, using elasto-plastic method and FEM. 1. In that characteristics of strength of ground improved, with the same condition of construction parameter, unconfined compressive strength of sand gravel is shown bigger than that of silty sand by about 1.6 times and cut-off effect is shown to have effect of reducing the permeability of original ground by about 10$^{-2}$ ~10$^{-3}$ cm/s. 2. As a result of analysis of figures of horizontal displacing quantity of propped retaining walls materials regarding before and after High pressure jet- grouting through FEM, the reducing quantity of 0.1~0.3mm in maximum horizontal displacement is shown.

  • PDF

Innovative approach to determine the minimum wall thickness of flexible buried pipes

  • Alzabeebee, Saif;Chapman, David N.;Faramarzi, Asaad
    • Geomechanics and Engineering
    • /
    • v.15 no.2
    • /
    • pp.755-767
    • /
    • 2018
  • This paper uses a finite element based approach to provide a comprehensive understanding to the behaviour and the design performance of buried uPVC pipes with different diameters. It also investigates pipes with good and poor haunch support and proposes minimum safe wall thicknesses for these pipes. The results for pipes with good haunch support showed that the maximum pipe wall stress and deformation increase as the diameter increased. The results for pipes with poor haunch support showed an increase in the dependency of the developed vertical displacement on the haunch support as the diameter or the backfill height increased. Additionally, poor haunch support was found to increase the soil pressure, with the effect increasing as the diameter increased. The design of uPVC pipes for both poor and good haunch support was found to be governed by critical buckling. A key outcome is a new design chart for the minimum wall thickness, which enables the robust and economic design of buried uPVC pipes. Importantly, the methodology adopted in this study can also be applied to the design of flexible pipes manufactured from other materials, buried under different conditions and subjected to different loading arrangements.

Application of Time Domain Reflectometry to the Monitoring or Rock Mass Deformation with Coaxial Cable (동축 케이블을 이용한 시간영역 반사법의 암반변위 계측에의 적용)

  • 정슬람;정소걸;정현기;박철환;박철환;이희근
    • Tunnel and Underground Space
    • /
    • v.6 no.4
    • /
    • pp.306-315
    • /
    • 1996
  • This paper presents an application of the TDR(Time Domain Reflectometry) to the monitoring of the deformation of rock mass with grouted coaxial cables through laboratory tests. The grouted cable can easily deform together with the rock mass movements, and the deformed cable loses its original capacitance and the reflected waveform produced along the deformed cable consequently represents a change of voltage pulse. Therefore, it is possible to monitor the deformation of rock mass by measuring the changes in these reflection signatures. Shear test of the cemented mortar containing a specimen of coaxial cable showed that the shear deformation correlated linearly with the reflection coefficient, so the TDR was effective to monitor the displacement of the rock mass. Bending test were carried out in order to determine the influence of the crooked cables on the monitoring of rock mass movements. Controlled cirmping and shearing test upon a cable of 50 m long, 12.7 mm diameter showed not only the fact that the reflection amplitudes decreased as the cable length increased but also the proper crimping depth, width and interval between two adjacent crimps. Two coaxial cables-one 100 m long and other 175m long-were installed and grouted into the separate boreholes drilled in a sedimentary formation. The behavior of the cable was monitored with metallic TDR cable tester to measure rock mass deformation based on the interpretative techniques developed through laboratory tests.

  • PDF

Study on the Behavior of Toe of Drilled Shaft on the Rock Mass (암반에 근입된 말뚝의 선단 거동 특성에 관한 연구)

  • Park, Woan-Suh;Jeon, Suk-Won;Han, Yong-Hee;Choi, Se-Kun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.842-847
    • /
    • 2008
  • Despite of the increasing number of the application of the drilled shaft pile in construction site, most of the study of pile capacity has been centered side shear resistance. But it is common that the drilled shaft is socketed on the rock so as to use the bearing resistance, so prediction of the toe's movement and characteristic of the bearing capacity is important as the side shear resistance. Therefore the model tests were performed in order to study the characteristic of bearing capacity on rock mass. The material of the test blocks were the mortar which was mixed with sand, cement and water, and test block size was $240{\times}240{\times}240mm$. Load was pressed by the 45mm of diameter of miniaturized pile and plate jack and steal plate were used to the confined stress for representing the underground condition. The relation of load-displacement was measured in many different conditions of rock mass such as direction of discontinuities, spacing and strength, and q-w curves of the toe of the pile were verified in each condition.

  • PDF