Analysis of support loads in large underground space for high-density arrangement of complex plant (복합플랜트 고집적 배치를 위한 지하대공간 지지하중 해석)

  • Kim, Sewon;Park, Jun Kyung;Lee, Sangjun;Kim, YoungSeok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.2
    • /
    • pp.77-92
    • /
    • 2021
  • For the construction of a large underground space with a complex plant installed, it is necessary to analyze the stability considering the ground conditions and various load conditions. In this paper, finite element analysis was performed to analyze the support load that can be used in the design of a large underground space for high-density arrangement of complex plant. An analysis of underground continuous wall (D-wall) was performed considering the load and horizontal earth pressure in the large underground space. In addition, foundation ground analysis was carried out according to the load condition of the complex plant. In order to shorten the construction period, increase the space layout utilization, and secure the stability of the plant structure when installing the complex plant underground, the pipe rack module structure analysis was conducted. This study proposes a design and construction method for the optimal arrangement of underground complex plants using the analysis results.

Stability Analysis of Pipe Rack Module for Underground Complex Plants Construction (복합플랜트 지하 건설을 위한 파이프랙 모듈 공법 안정 해석)

  • Kim, Sewon;Lee, Sangjun;Kim, YoungSeok
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.4
    • /
    • pp.113-124
    • /
    • 2021
  • Underground environmental infrastructure and energy production facilities, which are recognized as avoidable facilities such as landfills, are emerging as an important social issue due to urbanization and economic growth. In order to safely construct a large-scale plant facility in the underground space, it is necessary to increase the utilization of the limited space layout and minimize unnecessary columns. In this study, the plant modularization method(Pipe Rack Module) was reviewed to solve the problems of work constraints, assembly and demolition, process system interconnection, and maintenance that occur when plant facilities are underground. In addition, plant module analysis was performed by applying various load conditions (earthquake load, device load, earth pressure load, etc.) to improve spatial layout usability and secure structure stability. Based on the analysis results under various boundary condition, the implications regarding the minimum installation interval and module arrangement (draft) of basic modules required for the construction of an underground combined plant were derived.

Analysis Study of Diaphragm Wall by Construction Process of Large Underground Space for Complex Plant Installation (복합플랜트 설치를 위한 지하 대공간 건설 공정별 연속벽체 해석 연구)

  • Kim, Sewon;Park, JunKyung;Kim, YoungSeok
    • Journal of the Korean Geosynthetics Society
    • /
    • v.21 no.3
    • /
    • pp.11-19
    • /
    • 2022
  • Underground environmental infrastructure and energy production facilities, which are recognized as avoidable facilities such as landfills, are emerging as an important social issue due to urbanization and economic growth. It is necessary to analyze the stability according to various ground conditions and load conditions for the construction of large-scale underground complex plants. In this paper, horizontal/vertical displacement and stress distribution according to the load condition and construction process were analyzed using finite element analysis (FEM), Based on the analysis results of various conditions, factors to be considered in the detailed design and construction of the underground complex plant were reviewed and the implications on design factors (Intermediate wall installation status, Pre-reinforcing area, etc.) for underground large space construction were derived.

In-situ Measurements of Time-dependent Rock Deformations at the Waste Isolation Pilot Plant in USA (미국 Waste Isolation Pilot Plant에서의 시간변동 거동 계측)

  • Sangki Kwon;Chul-Hyung Kang;Jongwon Choi
    • Tunnel and Underground Space
    • /
    • v.9 no.3
    • /
    • pp.175-184
    • /
    • 1999
  • Systematic measurements in the field are the key component in the design process to ensure that optimal and safe designs result. The instruments installed at the Waste Isolation Pilot Plant, a underground nuclear waste repository in U.S., for measuring rock deformation was reviewed. Also discussions about installation and measurement for better understanding the complex time-dependent deformational behavior of underground excavation were made.

  • PDF

Estimation of greenhouse gas emissions from an underground wastewater treatment plant

  • Kyung, Daeseung;Jung, Da-Yoon;Lim, Seong-Rin
    • Membrane and Water Treatment
    • /
    • v.11 no.3
    • /
    • pp.173-177
    • /
    • 2020
  • Wastewater treatment plants (WWTPs) have been recognized as one of the significant greenhouse gas (GHG) generators, due to the complex biochemical reaction and huge consumption of energy and materials. Recently, WWTPs have been built underground and they will be confronted with the challenges of mitigating GHG emissions and improving the quality of treated wastewater. Here, we focus on estimating GHG emissions to set up effective management plans for a WWTP built underground. First, we apply the process-based life cycle assessment (LCA) with an inventory database of the underground WWTP for a case study. Then, we identify significant factors affecting GHG emissions during service life using sensitivity analysis and suggest the proper tactics that could properly reduce GHG emissions from the WWTP.

Site-Investigation of Underground Complex Plant Construction by Seismic Survey and Electrical Resistivity (탄성파 및 전기비저항을 활용한 지하복합 플랜트 건설 후보지 탐사)

  • Kim, Namsun;Lee, Jong-Sub;Kim, Ki-Seog;Kim, Sang Yeob;Park, Junghee
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.10
    • /
    • pp.49-60
    • /
    • 2022
  • Underground urbanization appears to be a promising solution in response to the shortage of construction sites in the above-ground space. In this context, an accurate evaluation of a construction site ensures the long-term performance of geosystems. This study characterizes potential sites for complex plants built in underground space using geophysical methods (i.e., seismic refraction exploration and electrical resistivity survey) and in situ tests (i.e., standard penetration tests (SPTs) and downhole tests). SPTs are conducted in nine boreholes BH-1-BH-9 to estimate the groundwater level and vertical distribution of geological structures. The seismic refraction method enables us to obtain the elastic wave velocity and thickness of each soil layer for each cross-sectional area. An electrical resistivity survey conducted using the dipole array method provides the electrical resistivity profiles of the cross-sectional area. Data obtained using geophysical techniques are used to assess the classification of the soil layer and bedrock, particularly the fracture zone. This study suggests that geotechnical information using in situ tests and geophysical methods are useful references to design an underground complex plant construction.

A Study on the Application of 22kV class Superconducting Cable in Utility Network (전력회사 계통에 22kV급 초전도 케이블 도입을 위한 적용 개소 고찰)

  • 김종율;윤재영;이승렬
    • Progress in Superconductivity and Cryogenics
    • /
    • v.5 no.2
    • /
    • pp.20-29
    • /
    • 2003
  • As power systems grow more complex and power demands increase, the need of underground transmission system is increasing gradually. But it is very difficult and high in cost to construct new ducts and/or tunnels for power cables in metropolitan areas. HTS (High Temperature Superconducting) cable can carry very high current densities with strongly reduced conductor loss and allow high power transmission at reduced voltage. Therefore HTS cable can transfer more power to be moved in existing ducts, which means very large economical and environmental benefits. A development project for a 22kV class HTS cable is ongoing at a research centers, and the cable manufacturer in Korea. In this paper, we carried out investigation for application of 22kV class HTS cable in Korean utility networks. The results show that the HTS cable is applicable to replace IPB in pumping-up power plant, withdrawal line in distributed generation, withdrawal line in complex power plant, and conventional under ground cable. Finally, as the cost of HTS wire and refrigeration drops, the technical and economical potential of HTS cable is evaluated positively.

Power System Applications for 22kV Class Superconducting Cables in Korea (22kV급 초전도 케이블의 계통도입을 위한 구체적 적용대상 검토)

  • Kim, Jong-Yul;Yoon, Jae-Young;Choi, Heung-Kwan
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.409-411
    • /
    • 2003
  • As power demand increases gradually, the call for underground transmission system increases. But it is very difficult and high in cost to construct new ducts and/or tunnels for power cables in metropolitan areas. HTS (High Temperature Superconducting) cable has the several useful characteristics such as increased power density. Therefore HTS cable can allow more power to be moved in existing ducts, which means very large economical and environmental benefits. In this paper, we carried out investigation for Application of 22kV class HTS cable in Korean utility networks. The results show that the HTS cable is applicable to replace IPB in pumping-up power plant, withdrawal line in distributed generation, withdrawal line in complex power plant, and conventional under ground cable. Finally, as the cost of HTS wire and refrigeration drops, the technical and economical potential of HTS cable is evaluated positively.

  • PDF

Pilot Test of Grid-Type Underground Space Considering Underground Complex Plant Operation (지하 복합플랜트 운영 중 확장을 고려한 격자형 지하공간 파일럿 테스트)

  • Chulho Lee
    • Tunnel and Underground Space
    • /
    • v.33 no.6
    • /
    • pp.472-482
    • /
    • 2023
  • The grid-type or room-and-pillar method is applied for the purpose of mining horizontally buried minerals. In this study, design and pilot test were performed to apply the room-and-pillar method which uses natural rock as a rock pillar to the construction of underground space. The area where the pilot test was conducted was in stone mine and had good rock conditions with an appropriate depth (about 30 m) to apply the pilot test. The pilot test site was selected by reviewing accessibility and ground conditions and then site construction was performed through detailed ground investigation and design. The pilot test was designed with a column shape of 8×8 m and a cross-section of 8×12 m. The blasting pattern was determined through test blasting at the site, and blasting of 3 m excavation with 89 holes was performed. Through field observations, the average width of 12.5 m and the average height of 8.3 m were measured. Therefore, it is possible to proceed similar to the cross-sectional shape considered in the design.

Analysis of Field Condition for Proper Waterproofing Materials applied to Green Roof System for Depot (도시철도 차량기지의 기반녹화에 적합한 방수시스템 선정을 위한 환경 조건 분석)

  • Min, Kwang-Man;Kwon, Shi-Won;Choi, Sung-Min;Kwak, Kyu-Sung;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.127-131
    • /
    • 2006
  • Depot have a lagged behind structure in the side of building up the view. With this reason, people have been recognized depot as hatred facility causes to have car noise, air pollution. In the other hand, depot become a underground and complex facility as a higher-value added building, and moreover, it need to understand the environment that depot structure have a specific field condition to apply green roof system. 1) Analysis proper waterproofing material and root barrier apply to depot need root penetrating test method 2) Suggest root barrier and waterproofing material relate to maintain and construction for green roof system 3) Construction condition for depot have crack movement of structure by vehicle vibration and root penetrating force by plant growth