• Title/Summary/Keyword: Underground Utility Tunnel Work

Search Result 2, Processing Time 0.017 seconds

A Study on Automatic Switch Control System for Systematic Control and History Management of Underground Utility Tunnel Work (지하공동구의 체계적인 통제 및 이력관리를 위한 자동개폐시스템에 대한 연구)

  • Oh, Am-suk
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.6
    • /
    • pp.1443-1448
    • /
    • 2015
  • Most of access control systems for underground utility tunnel work through wired network between central system and the automatic switch control unit. However, there are several issues regarding the absence of network infrastructure and an outdoor reader in a relatively unique environment. To solve these issues we propose an authenticated key based smart phone control system for secure access to the underground utility tunnel and this scheme is anticipated providing us with crucial information about a systemic entrance history and effective management procedures of utility tunnel. In addition, the proposed scheme enables to access to secured control system in smart phone based bluetooth network and it provides information about systemic control and history management for the switch controls through smart phone applications.

The Analysis of Underground Utility Tunnel Positions using Lineament and GPR (선구조와 지하 투과 레이더를 이용한 지하공동구 위치 해석)

  • Jang, Ho-Sik;Seo, Dong-Ju
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.9 no.4
    • /
    • pp.142-150
    • /
    • 2006
  • In this study, GPR and lineament methods are used for the effective construction. GPR method is non-destructive testing to understand underground utility tunnel while lineament method is to understand locational environment. First, soil condition of the subject area is surveyed by location analysis. As the result of GPR survey, small-scale and large-scale of underground utility tunnel's location and scale were estimated. From the result of estimation, it is found that the main cause of underground utility tunnel's generation was not the effect of landslide or disturbed foundation from the excavation work but crack of shear & tension from the effect of fault movement which grew by insulation surroundings. From now on, this investigation method would be very useful in the survey and design stage on site for the effective construction and maintenance.

  • PDF