• Title/Summary/Keyword: Underground Road

Search Result 342, Processing Time 0.03 seconds

Correlation Analysis of the Occurrence of Ground Subsidence According to the Density of Underground Pipelines (지중관로 매설 밀집도에 따른 지반함몰 발생 상관 분석)

  • Kim, Jinyoung;Kang, Jaemo;Choi, Changho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.11
    • /
    • pp.23-29
    • /
    • 2021
  • Recently, ground subsidence has been steadily occurring mainly in downtown areas, threatening the safety of citizens. Under the road, various underground facilities such as water supply pipe, sewage pipe, and communication pipe are buried. Due to the aging of these underground facilities and the reckless development of the underground, it is acting as a cause of ground subsidence. Although there is a result of analyzing the risk of ground subsidence according to the deterioration of the existing pipeline, there is no result of analyzing the risk of ground subsidence using the density of pipelines indicating ground disturbance. Therefore, in this study, the density of the underground space was analyzed using the data of six types of representative underground pipelines in Seoul, and a study was conducted on whether there is a correlation with the ground subsidence. As a result, it was found that the density of underground facilities is high in the area where the ground subsidence occurred, indicating that the density of pipelines have an effect on the ground subsidence.

Characteristics of Ground-Penetrating Radar (GPR) Radargrams with Variable Antenna Orientation

  • Yoon Hyung Lee;Seung-Sep Kim
    • Economic and Environmental Geology
    • /
    • v.57 no.1
    • /
    • pp.17-23
    • /
    • 2024
  • Ground penetrating radar (GPR) survey is a geophysical method that utilizes electromagnetic waves reflecting from a boundary where the electromagnetic property changes. As the frequency of the antenna is about 25 MHz ~ 1 GHz, it is effective to acquire high resolution images of underground pipe, artificial structure, underground cavity, and underground structure. In this study, we analyzed the change of signals reflected from the same underground objects according to the arrangement of transceiver antennas used in ground penetrating radar survey. The antenna used in the experiment was 200 MHz, and the survey was performed in the vertical direction across the sewer and the parallel direction along the sewer to the sewer buried under the road, respectively. A total of five antenna array methods were applied to the survey. The most used arrangement is when the transmitting and receiving antennas are all perpendicular to the survey line (PR-BD). The PR-BD arrangement is effective when the object underground is a horizontal reflector with an angle of less than 30°, such as the sewer under investigation. In this case study, it was confirmed that the transmitter and receiver antennas perpendicular to the survey line (PR-BD) are the most effective way to show the underground structure. In addition, in the case where the transmitting and receiving antennas are orthogonal to each other (XPOL), no specific reflected wave was observed in both experiments measured across or parallel to the sewer. Therefore, in the case of detecting undiscovered objects in the underground, the PR-BD array method in which the transmitting and receiving antennas are aligned in the direction perpendicular to the survey line taken as a reference and the XPOL method in which the transmitting and receiving antennas are orthogonal to each other are all used, it can be effective to apply both of the above arrangements after setting the direction to 45° and 135°.

Analysis of the right to sunshine for elevated structure construction (고가 구조물 건설에 따른 일조권 분석)

  • 강기수;김상석;양승태;강인준
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.485-490
    • /
    • 2004
  • Recently, distribution transfer velocity was extremely lowered by high supply rate of vehicle and low road rate. Therefore expansions of transfer network these were subway, road and railway to recover competitive power as a reform measure of physical distribution traffic were become preference previous subject. For reason of that, an expansion of transfer network is meeting competitive power as selected an elevated road in the ground road network that condition of location calm and get out of the existing urban than the underground road to connect oversensitive a large city and expanded small and medium satellite town. In the meantime, while elevated structures construct, they go through the civilian residential section, agriculture land, etc. The consequence is that it raises a vibration, noise, dust, an infringement of the right to a view and an infringement of the right to a sunshine. In this study, we analyzed Quantitatively sunshine quantity with building 3D simulation model of civil structure. Therefore, we present as planning data to reduce a civilian appeal for dispute of the right to sunshine and an economic and time loss between the government and construction company In addition to that, for the standard of the standard plan of usable sunshine quantity program in the practical business, the building of convenient user interface will be the project to be done.

  • PDF

Development of VR Simulation Algorithm and System for Supporting Optimal Road Design Information (가상 시뮬레이션에 의한 도로설계정보 최적화 방법론 및 지원체계 개발)

  • Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.101-110
    • /
    • 2009
  • The current virtual reality(VR) simulation functions in construction project are focused on the construction phase. This study attempts to extend the application of VR functions to the design phase. This study suggests various VR functions such as earthwork simulation by road alignment, alternative route selection simulation, structure type selection simulation and underground structure visualization simulation. These functions can visualize road route and earthwork condition and select an optimal design route by simulating virtual placement of alternative route. This study configures systematic methodology for suggested VR simulation functions and develops VR system by the functions. Finally this study suggests an improved design process of road construction project by using the developed VR functions

Assessment of Deformation Modulus in Gneiss for Road Tunnel (도로터널에서 편마암 구간의 암반변형계수 산정 연구)

  • Kim, Nag-Young;Kim, Sung-Hwan;Chung, Hyung-Sik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.1
    • /
    • pp.27-35
    • /
    • 2001
  • Four road tunnels, which consists of biotite gneiss and granite gneiss and shows a similar geological conditions, were selected in this study. Laboratory and field tests, the rock mass rating for the four tunnels were conducted. A regression analysis was performed to find out the correlations of test results. It was proposed an equation of reduction factor which can assess the deformation modulus for biotite gneiss and granite gneiss. It was also found that there was a close correlation between Q and RQD in four tunnels according to the analysis between RMR and Q, RMR and RQD, Q and RQD and laboratory and field tests.

  • PDF

Fire Endurance Estimate of Reinforced Concrete Structure Using Nonlinear Finite Element Method (비선형 유한요소해석을 이용한 철근콘크리트 구조물의 내화성능평가)

  • Byun, Sun-Joo;Im, Jung-Soon;Hwang, Jee-Wook
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.1 s.20
    • /
    • pp.17-27
    • /
    • 2006
  • To estimate the retained strength of reinforced concrete structure after fire is very difficult because the complex behavior of structure is hard to understand during course of a fire. However, the damages which is caused by fire of the traffic facility infrastructure are enormous. Therefore the security against fire is important element that must not be overlooked. For this reason, an exact estimate method of the fire endurance is highly demanded. In this study, the validity of the nonlinear finite element method approach for the fire endurance of reinforced concrete structure is verified. The results of fire endurance estimate of underground road way by nonlinear finite element method approach are compared with those by ACI 216R-89.

A Study on Drain System Development for Stability Increase of Cutting Slope (절개사면의 안정성 증가를 위한 배수시스템 개발에 관한 기초적 연구)

  • Lee, Seung-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.6 no.2
    • /
    • pp.15-20
    • /
    • 2005
  • Moutain side ditch is constructed at the top of cutting slopes around road and it drains the surface water that flowed from upper part. About 70% of a country is composed of mountains so occurrence of cutting face by road general observation is necessary. Instability of cutting face is increased by permeation of underground water by rainfall the summer, pore water pressure increases. However, moutain side ditch is constructed on the top of cutting slopes has some troubles. For example, difficulty of qualify control and lack of drainage faculty. Therefore, stability variation of cutting slope is analyzed by hydraulic conductivity and construction depth of mountain side ditch and effective depth of mountain side ditch is decided in this paper.

  • PDF

Seismic performance evaluation of existing road tunnels based on revised seismic design code (개정된 내진설계기준에 기반한 기존 도로 터널의 내진 성능 평가)

  • Gyu-Phil Lee;Du-Hee Park;Ji-Eun Kang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.6
    • /
    • pp.525-540
    • /
    • 2023
  • Because of a new seismic design code has been enacted in 2023, there is a need to evaluate whether the road tunnels in operation satisfies the requirements of the new code. Four tunnels that are considered to be most susceptible to damage. Time history analyses are performed to quantify their seismic performances. The input ground motions generated to fit both 2007 and 2023 codes are used to evaluate the effect of the motions on the calculated responses. The analyses show that all tunnels perform favorably and satisfies the requirements successfully. Therefore, retrofit or reinforcement are deemed as unnecessary.