• Title/Summary/Keyword: Underground Power Line

Search Result 176, Processing Time 0.034 seconds

Pre-qualification Test on 345kv XLPE Cable and Accessories (345kv XLPE절연 케이블의 장기 신뢰성 평가)

  • Kim, Jong-Won;Yu, In-Kee;Kim, Young;Lee, Ki-Soo;Choi, Bong-Nam;Yun, Duck-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2002.07c
    • /
    • pp.1727-1729
    • /
    • 2002
  • To cope with increasing of electric power demand in metropolitan areas, large capacity underground power cables are needed. Under such situations, our company has developed 345kV XLPE insulated cable and accessories. As the final step of development of the 345kV XLPE cable and accessories, the pre-qualification test was carried out on the test line composed of cables, pre-fabricated joints, EB-Gs and EB-As. This paper sums up the pre-qualification test conditions and the results.

  • PDF

A Study on Economical Ways to Design Underground Distribution Line (경제적 지중배전선로 구성에 관한 설계방안연구)

  • Lee, Hu-Young;Wong, Yoon-Chan
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.373-374
    • /
    • 2007
  • 지중배전관로공사 설계시 고려할 사항은 지중배전관로 공수산정, 적정관로 선정, 매설위치 및 매설깊이, 관재의 선정, 관로의 경간, 관로배열 등이 고려되어야 한다. 관로공사비는 굴착깊이와 굴착폭에 의해 산정되고 이는 관로배열, 굴착지반의 토질에 따른 굴착구배, 용수여부, 도로관리기관의 조례, 다짐정도, 작업환경, 작업시간 등에 의해 변화하게 된다. 이런 현장조건 들은 설계자가 바꿀 수 없는 요소이지만 관로배열을 어떤 형태로 하여 매설할지는 설계자가 정하여야 한다. 본 연구에서는 경제적인 관로배열을 선정하기 위해 관로공수별, 관로유형별 공사비를 산출하여 비교 검토하였고 현장에서의 공사시공성, 케이블의 허용전류 등을 종합적으로 고려하여 최적의 관로배열을 제시하였다.

  • PDF

The Study on Countermeasures of Electromagnetic Force by Three Phase Short-Circuit Test of Cable (케이블 삼상단락 실증시험을 통한 전자력 대책방안 검토)

  • Hong, Dong-Suk;Kim, Hae-Jun;Park, Sung-Min;Chang, Woo-Suk;Park, Heong-Suk;Jang, Tae-In;Kang, Ji-Won
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.363_364
    • /
    • 2009
  • Even though underground transmission cable is an essential transmission method to supply stable power for downtown and population center, interaction of electromagnetic force from fault current is very large comparing to overhead transmission line due to restricted installation space such as tunnel, etc. and close consideration is required for it. This paper presents countermeasures to reduce and release the effect of electromagnetic force with rope binding and installation of spacer and describes its efficacy through three phase short-circuit test, which will be utilized as basic materials for improvement and development of cleat, hanger, etc. to reduce and release effect of electromagnetic force in the future.

  • PDF

DEVELOPMENT OF 230kV XLPE CABLE & ACCESSORY (230kV XLPE 케이블 및 부속재 인증시험 완료)

  • Kwon, B.I.;Nam, J.S.;Oh, E.J.;Kim, K.Y.;Choi, B.N.;Yun, D.H.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07e
    • /
    • pp.2268-2270
    • /
    • 1999
  • The underground transmission line have been consistently developed to increase its voltage level for satisfying the customer's demand through supplying the high reliability power. The underground XLPE cable and its accessories of 500kV level have been already developed internationally, but the XLPE cable have been installed 154kV level in Korea up to now. Thus, our company has developed 230kV XLPE cable and its accessory in 1998 for preparing 345kV level system in Korea and being qualified as international cable maker of developing oversea markets. In this paper, newly our developed 230kV system will be introduced using the type test result according to IEC 840 and additional specification.

  • PDF

Evaluation of the Magnetic Field Exposure Level in 60 Hz High Voltage Transmission Lines Nearby Residential Area (60 Hz 고압송전선로 인접 주거지역의 자기장 노출수준 평가)

  • Hong, Seung-Cheol;Jung, Joon-Sig;Kim, Keun-Young;Park, Hyun-Ju;Choi, Sung-Ho
    • Journal of Environmental Health Sciences
    • /
    • v.34 no.1
    • /
    • pp.27-33
    • /
    • 2008
  • In order to evaluate the magnetic field (MF) exposure level in residential areas near high voltage power lines, this research measured MF levels at 120 sites near high voltage transmission lines in the Busan region, Gwangju region, Daegu region and Changwon region from July to December, 2005, and compared and analyzed the efficiencies by measuring and applying the MF emission levels of underground cables and high voltage transmission lines. As a result of the investigation of the MF exposure level by the building usage, the average MF level of 17 locations at schools was $2.44{\pm}2.45mG;$ that of 10 locations at hospitals $6.21{\pm}12.39mG;$that of 76 locations at apartments $2.55{\pm}2.98mG;$ and that at kindergartens and infant houses $3.32{\pm}4.21mG$. MF exposure was analysed as a function of distance from the source and the MF levels directly below a source were $5.15{\pm}8.72mG$, those within 30 m were $3.10{\pm}3.32mG$, while those within 50 m were $2.45{\pm}2.38mG$, and within 100 m were $0.71{\pm}0.93mG$. In order to determine the difference of MF levels by the actual distance from high voltage transmission line within the same building, the evaluation of the floor position and the MF level has shown that the MF levels were highest in the order of roof, 4th floor, 3rd floor, 2nd floor and 1st floor. Comparison of MF emission intensity of underground cables and high voltage transmission lines, has shown that underground cables have an 86-94% of reduction ratio in MF compared to high voltage transmission lines, thus demonstrating higher efficiency.

Development of disc cutter wear sensor prototype and its verification for ensuring construction safety of utility cable tunnels (전력구 터널 건설안전 확보를 위한 디스크커터 마모측정시스템 시작품 개발 및 성능검증)

  • Jung Joo Kim;Hee Hwan Ryu;Seung Woo Song;Seung Chul Do;Ji Yun Lee;Ho Young Jeong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.2
    • /
    • pp.91-111
    • /
    • 2024
  • Most of utility cable tunnels are constructed utilizing shield TBM as part of the underground transmission line project. The TBM chamber is the only space inside the tunnel that encounters rock and soil, and is the place with the highest frequency of accident exposure, such as collapse and collision accidents. Since there is currently no way to measure the disc cutter wear from outside the chamber, frequent inspection by workers is essential. Accordingly, in this study, in order to prevent safety accidents inside the TBM chamber and expect the effect of shortening the construction period by reducing the number of chamber openings, the concept of disk cutter wear measurement technology was established and a prototype was produced. By considering prior technology and determining that magnetic sensors are most suitable for the excavation environment, wear measurement sensor package were developed integrating magnetic sensors, wireless communication modules, power supply, external casing, and monitoring systems. To verify the performance of the prototype in an actual excavation environment, a full-scale tunnelling test was performed using a 3.6 m EPB shield TBM. Based on the full-scale tests, five prototypes were operated normally among eight prototypes. It was analyzed that sensor measurement, wireless communication, and durability performance were secured within a maximum thrust of 3,000 kN and a rotation speed of 1.5 RPM.

Economic Analysis of Power Transmission Lines using Interval Mathematics

  • Teegala, Srinivasa Kishore;Singal, Sunil Kumar
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.4
    • /
    • pp.1471-1479
    • /
    • 2015
  • A major portion of the capital costs in the present day power transmission systems are due to the cost of equipment and construction process. Transmission utilities in the recent years are drawing greater attention towards performing life cycle costing studies for cost management and decision making. However, the data involved in these studies are highly uncertain and the effect of these uncertainties cannot be directly included in the study process, resulting in inaccurate solutions. Interval mathematics provides a method for including these uncertainties throughout the cost analysis and provides final solution range in the form of intervals. In this regard, it is essential and extremely important that significant research has to be carried out in understanding the principles of life cycle costing methodology and its applicability to cost analysis of transmission lines along with uncertainties involved in the cost assessment process. In this paper, economic analysis of power transmission lines using interval mathematics has been studied. Life cycle costing studies are performed using net present value analysis on a range transmission lines used in India and the results are analyzed. A cost break even analysis considering right of way costs was carried out to determine the point of economy indifference.

Selective Harmonic Elimination in Multi-level Inverters with Series-Connected Transformers with Equal Power Ratings

  • Moussa, Mona Fouad;Dessouky, Yasser Gaber
    • Journal of Power Electronics
    • /
    • v.16 no.2
    • /
    • pp.464-472
    • /
    • 2016
  • This study applies the selective harmonic elimination (SHE) technique to design and operate a regulated AC/DC/AC power supply suitable for maritime military applications and underground trains. The input is a single 50/60 Hz AC voltage, and the output is a 400 Hz regulated voltage. The switching angles for a multi-level inverter and transformer turns ratio are determined to operate with special connected transformers with equal power ratings and produce an almost sinusoidal current. As a result of its capability of directly controlling harmonics, the SHE technique is applicable to apparatus with congenital immunity to specific harmonics, such as series-connected transformers, which are specially designed to equally share the total load power. In the present work, a single-phase 50/60 Hz input source is rectified via a semi-controlled bridge rectifier to control DC voltage levels and thereby regulate the output load voltage at a constant level. The DC-rectified voltage then supplies six single-phase quazi-square H-bridge inverters, each of which supplies the primary of a single-phase transformer. The secondaries of the six transformers are connected in series. Through off-line calculation, the switching angles of the six inverters and the turns ratios of the six transformers are designed to ensure equal power distribution for the transformers. The SHE technique is also employed to eliminate the higher-order harmonics of the output voltage. A digital implementation is carried out to determine the switching angles. Theoretical results are demonstrated, and a scaled-down experimental 600 VA prototype is built to verify the validity of the proposed system.

Live Lines Tracing Method in Power Distribution System with 3-phase-4 wires (삼상 다중 접지 배전계통에서 활선로 추적 방법)

  • Zheng, Yan-peng;Byun, Hee-Jung;Shon, Sugoog
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2017.05a
    • /
    • pp.559-562
    • /
    • 2017
  • In city, tracing of power transmission lines is difficult due to compound installation of overhead and underground lines, transposition, bad view caused by trees or big buildings. It is hard problem for electrical technician on site to trace power transformers or power lines to serve customers in 3 phase -4 wires power distribution systems. It is necessary that the correct and fast tracing method is required for load balancing among distribution lines. Old technology use to trace off-lines with high power impulse injection. Our proposed method use to trace live lines with very small power high frequency signal injection. Typical power transformers in the distribution system prevent propagating the higher frequency carrier signal. The proposed method uses the limited propagation ability to identify the power transformer to serve customers. Two end communication terminals are required to be synchronized between them for determination on electrically same phases. Challenging issue is to achieve synchronization without GPS providing synchronizing time. A novel power transformer and wire identification system is designed and implemented. The system consists of a transmitter and a receiver with power-line communication module. Some experiments are conducted to verify the theoretical concepts in a big commercial building. Also some simulations are done to help and understand the concepts by using MATLAB Simulink simulator.

  • PDF

Development of deep learning algorithm for classification of disc cutter wear condition based on real-time measurement data (실시간 측정데이터 기반의 디스크커터 마모상태 판별 딥러닝 알고리즘 개발)

  • Ji Yun Lee;Byung Chul Yeo;Ho Young Jeong;Jung Joo Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.3
    • /
    • pp.281-301
    • /
    • 2024
  • The power cable tunnels which are part of the underground transmission line project, are constructed using the shield TBM method. The disc cutter among the shield TBM components plays an important role in breaking rock mass. Efficient tunnel construction is possible only when appropriate replacement occurs as the wear limit is reached or damage such as uneven wear occurs. A study was conducted to determine the wear conditions of disc cutter using a deep learning algorithm based on real-time measurement data of wear and rotation speed. Based on the results of full-scaled tunnelling tests, it was confirmed that measurement data was obtained differently depending on the wear conditions of disc cutter. Using real-time measurement data, an algorithm was developed to determine disc cutter wear characteristics based on a convolutional neural network model. Distributional patterns of data can be learned through CNN filters, and the performance of the model that can classify uniform wear and uneven wear through these pattern features.