• 제목/요약/키워드: Unattended train operation

검색결과 3건 처리시간 0.045초

IEC 62267 안전요구사항을 적용한 무인경량전철 차량(K-AGT)의 시스템엔지니어링 프로세스에 관한 연구 (A study of unmanned light rail vehicle(K-AGT) system engineering process under Safety Requirement, IEC 62267)

  • 권상돈;이희성
    • 시스템엔지니어링학술지
    • /
    • 제9권1호
    • /
    • pp.1-11
    • /
    • 2013
  • In this study, unattended Light Rail Transit System (K-AGT) is a general-purpose standards safety requirements of IEC 62267 based System Engineering Process (SEP) was used. Functional analysis and physical architecting for each requirements through the vehicle was classified into sub-systems, design was analyzed in terms of SE. The analysis of the proposed system engineering process, unattended train operation (UTO), driverless train operation(DTO) design of the safety measures to be used as the basis is studied.

철도차량의 주행에너지 절약을 위한 열차 주행 패턴 모델링 (Modeling of the driving pattern for energy saving of the railway vehicles)

  • 김정현;김상훈;신한철;이세훈
    • 한국컴퓨터정보학회:학술대회논문집
    • /
    • 한국컴퓨터정보학회 2011년도 제43차 동계학술발표논문집 19권1호
    • /
    • pp.107-108
    • /
    • 2011
  • 철도기술의 발전 이후 현재 도시철도에서는 국내 처음으로 열차의 안전한 운행 제어를 위한 자동/무인 운전이 가능한 자동 열차 운행 장치(ATO)를 도입해 안정적으로 정시 운행을 하고 있다. ATO 자동운전은 제어기준 값(목표속도)과 피드백 값(실제속도)간의 오차에 의한 전동차의 역행과 제동을 반복함으로 에너지 효율 낮다. 본 논문에서는 고정된 역간 거리를 정해진 운전 시분 내에 주행에너지를 최소화하며 주행하는 열차의 특성을 파악하고 모델링한다. 따라서 5호선 실 노선 구간별 운전시분 내에서 실측 데이터 분석을 위해 직선구간/구배구간/곡선구간 등 구간을 선정하고 그 구간에서 열차의 주행패턴에 따라 변화하는 주행에너지를 최소화하는 최적의 주행 패턴을 제시하였다.

  • PDF

무인 경량전철 가용도 산정 및 검증에 관한 연구 (A Study on the Estimation and Verification of the Availability of the Unmanned Light Railway)

  • 권상돈;송보영;이희성
    • 한국안전학회지
    • /
    • 제34권1호
    • /
    • pp.108-114
    • /
    • 2019
  • Unattended Train operation(UTO) requires higher safety target than other systems, since all train operations are automatic. The system provider to deliver without accident or failure, and the operator to transport passengers without accident by putting all trains supplied, including them, into service. Safety rates without such failures can be represented as indicators of RAMS, among which availability is continuously controllable to achieve the target, with a clear target. Availability is often required by the licensee from the initial stage of the project to demonstrate that the request for proposal (RFP) is usually specified and to maintain separate availability targets at the operational stage. In particular, unlike unmanned operation light rail in complex systems, simple formulas are often presented to facilitate verification at each stage. This paper presents this method of usability calculation in an integrated manner at all levels and analyzes the existing usability values to ensure reliability of the availability formula for integrated use in unmanned light rail systems.