• 제목/요약/키워드: UT data single evaluation method

검색결과 2건 처리시간 0.015초

원전 배관감육 평가를 위한 새로운 기법의 도입 및 타당성 (Introduction and Feasibility on a New Technology for the Pipe Wall Thinning Evaluation of Nuclear Power Plants)

  • 황경모;윤훈;박현철
    • Corrosion Science and Technology
    • /
    • 제13권2호
    • /
    • pp.62-69
    • /
    • 2014
  • A huge number of carbon steel piping components installed in the secondary system of nuclear power plants are exposed to aging mechanisms such as FAC (Flow-Accelerated Corrosion), Cavitation, Flashing, and LDIE (Liquid Droplet Impingement Erosion). Those aging mechanisms can lead to thinning of the piping components. To manage the wall thinning degradation, most of utilities in the world predict the wall thinning rate based on the computational program such as CHECWORKS, COMSY, and BRT-CICERO, evaluate the UT (Ultrasonic Test) data, and determine next inspection timing, repair or replacement, if needed. There are several evaluation methods, such as band, blanket, and strip methods, commonly used for determining the wear of piping components from single UT inspection data. It has been identified that those single UT evaluation methods not only do not consider the manufacturing features of pipes, but also may exclude the data of the most thinned point when determining the representative wear rate of piping components. This paper describes a newly developed single UT evaluation method, E-Cross method, for solving above problems and introduces application examples for several pipes and elbows. It was identified that the E-Cross method using the length and width of UT data excluded the most thinned points appropriate as the single UT evaluation method for thinned piping components.

원전 배관의 두께 측정 데이터에 대한 신뢰도 분석 방법 및 적용 (Method and Application for Reliability Analysis of Measurement Data in Nuclear Power Plant)

  • 윤훈;황경모;이효승;문승재
    • Corrosion Science and Technology
    • /
    • 제14권1호
    • /
    • pp.33-39
    • /
    • 2015
  • Pipe wall-thinning by flow-accelerated corrosion and various types of erosion is significant damage in secondary system piping of nuclear power plants(NPPs). All NPPs in Korea have management programs to ensure pipe integrity from degradation mechanisms. Ultrasonic test(UT) is widely used for pipe wall thickness measurement. Numerous UT measurements have been performed during scheduled outages. Wall-thinning rates are determined conservatively according to several evaluation methods developed by Electric Power Research Institute(EPRI). The issue of reliability caused by measurement error should be considered in the process of evaluation. The reliability analysis method was developed for single and multiple measurement data in the previous researches. This paper describes the application results of reliability analysis method to real measurement data during scheduled outage and proved its benefits.