• Title/Summary/Keyword: US Construction Market

Search Result 40, Processing Time 0.028 seconds

A Pilot Study on the Present State and Transformation of Construction Management Actors of USFK's EC Projects (주한 미군 EC 프로젝트의 현황과 시공관리 주체의 변화에 대한 기초연구)

  • Kim, Duk-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.65-75
    • /
    • 2006
  • Emerging trends regarding USFK(United States Forces, Korea)'s EC(Engineering/Construction) market include: (1) introduction of MATOC(Multiple Award Task Order Contract); (2) increase of DB(Design-Build) contract; and (3) encroachment of large US-origin private EC firms upon Korea. This study analyzes the change of USFK's EC market with focus on the change of construction management actors for USFK's EC projects. Specifically, USFK's EC projects have been managed by FED(Far East District). Recently, however, the large US private EC companies substitute the role previously taken by FED. This phenomenon is accelerated by the business chances in Korea due to LPP(Land Partnership Plan) and intentions of US Government to save military construction costs by means of utilizing US private EC companies. The large US EC firms entering into Korea are business opportunities as well as challenges to Korean EC firms, which are contracting USFK's EC projects. This study concludes that, through teaming joint venture with the large US EC firms, the market changes can be opportunities to acquire foreign market information and learn advanced construction management skill from them.

The Trend of CM at Risk in the U.S Construction Market (미국 CM at Risk 시장 동향 및 시사점)

  • Chang, Chul-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.67-73
    • /
    • 2006
  • Alternative project delivery methods including design-build and CM at Risk have evolved as a means of meeting owner's diverse needs and implementing project efficiently with limited budget and time in more competitive construction environment. It is time to consider adopting alternative project delivery methods, especially CM at Risk, for domestic construction industry to enhance competitiveness and to provide various options for owners so that they can select more appropriate project delivery methods for the facility being planned. This research report derives suggestions from investigating how CM at Risk has been evolved in the US construction market. Besides the analysis of CM at Risk market in the US construction industry, the characteristics of companies whose market share are in Top 100, the type of facility usually built by this method were investigated. Based on the analysis of CM at Risk in the US, the prepositions in adopting CM at Risk to domestic construction industry and the possibility of adopting this method have been identified.

  • PDF

Information System for Managing Cost Reimbursable Construction Projects (실비정산 비용지불 방식에 적용 가능한 건설 프로젝트 정보관리 시스템)

  • Kang, Namhee;Song, Hojeong;Kim, Hyunjung;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.2
    • /
    • pp.237-247
    • /
    • 2015
  • The project management information system (PMIS) has recently been developed by using the information technology(IT) in order to implement advanced information management technology to construction industry in Korea. The PMIS has been applied not only to domestic construction projects, but also to some overseas projects executed by Korean construction companies. This study was performed to develop the PMIS that is tailored to the US construction IT market. It has been monopolized by the US-based IT companies, but other companies are recently emerging with competitive technology and market strategy. As a preceding study, existing commercially available systems were analyzed, and the required features of the PMIS were identified by analyzing the core elements of contract, process and cost management about construction projects in the US. Then, the PMIS was developed based on the aforementioned analysis results. The system includes the document management module with an internal electronic approval system, the cost-plus-based automatic labor cost calculation module, and the progress management module to support the integrated project cost management. In addition, the functionality of the developed system was verified by experts about construction management in the US via questionnaire survey. The developed PMIS, in this study, is expected to be applied not only to the US construction IT market as a system specialized for the US construction industry, but also to other oversea markets in the future.

Research on the Strategies of Korean construction companies in advancing into the US infrastructure market : Focused on PPP projects

  • Kim, Hwarang;Kim, Doyeob;Jang, Hyounseung
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.235-241
    • /
    • 2017
  • SWOT-AHP method was utilized in the research for the Korean construction companies to advance into the US PPP market. The research was that the SO Strategy ": Advancing through strategic selection of both construction sector type and region", ST Strategy "Advancing based on the acquired competitive business sector", WO Strategy "Developing collaboration model between public financial organization and construction company", and WT Strategy "Establihing a partnership or M&A with local companies".

  • PDF

Analysis of Concentrate Competency for Cambodian Building Construction Projects (캄보디아 건축 사업 진출을 위한 우선적 확보역량분석)

  • Jang, Hyoun-Seung;Son, Bo-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.45-55
    • /
    • 2013
  • Recently, with achieved US$ 500 Billion international cumulative construction order, the Korean government presented overseas construction industry visions for international orders of US$ 100 B and entering the top five countries in global construction market. Also, Korean companies are developing strategies for expansion of international markets especially focused on company competitiveness as a target market. Therefore, this study aims to analysis of competitiveness for the Cambodian building construction market, which presents abundant development potential. The results of IPA result were as follows; construction order information and supply chain management are needed for public tender projects and F/S, global project financing, and supplier relationship management are needed for construction investment projects. However, this work is still considered to provide the basic data that can help Korean construction companies who plan to enter the Cambodian building construction market strengthen their medium and long-term capabilities.

System Dynamics Modeling of Korean Lease Contract Chonsei

  • Myung-Gi Moon;Moonseo Park;Hyun-Soo Lee;Sungjoo Hwang
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.151-157
    • /
    • 2013
  • Since the sub-prime mortgage crisis from the US in 2008, the Korean housing market has plummeted. However, the deposit prices of the Korean local lease contract, Chonsei, had been increasing. This increase of Chonsei prices can be a threat to low-income people, most of whom prefer to live in houses with a Chonsei contract. In the housing and Chonsei market, there are many stakeholders with their own interest, hence, simple thoughts about housing and Chonsei market, such as more house supply, will decrease house price, would not work in a real complex housing market. In this research, we suggests system dynamics conceptual model which consists of causal-loop-diagrams for the Chonsei market as well as the housing market. In conclusion, the Chonsei price has its own homeostasis characteristics and different price behavior with housing price in the short and long term period. We found that unless government does not have a structural causation mind in implementing policies in the real estate market, the government may not attain their intended effectiveness on both markets.

  • PDF

Establishing the Education Strategy in strengthening Construction Management's ability in Large-scaled Construction Company (대형시공사의 사업관리 역량 강화를 위한 교육 전략 수립에 관한 연구)

  • Kim, Sang-Chul;Park, Chan-Jeong;Lee, Sang-Youb;Son, Jae-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.109-118
    • /
    • 2007
  • It is related to launch the CM market and to increase the profit and entire ability in company that is enforcing the ability of construction management in large-scaled construction company. According to the CM market in U.S, CM market is increased with competing to the companies, that is E&C, general contractor, design firm, specialized CM firm. Also domestic market is similar to US market. In this situation, large-scaled construction companies are filled with construction management ability for competing with foreign companies and domestic CM firms. This paper suggests how to enforce the construction management ability through education, and shows the detailed education strategy considered the fields, divisions and positions.

Analysis of Competency Assessment Using BSA for ODA Loan Construction Projects (BSA기법을 활용한 ODA건설사업 역량 요인 도출 및 분석)

  • Kim, Hwa-Rang;Jang, Hyoun-Seung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.45-53
    • /
    • 2012
  • Recently, with achieved US$ 500 Billion international cumulative construction order, the Korean government presented overseas construction industry visions for international orders of US$ 100 Billion and entering the top five countries in global construction market. Also, Korean companies are developing strategies for expansion of international markets. However, ODA loan projects are low risk for the Korea Construction companies trying to advance their overseas business. This study provides data-based advice on securing competence for Korean construction companies entering the global market through the ODA loan projects. To analysis construction firm's competitiveness for ODA loan project, FGD was utilized and BSA model was applied to the valuable analysis. Competencies highly assessed were construction quality control, relationship building through high-level diplomatic activities, and project management. Competencies requiring urgent improvement were handling risks of local countries, financing projects, and developing know-how within participating companies.

A Study on the Effect and Improvement Direction of the Credit Rating of Large Construction Firms by the Reinforced Real Estate Regulations and the Raising of the Base Rate (정부 부동산규제 강화와 기준금리 인상이 대형건설사 신용등급에 미치는 영향과 개선방향에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.90-102
    • /
    • 2018
  • In preparation of the increase in the domestic debts and the rise in the US interest rate, the Korean government has started to strengthen the regulation on the property market since 2017. So, it is likely that the sales in the domestic construction market would be decreased. Even in the overseas plant projects market, as there has been the continuous increase in the cost and the resulting increase in the losses, it looks hard for the large construction companies to keep their credit ratings as they are now. This study is designed to check Korean government's property policy and any possible problems caused by the overseas and domestic economic environment, which include the property market policy, interest rate, rise in the property price and lackluster sales in housing market. It showed the change in the credit ratings by finding out the sales, work capability, sales in non-governmental projects, operating profits and PF contingency liabilities. For this study, the questionnaires were sent to 30 practical experts to analyze the effect of the risk factor on the outside credit rating of large construction companies.

Dynamic Spillover for the Economic Risk in Korea on Global Uncertainty

  • Jeon, Ji-Hong
    • Journal of Distribution Science
    • /
    • v.17 no.1
    • /
    • pp.11-19
    • /
    • 2019
  • Purpose - We document the impact of economic policy uncertainty (EPU) in the US and China on the dynamic spillover effect of macroeconomics such as stock price, housing price in Korea. Research design, data, and methodology - We use the nine variables to analyze the effect which produces a result among the EPU indexes of the US and China on economic variables which is the consumer price index (CPI), housing purchase price composite index, housing lease price, the stock price index in banking industry, construction industry and distribution industry, and composite leading indicator from January 1995 to December 2016 with the Vector Error Correction Model. Result - The US EPU index has significantly a negative relation on the CPI, housing purchase price index, housing lease price index, the stock price index in banking industry, construction industry, and distribution industry in Korea. Conclusions - We find the dynamic effect of the EPU indexes in the US and China on the macroeconomics returns in Korea. This study has an empirical evidence that the economy market in Korea is influenced by the EPU index of the US rather than it of China. The higher EPU, the more risky the economy of in Korea.