• 제목/요약/키워드: Twin tunnels

검색결과 47건 처리시간 0.023초

지하철 공기청정을 위한 2유체노즐형 자동세정 공기청정 시스템 개발에 관한 연구 (Performance Evaluation of Automatic Self-Cleaning Filter System using Twin-Fluid Nozzles for Air Cleaning in the Subway Stations)

  • 안영철;이재근
    • 한국분무공학회지
    • /
    • 제9권3호
    • /
    • pp.15-21
    • /
    • 2004
  • The removal of the dusts in the subway stations, tunnels, factories and buildings becomes issue for comfortable indoor and outdoor conditions. There has been used an automatic self-cleaning filter system to collect the dusts. In general, the collected particles are removed by water spray nozzles. The new design for improving the cleaning efficiency of collected dusts and reducing the supplied water is the concept of the plane array of demister filters and the twin-fluid nozzle for mixing compressed air and water in the automatic self-cleaning filter system. Results show that the cleaning efficiency of twin-nozzle filter systems is 99.1%, compared to 47% in the conventional filter system. Therefore the automatic self-cleaning filter system using twin-fluid nozzle filter systems reduces water supplied in the filter system, and increases cleaning efficiency and drying efficiency.

  • PDF

퇴적암 지역에서의 교각 기초 하중을 받는 기존터널의 안정성에 대한 해석적 고찰 (Stability Analysis of Existing Tunnel in Stratified Sedimentary Rocks Subjected to Bridge Pier Load)

  • 김교원
    • 지질공학
    • /
    • 제8권2호
    • /
    • pp.153-161
    • /
    • 1998
  • 경상계 퇴적암은 층리가 잘 발달하고 있어 강도 및 변위 특성은 이방성을 띄기 때문에 터널 등 지반 특성과 밀접하게 관계되는 건설공사 시에 지반의 이방성 특성을 고려한 설계가 필요하다. 경상계 퇴적암을 기반암으로 하여 건설 중인 대구 지하철 2호선은 운영 중에 지하철 노선 상부에 건설되는 것으로 계획된 동서고가도로의 하중을 추가로 받게 된다. 교각 기초에 작용하는 76.2 MN의 고가도로 하중이 하부의 지하철 터널에 미치는 영향을 수치해석으로 검토하였다. 검토결과 지하철 터널 주변 지반은 추가 하중으로 인하여 5∼6 MPa의 응력을 받게되며 콘크리트 라이닝은 8∼10mm의 추가 변위를 받게되어 라이닝의 손상 가능성이 큰 것으로 나타났다. 따라서, 지하철 운영시의 안전을 위하여 고가도로 교각 기초 부근의 터널은 지하철 공사 시에 적절히 보강되어야 할 것으로 판단된다.

  • PDF

다양한 현장조건을 고려한 병설터널 필라의 안정성평가 (Stability Estimation of the Pillar between Twin Tunnels Considering Various Site Conditions)

  • 김주환;김종우
    • 터널과지하공간
    • /
    • 제27권2호
    • /
    • pp.109-119
    • /
    • 2017
  • 다양한 현장조건을 고려하기 위하여 필라 폭, 암반등급, 측압계수를 달리한 각종 병설터널을 모델링하고, 수치해석과 모형실험을 통해 필라의 안정성을 알아보았다. 수치해석을 통해 얻어진 필라 중앙부의 응력, 필라 전체의 평균응력, 필라 좌우단부의 응력을 각각 적용하여 필라의 강도/응력비를 구하였다. 이중 필라 좌우단부의 응력을 적용하였을 때의 강도/응력비는 가장 보수적인 값을 나타내었고, 분할굴착과 지보체계를 고려한 시공단계해석에서도 굴착 시점과 부합한 실제적인 값을 보였다. 또한, 병설터널의 모형실험에서 필라의 파괴균열은 필라 좌우단부로부터 필라 중앙부를 향해 점진적으로 발생하였다. 따라서 필라의 국부적 손상을 방지하고 터널 안정성을 보수적으로 평가하기 위해서는 필라 좌우단부의 응력을 적용하여 필라의 강도/응력비를 구하는 방법이 적합한 것으로 판단된다.

CONSTRUCTION OF SUBWAY TONNEL BENEATH EXISTING VEHICLE UNDERPASS

  • Kim, In-Kuin
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1990년도 PROCEEDINGS OF THE FIRST KOREA-JAPAN JOINT GEOTECHNICAL SEMINAR ON EXCAVATION and TUNNELING IN URBAN AREAS
    • /
    • pp.25-34
    • /
    • 1990
  • For the construction of twin single track subway tunnels by NATM within close proximity of existing vehicle underpass in the highly congested area of downtown Seoul, finite element analyses were performed to evaluate the ground responses during tunnelling and also the stability and safety of the underpass structure and subway tunnels. Results of the analyses indicated the need to improve the soil beneath the underpass, and pre-grouting was carried out prior to the tunnel excavation. During tunnel construction field measurement program was implemented to confirm the results of anslyses and to control the tunnel construction procedures, thus ensuring stability of the existing structres.

  • PDF

쌍굴터널 굴진에 따른 주변지반의 거동과 간섭효과 (Effect of interference and Ground Movement by Twin Tunnelling)

  • 김학문
    • 터널과지하공간
    • /
    • 제7권2호
    • /
    • pp.136-142
    • /
    • 1997
  • The behaviour of ground movement during the construction of two parallel tunnels in weathered zone and soft rock has been investigated. All the influencing factors for the behaviour of twin tunnel such as tunnel size, ground conditions, tunnel depth, pillar width and initial state of ground stresses were examined The results of FEM nonlinear analysis were compared with some of model test results in weathered zone to verify the numerical method. It was found that minimum interference was obtained in the parallel construction case when the twin tunnel distance (pillar width) is just over the twice of tunnel diameter. Guide line for the interference of twin tunnelling has been introduced for the ground of weathered zone and soft rock.

  • PDF

초근접 병설터널의 필라 안정성 확보 (Pillar stability in very near-twin tunnels)

  • 김동규;고성일;이정용;이철희
    • 한국터널지하공간학회 논문집
    • /
    • 제24권6호
    • /
    • pp.699-714
    • /
    • 2022
  • 본 연구의 목적은 2개 터널의 간격이 최소 1 m이내인 초근접 병설터널이 풍화토 또는 풍화암같은 연약대를 통과하는 경우에 대해 안전하며 경제적인 필라보강방법을 제시하는데 있다. 초근접 병설터널의 필라부 보강방법 제시를 위하여 2차로 도로터널 표준단면도를 적용하였다. 필라부의 두께는 1 m로 가정하였다. 터널 통과 주변 지반 조건으로 풍화토 또는 풍화암으로 가정하였다. 필라부 안정성 평가를 위하여 4가지 보강 방법, 록볼트 보강, pre-stress 강연선 보강, 필라부 상부 수평강관 보강 + 그라우팅 보강, 수평 강관 보강 + 그라우팅 + pre-stress 강연선 보강 조건에 대하여 검토하였다. 터널 주변 지반조건이 풍화토인 경우 수평강관 보강 + 그라우팅 + pre-stress 강연선 보강 조건만 필라부에서 파괴가 발생하지 않았다. 터널 주변 지반조건이 풍화암인 경우 수평강관 보강 + 그라우팅 조건과 수평강관 보강 + 그라우팅 + pre-stress 강연선 보강 조건인 경우에서만 필라부에서 파괴가 발생하지 않았다. 수평강관 보강 + 그라우팅은 필라부 상부에 가해지는 상부하중을 지지하여 필라부 상부의 안정성을 증가시키는 역할을 수행한 것으로 판단된다.

병설터널 굴착시 필라부의 보강을 고려한 안정성 평가기법 (Stability Estimation Method for Pillar Considering the Reinforcement Method during Twin-Tunnel Excavation)

  • 장부식;황정순;류준원;이응기;김홍택
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.980-987
    • /
    • 2006
  • Recently, twin-tunnel is often designed considering the aspects of disaster prevention and economic reasons. However, the design cases and the studies are relatively insufficient. By the twin-tunnel excavation, deviate stresses of pillar between tunnels are increased and the increased stresses induce the instability of the twin-tunnel. In this study, numerical analyses about the twin-tunnel behaviour are conducted while varying ground strength, width of pillar and depth of earth cover and a series of regression analyses are carried out by using the results of numerical analyses for the twin-tunnel. Based on the numerical analyses, an estimation method of derived stresses is suggested though the regression analyses. Also, based on the results of regression analyses, an quantitative estimation method considering the reinforcement effects is also suggested. Then various parametric studies are conducted to be considered the reinforcement type and various design parameters. Finally, the efficiency of the suggested method is verified through the results of parametric studies.

  • PDF

축소모형실험을 통한 근접터널의 거동에 관한 연구 (A Study on the Behavior of a Closely-Spaced Tunnel by Using Scaled Model Tests)

  • 안현호;최정인;이석원;심성현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.189-198
    • /
    • 2008
  • Lots of roadway tunnel have been almost constructed in forms of closely-spaced tunnel in korea. If closely-spaced tunnel is not constructed at a sufficient distance between tunnels, the problem of stability can occur. However, the case that can not secure a sufficient distance between tunnels can occur due to a difficulty in buying a lot and an issue of popular complaint and environmental disruption. Generally, tunnels are not influenced by each other when a center distance between tunnels is two times longer than tunnel diameter under the complete elastic ground and five times under the soft ground. In this study, the scaled model tests of closely-spaced tunnel by using homogeneous material were performed and induced displacements were measured around the tunnel openings during excavation. The influence of distance between tunnels on the behavior of closely-spaced tunnel was investigated.

  • PDF

Numerical modeling of two parallel tunnels interaction using three-dimensional Finite Elements Method

  • Nawel, Bousbia;Salah, Messast
    • Geomechanics and Engineering
    • /
    • 제9권6호
    • /
    • pp.775-791
    • /
    • 2015
  • Due to the extension of communication ways (metro, highways, railways), hence, to improve traffic flow imposes often the difficult crossing that generally drive to the construction of underground works (tunnel, water conveyance tunnel...) plays a major role in the redevelopment of urban areas. This study is focused on the assessment of the interaction response of parallel tunnels, so this study uses the results from the simulation of two tunnels to illustrate a few observations that may aid in practical designs. In this article, simultaneous drilling of highway's twin tunnels is simulated by means of Finite Element Method (FEM) implemented in Plaxis program. So the treated subject appears in a setting of geotechnical where one can be to construct several tunnels sometimes in a ground of weak mechanical characteristics. The objective of this study is to simulate numerically the interaction effects caused by construction of two parallels tunnels. This is an important factor in the study of the total answer of the problem interaction between parallels underground works. The importance of the effects transmitted is function of several parameters as the type of the works, and the mechanical characteristics (tunnel size, depth, and the relative position between two tunnels, lining thickness...). This article describes numerical analyses of two parallels tunnels interaction. This study will be applied to a real case of a section tunnel T4 of the highway East-West (Algeria); the study presented below comprises a series of numerical simulations of two tunnels using the computer program Plaxis which is used in the analyses is based on Finite Element Method.

공항하부 토사 병설 쉴드터널에서 대구경 강관추진에 의한 횡갱 설계/시공사례 연구 (Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport)

  • 안창윤;박두희
    • 한국터널지하공간학회 논문집
    • /
    • 제23권5호
    • /
    • pp.325-337
    • /
    • 2021
  • 도로와 철도터널에서는 비상시 대피를 위한 시설이 필수적이며, 제연 및 화재 진압을 위한 설비와 승객의 피난 통로가 그것이다. 장대 병설터널에서는 횡갱을 배치하여 화재 발생 반대편 터널로 대피하도록 계획된다. 병설 쉴드터널에서는 횡갱의 시공을 위해 기 시공된 본선터널의 영구 구조물인 세그먼트 라이닝을 철거하여 원지반을 노출하여야 한다. 현대의 대부분의 쉴드TBM이 막장을 격벽으로 차단한 폐쇄형 쉴드TBM임을 감안할 때, 원지반이 노출되는 횡갱의 시공은 쉴드터널의 시공단계에서 위험도가 높은 과정 중 하나이다. 특히, 지하수위 아래의 토사 쉴드터널의 횡갱 시공에서는 세그먼트 철거 및 굴착 중 토사지반의 안정성 확보를 위한 차수 및 굴착공법에 대한 면밀한 검토가 요구된다. 본 사례 연구에서는 토사지반에서 대구경 강관추진을 활용한 횡갱 굴착 공법의 시공 중 유의사항을 소개하고 시공 후 계측결과를 분석하였다. 본 사례 연구에서 소개되는 횡갱 굴착공법은 그라우팅으로 보강된 토사지반에 대구경 강관 추진 후 내부 굴착하는 공법으로써, 두 가지 메커니즘에 의해 토사지반에서 굴착 중 막장의 안정성을 확보한다. 첫 번째는 대구경 강관을 추진하여 막장 전방 토사지반의 전주면을 강관에 의해 선 지보 한다. 두 번째는 대구경 강관 추진으로 내부로 압입된 토사의 Plugging 효과에 의해 막장 전면의 지지효과를 얻을 수 있다. 추진력에 의한 강관의 변형 및 강관의 관통 완료 후 응력발생 계측결과로부터 대구경 강관 추진에 의한 횡갱 굴착공법이 토사지반에서 충분한 시공성과 안정성을 확보함을 확인하였다. 본 사례 연구의 토사 쉴드터널의 횡갱 시공공법은 유사한 현장조건에서 널리 활용될 수 있을 것으로 판단된다.