• Title/Summary/Keyword: Tunnelling Current

Search Result 71, Processing Time 0.024 seconds

A Study on the Compressive Strength & Pore Structure of Shotcrete using for Mine Ready-mixed Materials (광산용 레디믹스트 재료를 사용한 숏크리트의 압축강도 및 공극구조에 대한 고찰)

  • Lee, Heung-Soo;Kim, Dong-Min;Choi, Seung-Kyung;Lee, Ju-Hoe
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1517-1521
    • /
    • 2009
  • A variation of pore structure of shotcrete matrix was experimented by Mercury Intrusion Porosimetry, and the relation with compressive strength was also examined. As a result of the Mercury Intrusion Porosimetry(MIP) test, RM-P1 Batch the macropore diameter of the RM-BFS2 and RM-BFS3 Batch than to have a relatively macropore can see a lot of long-term durability performance degradation. Also, K and N Batch the current is applied to the mine if the factors on shotcrete durability performance of the macropore volume of the entire appears to be a long-term durability performance in the fall.

  • PDF

A study on the behaviour of pre-existing single piles to adjacent shield TBM tunnelling from three-dimensional finite element analyses (3차원 유한요소해석을 통한 shield TBM 터널 근접시공에 의한 인접 단독말뚝의 거동에 대한 연구)

  • Jeon, Young-Jin;Jeon, Seung-Chan;Jeon, Sang-Joon;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.23-46
    • /
    • 2020
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of pre-existing single piles to adjacent tunnelling by considering the tunnel face pressures and the relative location of pile tips with respect to the tunnel. The numerical modelling has analysed the effect of the face pressures on the pile behaviour. The analyses concentrate on the ground settlements, the pile head settlements, the axial pile forces and the shear stress transfer mechanism at the pile-soil interface. The head settlements of the pile (the vertical distance between the pile and the tunnel: 0.25D, where D is the tunnel diameter) directly above the tunnel crown with the face pressure 50% of the in-situ horizontal soil stress at the tunnel springline decreased by about 38% compared to corresponding settlements with a face pressure 25% of the in-situ horizontal soil stress at the tunnel springline. Furthermore, it was found that the smaller the face pressure, the larger the tunnelling-induced ground movements and the axial pile forces were and the higher the degree of the shear strength mobilisation at the pile-soil interface. When the piles were outside the tunnel influence zone, compressive pile forces were developed due to tunnelling. It has been found that the ground settlements and the pile settlements are heavily affected by the face pressures and the position of the pile tip relative to the tunnel. In addition, the computed results have been compared with relevant studies previously reported in literature. The behaviour of the piles has been extensively examined and analysed by considering the key features in great detail.

A study on platform-based preliminary design guidelines associated with the behaviour of piles to adjacent tunnelling (터널근접시공에 의한 말뚝의 거동을 고려한 플랫폼 기반의 예비 설계 가이드라인에 대한 연구)

  • Jeon, Young-Jin;Lee, Gyu-Seol;Lee, Jae-Cheol;Batbuyan, Chinzorig;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.2
    • /
    • pp.129-151
    • /
    • 2022
  • In the current work, a series of three-dimensional finite element analyses have been carried out to understand the behaviour of piles when the adjacent tunnelling passes underneath grouped piles with a reinforced pile cap. In the current study, the numerical analysis studied the computed results regarding the ground reinforcement condition between the tunnel and pile foundation. In addition, several key issues, such as the pile settlements, the axial pile forces, the shear stresses and the relative displacements have been thoroughly analysed, and the IoT platform based preliminary design guidelines were also presented. The pile head settlements of the nearest pile from the tunnel without the ground reinforcement increased by about 70% compared to the farthest pile from the tunnel with the maximum level of reinforcement. The quality management factor data of the piles were provided as API (Application Programming Interface) of various forms by the collection and refinement. Hence it has been shown that it would be important to provide the appropriate API by defining the each of data flow process when the data were created. The behaviour of the grouped piles with the pile cap, depending on the amount of ground reinforcement, has been extensively analysed, and the IoT platform regarding the quality management of piles has been suggested.

A study on Stress Corrosion Cracking of Sensor Wire in Thermally Insulated Underground Pipeline (이중보온관 부식감지선의 응력부식파괴에 관한 연구)

  • Choe, Yun-Je;Kim, Jeong-Gu
    • Korean Journal of Materials Research
    • /
    • v.12 no.2
    • /
    • pp.103-111
    • /
    • 2002
  • The thermally insulated underground pipelines have been used for district heating system. The sensor wire embedded in the insulation was used for monitoring the insulating resistance between the sensor wire and the pipe. The resistance measurement system detects corrosion of steel pipe under insulation. The corrosion and stress corrosion cracking(SCC) characteristics of sensor wire in synthetic ground water were investigated using the electrochemical methods and constant load SCC tests. The polarization tests were used to study the electrochemical behavior of sensor wire. The sensor wire was passivated at temperatures ranging from 25 to $95^{\circ}C$. However, the applied sensing current larger than passive current resulted in breakdown of passive film. The constant load SCC tests were performed to investigate the effects of applied current and load on the fracture behavior. Stress-corrosion cracks initiated at pits that were produced by sensing current. The growth of the pit involves a tunnelling mechanism, which leads to ductile fracture.

Snow Tunnelling Project at the South Pole (남극 극지점 기지에서의 얼음 터널 프로젝트)

  • 지왕률
    • Tunnel and Underground Space
    • /
    • v.13 no.1
    • /
    • pp.1-5
    • /
    • 2003
  • The United States Antarctic program (USAP) through its principal Support Contractor Raytheon polar Services Co. (RPSC), has recently finished a 3 years projects, almost 936m length of underground utility tunnels at Amundsen-Scott station. It accommodates the piping that conveys fresh water from current well sites, as well as waste water to repositories in abandoned wells. The under snow tunnels allow year-round access for system operations and maintenance.

Design and Construction Problems of NATN Tunnel Emerged from Seoul Subway Construction (서울 지하철 건설에서 조명된 NATM 터널의 설계 및 시공상의 문제점)

  • 정명근;박광준
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.15-20
    • /
    • 1993
  • NATM becomes one of the major methods of tunnel construction, such as that of subways and highways. However, a number of design and construction problems have been noticed and reported from the recent large-scale tunnelling projects. Some of them are presented and discussed in this report in order to call an attention to these problems and provide a sound basis for the improvement of current problems.

  • PDF

Stability assessment of tunnel face in a layered soil using upper bound theorem of limit analysis

  • Khezri, Nima;Mohamad, Hisham;Fatahi, Behzad
    • Geomechanics and Engineering
    • /
    • v.11 no.4
    • /
    • pp.471-492
    • /
    • 2016
  • Underground tunnelling is one of the sustainable construction methods which can facilitate the increasing passenger transportation in the urban areas and benefit the community in the long term. Tunnelling in various ground conditions requires careful consideration of the stability factor. This paper investigates three dimensional stability of a shallow circular tunnel in a layered soil. Upper bound theorem of limit analysis was utilised to solve the tunnel face stability problem. A three dimensional kinematic admissible failure mechanism was improved to model a layered soil and limiting assumptions of the previous studies were resolved. The study includes calculation of the minimum support pressure acting on the face of the excavation in closed-face excavations. The effects of the characteristics of the layers on the minimum support pressure were examined. It was found that the ratio of the thickness of cover layers particularly when a weak layer is overlying a stronger layer, has the most significant influence on the minimum tunnel support pressure. Comparisons have been made with the results of the numerical modelling using FLAC3D software. Results of the current study were in a remarkable agreement with those of numerical modelling.

A study for application plan of rational residual water pressure on the tunnel linings (터널 라이닝에 작용하는 합리적인 잔류수압 적용방안 검토)

  • Jung, Kuk-Young;Kim, Ji-Yeop;Kim, Ji-Hun;Moon, Hoon-Ki
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.6
    • /
    • pp.463-499
    • /
    • 2011
  • Control of ground water is one of the most important factors for long-term operation of tunnel because most tunnels are located under the ground water level. In case of a drainage tunnel, there is no pore water pressure on the lining when the drainage system is properly working. After long-term operation, however, residual pore water pressure can be developed on the lining due to the deterioration of the drainage system. In this study, the water pressure distribution under obstruction condition of drainage material and conduit on the tunnel is numerically investigated using the ICFEP program and compared with the current value being applied to the residual water pressure for rational application plan of residual water pressure on the tunnel linings.

Current Status of Rock Cutting Technique Using Undercutting Concept (언더커팅 개념을 적용한 암반절삭기술의 현황 분석)

  • Jeong, Hoyoung;Choi, Seungbeom;Jeon, Seokwon
    • Tunnel and Underground Space
    • /
    • v.29 no.3
    • /
    • pp.148-156
    • /
    • 2019
  • In urban area, the use of mechanical excavators (e.g., TBM and roadheader) has been increasing in construction of tunnelling and underground space. The undercutting technology, which is modified from the conventional rock-cutting concept, has been developed by advanced countries. Therefore, research on the latest technology of mechanical excavation is required, and keeping carrying out research on conventional mechanical tunneling methods at the same time. In this study, as a fundamental study of the undercutting technique, the principle and concept of the undercutting were introduced, as well as the current status of the research of advanced countries. The undercutting is applicable as a full-face excavation method for the tunnels and underground spaces, as well as an auxiliary(partial-face excavation) method for extension of the existing tunnels.

InxGa1-xAs 화합물 반도체의 Indium 조성에 따른 Nanowire Field-Effect Transistor 특성 연구

  • Lee, Hyeon-Gu;Seo, Jun-Beom
    • Proceeding of EDISON Challenge
    • /
    • 2017.03a
    • /
    • pp.428-432
    • /
    • 2017
  • Silicon 기반 Metal-oxide-semiconductor field-effect transistor (MOSFET)의 크기가 감소함에 따라 silicon자체의 물성적 한계가 나타나고 있다. 이를 극복하고자 III-V 화합물 반도체가 채널소자로서 각광받고 있다. 본 연구에서는 III-V 화합물반도체 중 $In_xGa_{1-x}As$는 Indium 조성에 따른 전자구조 및 n-type MOSFET의 소자 특성을 본다. Indium의 조성이 증가함에 따라 subband의 개수와 간격이 증가하게 되어 Density of state가 감소하게 된다. 이로 인하여 Indium의 조성이 증가함에 따라 $In_xGa_{1-x}As$ 채널 MOSFET에서 상대적으로 Fermi level을 더 많이 상승시키게 되어 potential barrier를 얇아지게 만들며 또한 에너지에 따른 전류 밀도를 넓게 분포하도록 만든다. 이로 인하여 단채널에서는 In 조성이 증가함에 따라 direct source-to-drain tunnelling current이 증가하게 된다. 이로 인하여 In 조성의 증가에 따라 subthreshold swing과 ON-state current가 저하된다.

  • PDF