• Title/Summary/Keyword: Tunnel support system

Search Result 190, Processing Time 0.022 seconds

A Study on the Evaluation of Necessity for the Support in Case of Excavartion of the Transport Drift at Danyang Site (단양지역의 운방갱도 굴착시 갱도 지보의 필요성 판정에 관한 연구)

  • 이종욱;조만섭;김일중;김영석
    • Tunnel and Underground Space
    • /
    • v.3 no.1
    • /
    • pp.54-62
    • /
    • 1993
  • In order to evaluate the necessity for the support during the excavation of the transport drift and use the data for design applications, laboratory testings of mechanical properties of rock samples and engineering rock mass classifications on this study site were performed. The values of RMR and Q-system are 68 and 11.8, respectively. Since these results were evaluated as good, this rock mass were determined to be unsupported. Full face excavation method was determined to be suitable for excavating this drift. In case of excavation, smooth blasting techniques must be carried out at the wall rock and the crown. However, considering the blast vibration etc. that have an effect on the surrounding rock mass, approximately less than 9kg of explosive charges per blast should be maintained.

  • PDF

A re-appraisal of scoring items in state assessment of NATM tunnel considering influencing factors causing longitudinal cracks (종방향균열 영향인자 분석을 통한 NATM터널 정밀안전진단 상태평가 항목의 재검토)

  • Choo, Jin-Ho;Yoo, Chang-Kyoon;Oh, Young-Chul;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.479-499
    • /
    • 2019
  • State assessment of an operational tunnel is usually done by performing visual inspection and durability tests by following the detailed guideline for safety inspection (SI) and/ or precision inspection for safety and diagnosis (PISD). In this study, 12 NATM tunnels, which have been operational for more than 10 years, were inspected to figure out the cause of longitudinal cracks for the purpose of modifying the scoring items in the state assessment NATM tunnel related to the longitudinal crack and the thickness of concrete lining. All investigated tunnels were classified into four groups depending on the shape and usage of each tunnel. The causes of longitudinal crack occurrence were analyzed by investigating the correlations between the longitudinal crack and the following four factors: the patterns of ground excavation; construction state of primary support system; characteristics of material properties of the concrete lining; and thickness of lining which was obtained by Ground Penetration Radar (GPR) tests. It was found that influencing factors causing longitudinal cracks in the lining were closely related with the construction condition of the primary support system, i.e. shotcrete, rockbolt, and steel-rib; crack occurrences were not much affected by the excavation patterns. As for the properties of concrete lining materials, occurrence of the longitudinal crack was mostly affected by the following three items: w/c ratio; contents of cement; and strength of lining. When estimating the lining thickness of the concrete lining by GPR tests and taking thickness effect into account in the statement assessment, it was concluded that increase of the index score by an average of 0.03 (ranging from 0.01 up to 0.071) is needed; a more realistic way of state assessment should be proposed in which the increased index score caused by lack of lining thickness should be taken into account.

Stability Estimation of the Pillar between Twin Tunnels Considering Various Site Conditions (다양한 현장조건을 고려한 병설터널 필라의 안정성평가)

  • Kim, Ju-Hwan;Kim, Jong-Woo
    • Tunnel and Underground Space
    • /
    • v.27 no.2
    • /
    • pp.109-119
    • /
    • 2017
  • A lot of twin tunnels were modelled with different pillar widths, rock mass classes and stress ratios in order to consider various site conditions, and the stabilities of the pillars were estimated by numerical analyses and scaled model tests. The strength-stress ratios of the pillar were obtained from three different methods which were using the stresses appeared at the middle point, the whole average and the left/right edges of the pillar. The strength-stress ratio of the pillar edges showed relatively conservative values among them, and it was also practically consistent with the tunnel excavating steps comprising the construction sequence analyses which included the partial excavation and the support system. Scaled model tests were also performed to investigate the tunnel stability, where it was found that cracks were progressively generated from the pillar edges toward the middle point of the pillar. Therefore, in order to both prevent the local damage of pillar and conservatively estimate the tunnel stability, it was thought to be an appropriate method using the strength-stress ratio obtained from the left/right edges of the pillar.

Amber Information Design to Keep Safety-Driving Under Road Structure at Local-Scale Geographic (국지지역 도로 기반 시설에서 안전운전을 위한 경보 정보 설계)

  • Park, Jung-Chan;Hong, Gyu- Jang
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.1
    • /
    • pp.48-55
    • /
    • 2009
  • In order to keep safe driving conditions under road networks, there are several formations such as road structure, road surface condition, traffic occupancy and supplement of an accurate information of traffic status ahead To support safe-driving on each road formation, each formation is supplied with various information to help the driver. However, in some cases like rapid status change at local-scale geography, traffic information systems often displays insufficient information because of the lack of information correlation. In order to accurately aware the driver, all road formation must be in sync. It is important to supply accurate information to the driver because this information directly impacts the drivers on the road. This paper discusses the amber information to keep the least safety driving over road formations including tunnels and bridges. This paper also will propose the informations for safe-driving conditions, information linkage on the road and rule-base safety information, as ITS technology, being displayed for all drivers under the worst weather conditions.

Derivations of Positive Pressure Condition for Development of Foldable Safe Pathway in Railway Tunnel Fires (철도터널화재용 접이식 대피통로 개발을 위한 양압 조건 도출)

  • Kim, JiTae;Ro, Kyoungchul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.1
    • /
    • pp.284-289
    • /
    • 2019
  • The Korea Foldable safe pathway system is an evacuation support system to get temporary evacuation route in railway tunnel and large space fires. A prevention smoke screen is unfolded in fires and it is needed to prevent heat and smoke from fire source. Therefore, ventilation system for positive pressure condition is equipped with foldable safe pathway system. Numerical analyses of temperature and pressure distribution with distance from fire source were performed considering fire scenario of new train vehicle. The smoke temperatures did not exceed $200^{\circ}C$ that distance from the fire source was more than 20 m and smoke pressure was reduced with distance from fire source. Maximum smoke pressure was 14 Pa and average pressure was 6 Pa in position of prevention smoke screen. As results, to install foldable safe pathway system, ventilation system is need to maintain 6 Pa positive pressure condition.

Development of BIM for a Maintenance System of Subway Infrastructures (지하철 구조물 유지관리 시스템을 위한 BIM 개발)

  • Shim, Chang-Su;Kim, Seong-Wook;Song, Hyun-Hye;Yun, Nu-Ri
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.6-12
    • /
    • 2011
  • BIM(Building Information Modeling) technologies are the most effective for the maintenance of infrastructures because they provide information sharing througout the life-cycle of structures and support close communication between different project stages. Systematic and well-organized data play a fundamental role for the effective maintenance of subway tunnel. In this paper, 3D information models for maintenance of BIM-based subway tunnel structures are developed. Standard classifications for the maintenance and construction information classification system were adopted. A classification system based on construction information classification system was built considering procedures of maintenance work. It provides optimization and standardization of the work flow for the maintenance of subway structures by applying information modeling processes instead of the current maintenance practices. It can effectively reduces the life cycle cost and time for the maintenance. The proposed system can be utilized for the maintenance history management to enhance current maintenance system.

3-Dimensional Tunnel Analyses for the Prediction of Fault Zones (파쇄대 예측을 위한 터널의 3차원 수치해석)

  • 이인모;김돈희;이석원;박영진;안형준
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.4
    • /
    • pp.99-112
    • /
    • 1999
  • When there exists a fault zone ahead of the tunnel face and a tunnel is excavated without perceiving its existence, it will cause stress concentration in the region between the tunnel face and the fault zone because of the influence of the fault zone on the arching phenomena. Because the underground structure has many unreliable factors in the design stage, the prediction of a fault zone ahead of the tunnel face by monitoring plans during tunnel construction and the rapid establishment of appropriate support system are required for more economical and safer tunnel construction. Recent study shows that longitudinal displacement changes during excavation due to the change of rock property, and if longitudinal displacement and settlement, which are measured in the field, are considered together in displacement analysis, the prediction of change in rock mass property is possible. This study provided the method for the prediction of fault zones by analyzing the changes of L/C and (Ll-Lr)/C ratio (L= longitudinal displacement at crown, C = settlement at crown, Ll = longitudinal displacement at left sidewall, Lr = longitudinal displacement at right sidewall) and the stereographic projection of displacement vectors which were obtained from the 3-D numerical analysis of hybrid method in various initial stress conditions.

  • PDF

A Study on The Improvement of Related Regulation System for The Utility Tunnel Activation (지하공동구 활성화를 위한 관련규정 체계 개선에 관한 연구)

  • Oh, Won-Joon;Cho, Choong-Yeun;Lee, Min-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.563-571
    • /
    • 2020
  • The purpose of a utility tunnel is to prevent repeated excavation as well as disasters and calamity. Domestic utility tunnels have been built in new town development plans. Currently, it is difficult to establish a utility tunnel due to a conflict of opinions by organization and financing. In this paper, research was conducted based on systematic procedures to suggest ways of improving the activation of utility tunnels in new cities and existing cities. First, a survey was conducted on the laws and status of utility tunnels, and problems were derived based on the review and analysis of the status. Finally, a method suggesting improvement measures to solve problems was applied. Based on the related laws and problems, the status of the development project was analyzed to select the installation scale in the utility tunnel, and the appropriate scale was reviewed through economic feasibility analysis of the installation scale under 2 million square meters. Considering the new city and the existing city, it was proposed to support administrative expenses to reduce the burden on additional installation areas and occupied institutions in a utility tunnel. In addition, improvement plans were presented for the details of the master plan for reviewing the installation regional of the utility tunnel. This paper will help officials to work smoothly when planning and installing utility tunnels in the future.

A study on the development and field application of SP-Rockbolt with high-strength steel pipe (고강도 강관을 적용한 SP-록볼트 개발 및 현장 적용을 위한 연구)

  • Shin, Hyunkang;Jung, Hyuksang;Ahn, DongWook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.651-668
    • /
    • 2017
  • For initial stability of the tunnel, the primary support, Shotcrete and rockbolt shall be placed in the most appropriate time. This is because the role of such support plays a vital role in long-term and short-term tunnel stability. In this study, the rock bolt is an important supporting system that receives the external pressure generated by the stress relaxation during tunnel excavation as axial force and transmits it to the shotcrete on the tunnel excavation surface. Until now, most of the materials of rock bolts have been used in the field, but there have been many problems such as uncertain quality of Chinese materials entering the market, poor packing due to falling down of rock bolts when filled with mortar, and corrosion due to water. Therefore, in this study, we have developed a high strength steel pipe rock bolt using Autobeam material to solve and improve various problems of existing rock bolts. In order to evaluate the performance of the developed bolt, field tests were carried out and the existing mortar filler in order to improve the performance of the rock bolt, the design and construction criteria were studied and the results were included in this paper.

On Mechanical Behavior and Cracking Characteristics of Tunnel Lining by Numerical Analysis (수치해석에 의한 터널 복공의 역학적 거동 및 균열 특성에 관한 연구)

  • 이대혁;김재순;이희근;김성운
    • Tunnel and Underground Space
    • /
    • v.8 no.2
    • /
    • pp.146-156
    • /
    • 1998
  • Nemerical algorithms were developed to analyze the behavior of the double lining as well as ground mass separately or simultaneously. A lining interface element was especially developed, verified and applied to the study on the coupled interaction of shotcrete and the concrete lining. It could be known fro parameter studys on double lining support systems that as the contact surface between shotcrete and concrete lining was rougher, the more decreased bearing capacity against the cracking of the system. If the thickness of the shotcrete increased, the bearing capacity of the double lining also increased linearly with the thickness. If the thickness of the concrete lining increased, the bearing capacity of the double lining had the relationship of the characteristic S-shape of a sigmoid function with the thickness. When the thickness increased over a given value, it was not useful to increase more the thickness because bearing capacity had no remarkable change. It could be concluded that the behavior of the shotcrete and concrete lining was generally reversed before and after the ratio of horizontal to vertical earth preassure of 1.0 and 0.5 respectively. Therefore, we could guess that the movement which two shotcrete and concrete lining deflect toward each other around the crown caused a friction between two linings and thus this disadvantageous effect could contribute to reducing the bearing capacity against the cracking.

  • PDF