Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
Geomechanics and Engineering
/
제32권1호
/
pp.111-123
/
2023
The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.
Kim, Dong-Ho;Cho, Byung-Moon;Oh, Sae-Moon;Park, Dong-Sik;Park, Se-Hyuck
Journal of Korean Neurosurgical Society
/
제56권5호
/
pp.390-394
/
2014
Objective : In most patients with carpal tunnel syndrome (CTS), pain and/or paresthesia disappeared or decreased in a month after endoscopic carpal tunnel release (ECTR). However, subpopulation of patients showed delayed improvement following ECTR. We analyzed the delayed improvement hands to investigate the characteristics of those patients and to determine the predictable factors of delayed improvement. Methods : Single-portal ECTRs were performed in 1194 hands of 793 CTS patients from 2002 to 2011. Five-hundred seventy hands with minimal 1-year postoperative follow-up were included. We divided the 545 satisfied hands into early (group A) and delayed (group B) groups according to improvement period of 1 month. Demographic data, clinical severity and electrodiagnostic abnormality were compared between groups. Results : Group A included 510 hands and group B included 35 hands. In group B, 11 hands improved in 2 months, 15 hands in 3 months and 9 hands in 6 months, respectively. In group A/B, according to clinical severity, 60/1 hands were graded to I, 345/24 hands to II, 105/10 hands to III. In group A/B, based on electrodiagnostic abnormality, 57/3 hands were classified to mild, 221/11 hands to moderate and 222/21 hands to severe group. Statistical analysis between groups did not reach significance but electrodiagnostic or clinical severity had a tendency to affect the delayed response. Conclusion : It is difficult to predict the factors contributing to postoperatively-delayed response in subpopulation of CTS patients. However, we recommend that postoperative observation for at least 6 months is necessary in patients without symptomatic improvement.
최근 터널 갱구부와 저토피 구간에 대한 환경 친화적인 터널공법에 대한 관심이 증가하고 있다. 콘크리트 슬래브를 이용한 반개착식 터널공법을 적용한 연구 및 시공사례가 증가하고 있으나, 하중조합 및 아치콘크리트의 단면에 대한 별도의 적용 기준이 없다. 따라서 본 연구에서는 반개착식 공법에 대한 기준을 제시하기 위하여 지반조건과, 터널 상부 지층 두께, 되메움 두께, 상부지반 지표면의 경사 각도를 변화시키는 등의 다양한 조건들에 대하여 수치해석을 수행하였다. 수치해석 결과들을 회귀분석법으로 분석하고, 유도된 회귀 분석식을 분류하고 정리하여 합리적이고, 경제적이며, 안전한 반개착식 터널 굴착 공법의 기준을 제안하고자 하였다.
목적: 대퇴 근위 부착부가 파열된 급성 후방 십자 인대 파열에 있어서 후방 경격막 도달법을 이용한 관절경적 봉함술 및 보강술을 소개하고자 한다. 수술 술기: 슬관절의 관절경적 기본검사 후, 후내측 도달법과 후외측 도달법을 개설하여 후방 경격막 도달법을 확보한 후 파열되어 후방으로 이동된 후방 십자 인대 다발을 후내측 관절경적 시야 하에서 전내측에서 삽입한 Suture hook을 이용하여 봉합한다. 이 봉합사를 전내측으로 빼내어 견인하여 파열된 인대 다발을 과간 절흔으로 보낸 후 전방에서 추가 봉합을 시행한다. 남아 있는 후방 십자 인대 다발을 보존하면서 경골 및 대퇴골 터널을 만든 후에 자가 단일 다발 반건양 및 박 이식건을 터널을 통해 관절 내로 통과시키고 대퇴 터널을 통과 시킨 후방 십자 인대 봉합사과 함께 고정한다. 결론: 급성 후방 십자 인대 손상 시 특히, 대퇴 근위 부착부 파열의 경우 파열된 다발을 후방에서 관절경적 봉합술을 시행할 수 있으며 후방 경격막 도달법을 이용하여 남아있는 다발에 최소한의 손상을 주면서 경골 및 대퇴골 터널을 만들고 자가 슬괵 이식건을 보강함으로써 좋은 결과가 기대된다.
대형 대단면 터널의 시공시 지반 변형을 억제시키고 지반의 강성을 증가시키며 차수 및 지수를 확보하기 위해 다양한 사전 보강공법들이 굴착전 막장 천단부 전방에 적용되고 있으나 물성치 결정 및 시공단계 해석에 있어서 여러 오류를 안고 있다. 본 연구에서는 탄성파를 이용하여 사전보강영역의 시간 의존적 강도 및 강성 특성을 분석하는 기법을 제시하였다. 실내실험을 통해 획득한 탄성파속도와 전단강도는 경화시간에 따라 증가하며, 전단강도와 전단강도정수는 탄성파 속도와 일정한 관계를 갖는 것으로 분석된다. 재령에 따른 탄성계수와 점착력을 터널의 시공단계에 따른 시뮬레이션에 적용하여 경시효과가 터널 변위 거동에 미치는 영향을 분석하였다. 해석결과 $1{\sim}2$일 강도 및 강성을 적용한 결과가 경시효과를 고려한 경우와 갱구부에서 유사한 거동을 하며, 특히 초기 시공부분 및 갱구부에서 터널의 안정성에 큰 영향을 미치는 것으로 분석된다. 본 연구에서 제안된 기법을 통해 향후 사전보강영역의 경시효과를 고려한 터널 거동해석을 위해 실내실험과 수치해석을 병용하여 신뢰성 있는 터널 해석 및 설계를 수행하는 것이 바람직 할 것이다.
쉴드TBM 터널은 지반 굴착, 세그먼트 링 빌드(Segment ring-build), 뒷채움의 반복적인 공정으로 단순하다. 재래식 터널공법인 발파공법(Drill and Blast)은 막장관찰, 천공, 장약, 발파, 환기, 버력처리, 지보재 설치의 반복으로 쉴드TBM 터널보다 공정이 복잡하고 일부 제약조건이 따른다. 하지만 굴진을 위한 준비 작업은 지반을 보강하고 갱문조성 후 터널을 형성해 나가는 Drill and Blast에 비해서 쉴드TBM 터널은 매우 상세한 계획을 바탕으로 시간과 비용이 필요하다. 이는 대상지반을 굴착하는 쉴드TBM 장비의 성능 확보가 공사의 성패를 좌우하기 때문인데, 고가의 주문제작 장비인 쉴드TBM이 조립단계에서 잘못 구성되면 본 굴진은 물론 초기굴진 단계에서부터 구동이 어렵게 되고, 조립된 쉴드TBM 장비를 다시 해체하는 경우가 발생하게 되어 재조립하는 상황으로 진행되면, 공기는 물론 경제적인 손실이 발생하여 공사 기간 내내 어려움이 발생한다. 이에 본 연구에서는 한강 하저를 통과하는 국내 최대 직경의 도로터널을 건설하기 위한 이수식 쉴드TBM 조립을 위한 발진부지의 배치와 계획, 쉴드TBM 장비의 주요 부분별 조립공정을 검토하였고, 타공정과 의 간섭 최소화 및 커터헤드 조립과 운반의 효율성을 분석하여 현장여건에 맞게 개선하여 적용하였다.
e-AIRS, an abbreviation of 'e-Science Aerospace Integrated Research System,' is a virtual organization supporting CFD(computational fluid dynamics) simulations, remote experimental service, and collaborative and integrative study between computation and experiment. e-AIRS works on the e-Science environment and research process is accomplished through the web portal. By the system development since 2005, a stable education system with the full support on fluid dynamics is successfully established and utilized to various fluid dynamic lectures in universities. By using e-AIRS system during a lecture, students can conduct the full CFD simulation process on the web and inspect the wind tunnel experiment via Access Grid. This kind of interactive lecture makes students to have a deeper understanding on the physics of fluid, as well as the characteristics of numerical techniques. The current paper will describe system components of e-AIRS and its utilization on education.
The all inside anterior cruciate ligament reconstruction technique places an anterior ligament substitutes within two bony sockets rather than hone tunnel. This approach is accomplished through arthroscopic three portal which avoids the surgical exposure and morbidity associated with creating traditional bone tunnel. This technique has several distinct advantages when compared with the traditional ACL reconstruction through the bone tunnels. It offers the surgeon a less morbid method for ACL reconstruction that positions an ACL substitute at the anatomic attachment sites of the original ACL with two bone sockets, obviating the need for traditional bone tunnels. Graft fixation at or near the anatomic attachment points of the original ACL minimizes creep with early range of motion and reduces the abrasive 'wind-shield wipe' motion of the graft which occur with bone plugs positioned inside bone tunnels. The sagittal posterior angle to the tibial socket increases fixation strength to pullout with anterior translation force for the tibia on the femur. This technique is not graft specific and can accomodate any graft in which graft length can be customized to the intraarticular native ACL length.
단양과 가곡을 잇는 기존 구국도 59호선에는 35개소의 절토사면이 존재한다. 본 구간은 도로선형이 복잡하고, 폭이 협소하며, 2002년과 2006년 집중강우의 영향으로 절토사면 붕괴, 산사태, 도로침하 현상이 발생되는 등 위험성이 높아 신설국도를 계획하게 되었다. 2006년 12월 신설국도 공사 중 터널입구부사면이 붕괴되었으며, 상부에 존재하는 군도의 중앙선을 따라 인장균열이 발생되었다. 붕괴원인 파악 및 대책공법 제시를 위해서 면밀한 현장조사 및 인장균열에 대한 모니터링을 실시하였고, 스테레오투영망 해석, 한계평형해석, 유한차분해석을 수행하였다.
Several remedial works were attempted to stabilize the collapsed area of the inlet slopes of diversion tunnel, but prevention of any further movement was being only carried out at beginning stage by filling the area with aggregates and rock debris, after several cracks had been initiated and developed around the area. The extra specialty developed folding zone is consisted with highly weathered Greywacke and Black shale. The suggested solution is to improve the properties of the rock mass of failed area by choosing the optimum level of reinforcement through the increment of slope rock support design so as to control the movement of slopes during the re-excavation. The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia. The power station will consist of a 210m height Concrete Faced Rockfill Dam. During the construction of the dam and the power facilities the Balui River has to be diverted of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four defined Rock Mass Type (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each "global" slope without any rock support and shotcrete system. In the second stage, it is calculated for each "local" slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.