• Title/Summary/Keyword: Tunnel grouting construction process

Search Result 18, Processing Time 0.025 seconds

A Development of Tunnel Grouting Programme using A Research of Grouting Construction Process (터널 차수 그라우팅 시공 프로세스 연구를 통한 프로그램 개발)

  • Kim, Jin-Chun;Yoo, Byung-Sun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.11 no.1
    • /
    • pp.23-30
    • /
    • 2018
  • The purpose of this study is to provide an integrated solution which includes construction process that allows effective tunnel grouting and to develop a tunnel grouting programme by establishing an algorithm through theoretical analysis on tunnel grouting construction technique factors. In order to verify the developed tunnel grouting procedure and the effectiveness of the programme, they are applied on certain work sites. Values after the application are Lu = 0.31 and ground-water inflow = 0.191/min where as the pre-application value of ground-water inflow is 6.691/min which is approximately 35 times larger. This shows that Tunnel grouting construction effect is significant and suggests the possibility of the application of the process and the programme on future tunnel grouting construction.

A Study on Application of Improved Tunnel Water-Sealing Grouting Construction Process and the Inverse Analysis Material Selection Method Using the Injection Processing Results (개선된 터널 차수그라우팅 시공 프로세스 적용 및 그 주입시공결과를 이용한 역해석 재료선정방법 연구)

  • Kim, Jin Chun;Yoo, Byung Sun;Kang, Hee Jin;Choi, Gi Sung;Kim, Seok Hyun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.15 no.3
    • /
    • pp.101-113
    • /
    • 2022
  • This study is planned with the aim of developing a systematic construction process based on the scientific and engineering theory of the water-sealing grouting construction applied to the tunnel excavation process during the construction of the downtown underground traffic network, so that the construction quality of the relatively backward domestic tunnel water-sealing grouting construction is improved and continuously maintained no matter who constructs it. The main contents of the improved tunnel water-sealing grouting can be largely examined in the classification of tunnel water-sealing grouting application and the definition of grouting materials, the correlation analysis of groundwater pressure conditions with groundwater inflow, the study of the characteristic factors of bedrock, and the element technologies and injection management techniques required for grouting construction. Looking at the trends in global research, research in the field of theoretical-based science and engineering grouting is actively progressing in Nordic countries (Sweden, Finland, Norway, etc.), Japan, Germany, and the United States. Therefore, in this study, the algorithm is established through theoretical analysis of the elements of tunnel water-sealing grouting construction techniques to provide an integrated solution including a construction process that can effectively construct tunnel water-sealing grouting construction.

Excavation Support Design and Stability Analysis of Shallow Tunnel in Heavily Fractured Rock Mass (연약 파쇄 지반내 터널의 굴착.보강 설계 및 안정성 분석)

  • Shin, Hee-Soon;Synn, Joong-Ho;Park, Chan;Han, Kong-Chang;Choi, Young-Hak;Choi, Yong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.87-92
    • /
    • 2000
  • In excavation of tunnels especially located in shallow depth, it is not rare to meet geological change in excavation progress worse than expected in the initial design stage. This paper present a case study on the re-design of excavation and support system of a shallow tunnel under construction where it meets the unexpected bad geological condition during excavation. The detailed geological investigation shows that the rock mass is heavily weathered and fractured with RMR value less than 20. Considering this geological condition, the design concept is focused on the reinforcement of the ground preceding the excavation of tunnel. Two design patterns, LW-grouting & forepoling with pilot tunnelling method and the steel pipe reinforced grouting method, are suggested. Numerical analysis by FLAC shows that these two patterns give the tunnel and roof ground stable in excavation process while the original design causes severe failure zone around the tunnel and floor heaving. In point of the mechanical stability and the degree of construction, the steel pipe reinforced grouting technique proved to be good for the reinforcement of heavily fractured rock mass in tunnelling. This assessment and design process would be a guide in the construction of tunnels in heavily weathered and fractured rock mass situation.

  • PDF

Settlement behaviours and control measures of twin-tube curved buildings-crossing shield tunnel

  • Jianwei, Jia;Ruiqi, Gao;Defeng, Wang;Jianjun, Li;Ziwen, Song;Jinghui, Tan
    • Structural Engineering and Mechanics
    • /
    • v.84 no.5
    • /
    • pp.699-706
    • /
    • 2022
  • Settlement control techniques are critical for the safety of shield tunnel constructions, especially for facing complex situations. In this study, the shield tunnel structure from Huaita east road station to Heping Road station in Xuzhou metro No.3 line (China) is taken as engineering background, which has various complex problems of the upper-soft and lower-hard composite stratum conditions, twin curve shield tunnels, and underpass the foundation of the piled raft. The deformation characteristics of shield tunnelling passing through buildings are explored. Subsequently, comprehensive research methods of numerical simulation and field measurement are adopted to analyzing the effectiveness of settlement control by using the top grouting technique. The results show that the settlement of the buildings has obvious spatial characteristics, and the hysteresis effect can be obviously observed in soil deformation caused by shield construction. Meanwhile, the two shield constructions can cause repeated disturbances, reducing the soil deformation's hysteresis effect. Moreover, the shield tunnel's differential settlement is too large when a single line passes through, and the shield construction of the outer curve can cause more significant disturbance in the tunnel than the inside curve. Notably, the proposed process control parameters and secondary topgrouting method can effectively control the deformation of the shield tunnel, especially for the long-term deformation.

A Study on the P~q~t Charts Applicability for Quality Improvement of Water-Sealing&Reinforcement Grouting in Tunneling Work Underneath the City (도심지 지하 터널시공 중 차수·보강 그라우팅 공사의 품질향상을 위한 P~q~t charts 적용성 연구)

  • Kim, Jin-Chun;Kim, Seok-Hyun;Yoo, Byung-Sun;Kang, Hee-Jin
    • Journal of Korean Society of Disaster and Security
    • /
    • v.14 no.3
    • /
    • pp.51-63
    • /
    • 2021
  • This study is for the quality improvement of water-sealing & reinforcement grouting in tunnel of the construction of the underground transportation network underneath the city. Existing tunnel grouting process did not technically utilize P~q~t charts fully. It is due to the absence of technical methods to decide how P~q~t charts change in the presence of trouble and what the change represents in grouting. There were no standards to decide which chart pattern represents which ground characteristics, how to categorize ground types, and how to take measures according to the standards. This paper studies on the grouting type, ground characteristics, ground type categorizing method, and countermeasures for both general and algorithm-processed grouting in soil and rock layer to address the aforementioned problems. Newly improved P~q~t charts from grouting in soil was categorized into six different types. Different characteristics and categorization method was developed for each type. Countermeasures for each type of grouting process were developed so that on-site application can be readily available. Improved P~q~t charts for rock layer also have six different types of grouting. Each type was given the countermeasures for rock layer grouting process for easier applications. Therefore, it is expected to be used through out the entire process of grouting from preparation to the last report of the water-sealing & reinforcement grouting in tunnel of the construction of the underground transportation network underneath the city.

An improved approach to evaluate the compaction compensation grouting efficiency in sandy soils

  • Xu, Xiang-Hua;Xiang, Zhou-Chen;Zou, Jin-Feng;Wang, Feng
    • Geomechanics and Engineering
    • /
    • v.20 no.4
    • /
    • pp.313-322
    • /
    • 2020
  • This study focuses on a prediction approach of compaction compensation grouting efficiency in sandy soil. Based on Darcy's law, assuming that the grouting volume is equal to the volume of the compressed soil, a two-dimensional calculation model of the compaction compensation grouting efficiency was improved to three-dimensional, which established a dynamic relationship between the radius of the grout body and the grouting time. The effectiveness of this approach was verified by finite element analysis. The calculation results show that the grouting efficiency decreases with time and tends to be stable. Meanwhile, it also indicates that the decrease of grouting efficiency mainly occurs in the process of grouting and will continue to decline in a short time after the completion of grouting. The prediction three-dimensional model proposed in this paper effectively complements the dynamic relationship between grouting compaction radius and grouting time, which can more accurately evaluate the grouting efficiency. It is practically significant to ensure construction safety, control grouting process, and reduce the settlement induced by tunnel excavation.

A two-step interval risk assessment method for water inrush during seaside tunnel excavation

  • Zhou, Binghua;Xue, Yiguo;Li, Zhiqiang;Gao, Haidong;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng
    • Geomechanics and Engineering
    • /
    • v.28 no.6
    • /
    • pp.573-584
    • /
    • 2022
  • Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.

Application of the SASW Method to the Evaluation of Grouting Performance for a Soft Ground of a Tunnel (터널 원지반의 그라우팅 보강 평가를 위한 SASW 기법의 적용)

  • 조미라;강태호
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.273-283
    • /
    • 2003
  • Fissured rock and soft ground always suggest, problems in the construction of the underground space. The stress release of the weak underground material by opening the underground space with a soft ground, fissures and joints can lead to the failure of the opening. Grouting of the weak rock and the soft ground, which is a process of injecting some bonding agents into the soft ground, is one of the measures to reinforce the soft ground and to prohibit the failure of the underground construction due to the stress release. The proper installation of the grouting is essential to ensuring the safety of the tunneling operation, so that the evaluation of the grouting performance is very significant. The general procedure of evaluating the grouting is coring the grouted section and measuring the compression strength of the core. However, sometimes when the grouted section is at the crown of the tunnel and the grouting is installed at a wide section, the coring is not good enough. This study is oriented to propose a new and a non-destructive procedure of evaluating the grouting performance. The proposed method is based on the wave propagation of elastic waves, and evaluates the shear stiffness of the ground and investigates the anomalies such as voids and cracks. The SASW ( Spectral-Analysis-of-Surface-Waves) method is one of the candidate s to make the inspection of the pouting performance, and is adopted in this study. The practical grouting activity was monitored by SASW method, and the proposed method was applied to the inspection of the grouting performance to check the verification of the proposed method.

Study on the effect of tail void grouting on the short- and long-term surface settlement in the shield TBM Tunneling using numerical analysis (쉴드TBM터널에서 뒤채움 주입이 지반의 단기·장기 침하에 미치는 영향에 대한 수치해석적 연구)

  • Oh, Ju-Young;Park, Hyunku;Kim, Dohyoung;Chang, Seokbue;Lee, Seungbok;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.265-281
    • /
    • 2017
  • For shallow tunnel constructions, settlement of the ground surface is a main issue. Recent technical developments in shield TBM tunneling technique have enabled a decrease in such settlements based on tunneling with ground deformation controls. For this objective, the tail void grouting is a common practice. Generally surface settlements in a soil of low permeability occur during a tunnel construction but also during a long period after completion of the tunnel. The long-term settlements occur mainly due to consolidation around the tunnel. The consolidation process is caused and determined by the tail void grouting which leads to an excess pore water pressure in the vicinity of the tunnel. Because of this, the grouting pressure has a strong effect on the long-term settlements in the shield tunneling. In order to investigate this effect, a series of coupled hydro-mechanical 3D finite element simulations have been performed. The results show that an increase in grouting pressure reduces the short-term settlements, but in many cases, it doesn't lead to a reduction of the final settlements after the completion of consolidation. Thereby, the existence of a critical grouting pressure is identified, at which the minimal settlements are expected.

Field test and research on shield cutting pile penetrating cement soil single pile composite foundation

  • Ma, Shi-ju;Li, Ming-yu;Guo, Yuan-cheng;Safaei, Babak
    • Geomechanics and Engineering
    • /
    • v.23 no.6
    • /
    • pp.513-521
    • /
    • 2020
  • In this paper, due to the need for cutting cement-soil group pile composite foundation under the 7-story masonry structure of Zhenghe District and the shield tunnel of Zhengzhou Metro Line 5, a field test was conducted to directly cut cement-soil single pile composite foundation with diameter Ф=500 mm. Research results showed that the load transfer mechanism of composite foundation was not changed before and after shield tunnel cut the pile, and pile body and the soil between piles was still responsible for overburden load. The construction disturbance of shield cutting pile is a complicated mechanical process. The load carried by the original pile body was affected by the disturbance effect of pile cutting construction. Also, the fraction of the load carried by the original pile body was transferred to the soil between the piles and therefore, the bearing capacity of composite foundation was not decreased. Only the fractions of the load carried by pile and the soil between piles were distributed. On-site monitoring results showed that the settlement of pressure-bearing plates produced during shield cutting stage accounted for about 7% of total settlement. After the completion of pile cutting, the settlements of bearing plates generated by shield machine during residual pile composite foundation stage and shield machine tail were far away from residual pile composite foundation stage which accounted for about 15% and 74% of total settlement, respectively. In order to reduce the impact of shield cutting pile construction on the settlement of upper composite foundation, it was recommended to take measures such as optimization of shield construction parameters, radial grouting reinforcement and "clay shock" grouting within the disturbance range of shield cutting pile construction. Before pile cutting, the pile-soil stress ratio n of composite foundation was 2.437. After the shield cut pile is completed, the soil around the lining structure is gradually consolidated and reshaped, and residual pile composite foundation reaches a new state of force balance. This was because the condensation of grouting layer could increase the resistance of remaining pile end and friction resistance of the side of the pile.