Prediction of aerodynamic coefficients of streamlined bridge decks using artificial neural network based on CFD dataset

  • Severin Tinmitonde;Xuhui He;Lei Yan;Cunming Ma;Haizhu Xiao
    • Wind and Structures
    • /
    • 제36권6호
    • /
    • pp.423-434
    • /
    • 2023
  • Aerodynamic force coefficients are generally obtained from traditional wind tunnel tests or computational fluid dynamics (CFD). Unfortunately, the techniques mentioned above can sometimes be cumbersome because of the cost involved, such as the computational cost and the use of heavy equipment, to name only two examples. This study proposed to build a deep neural network model to predict the aerodynamic force coefficients based on data collected from CFD simulations to overcome these drawbacks. Therefore, a series of CFD simulations were conducted using different geometric parameters to obtain the aerodynamic force coefficients, validated with wind tunnel tests. The results obtained from CFD simulations were used to create a dataset to train a multilayer perceptron artificial neural network (ANN) model. The models were obtained using three optimization algorithms: scaled conjugate gradient (SCG), Bayesian regularization (BR), and Levenberg-Marquardt algorithms (LM). Furthermore, the performance of each neural network was verified using two performance metrics, including the mean square error and the R-squared coefficient of determination. Finally, the ANN model proved to be highly accurate in predicting the force coefficients of similar bridge sections, thus circumventing the computational burden associated with CFD simulation and the cost of traditional wind tunnel tests.

국내 NATM시공 사고사례에 의한 개선방안 연구 (A Study on a Method of Improvement from Domestic NATM Case)

  • 김무일;이상웅
    • 한국안전학회지
    • /
    • 제9권4호
    • /
    • pp.92-102
    • /
    • 1994
  • NATM as method of tunneling has been applied to construction of domestic subway, roads, rail way, water way etc. Accordingly we have NATM's many drafts and constructional results, but many problems and accidents have occurred under construction of tunnel using NATM for shortage of technical data, poorness of constructional improvement, systemic inconsistency etc. Especially, everyone was shocked at Gupo's train wrecking accident lately. The purpose of this thesis is presentation of means for settling technical problems, by looking into Gupo's train wrecking accident and home records that applying NATM in tunneling failed, to minimize future safety accidents we find that the general problems of home fifteen sites haying occured accidents is badly geological survey, nonconfirmation of base rock's state, formal measuring management, shortage of specialists, systemical discrepancy and that disregarding NATM's rules makes general problems. The results of this study are summarised as follows ; 1. We advise repletion of design standards to practice crosshole test for confirming connected rock base on vertical section of tunnel. 2. We advise to practice pre-boring and pre-grouting for a weak layer difficult in applying NATM. 3. We advise systemic improvements that field servicer can construct tunnel of his own free will considering base rock's state at tunnel. 4. We advise that specialist, who can make a conduct and supervise above mentioned items as well as measuring managements, should be posted at field.

  • PDF

터널 지보패턴 결정을 위한 위험도 분석 (A risk analysis for the determination of a tunnel support pattern)

  • 유광호;박연준
    • 한국터널지하공간학회 논문집
    • /
    • 제5권3호
    • /
    • pp.241-250
    • /
    • 2003
  • 암반은 그 특성상 매우 불균질하며, 조사 및 시험을 통하여 얻을 수 있는 자료는 아주 한정적이다. 이러한 이유 때문에 암반 중에 구조물을 구축하는 작업은 많은 불확실성 (uncertainties)을 내포하게 된다. 터널 설계에 있어서 주요 설계 파라미터인 지보패턴, 굴진장 및 굴착방법 등은 최적의 값으로 결정되어야 하나 그 결정이 쉽지 않으며, 결정을 잘못할 경우 원하지 않는 risk, 즉 터널 안정성의 저하 혹은 지보재의 지나친 보강으로 인한 경제적 손실을 발생시킨다. 본 연구에서는 터널설계 시 주요한 설계 파라미터인 지보패턴 및 굴진장을 위험도 분석 기법에 근거하여 결정하는 방법을 소개하였다. 지보량이 증가할수록 신뢰지수가 증가하여 터널의 안정성이 증가함을 정량적으로 확인할 수 있었으며, 터널의 붕괴 등으로 말미암아 발생할 수 있는 손실비용 및 공사비를 고려하여 위험도 분석을 실시함으로서 최적의 지보패턴 및 굴진장을 정량적으로 결정할 수 있었다.

  • PDF

인공신경망을 이용한 터널 거동 예측 시스템 개발 (The Development of Tunnel Behavior Prediction System Using Artificial Neural Network)

  • 이종구;문홍득;백영식
    • 한국지반공학회논문집
    • /
    • 제19권2호
    • /
    • pp.267-278
    • /
    • 2003
  • 인공신경망은 복잡한 문제를 해결하는데 있어 여러 분야에서 널리 활용되고 있는 매우 효과적인 기법으로 알려져 있다. 본 연구에서는 터널거동을 효과적으로 예측하기 위해 이러한 인공신경망 기법을 이용한 터널거동 예측시스템 (TBPS)을 개발하였다. 본 시스템 개발을 위해 시공이 완료된 31개 현장 193 개소 지점으로부터 얻은 터널 계측자료 (즉, 천단침하, 내공변위, 록볼트 축력, 숏크리트 압축 및 전단응력, 내진시 라이닝의 응력 등)를 D/B화하여 이용하였다. 또한 개발된 TBPS의 학습을 위해 가장 효과적이라 알려진 역전파 알고리즘을 사용하여 이들 자료의 학습을 실시하였다. 이러한 과정을 통해 개발된 TBPS를 이용하여 예측한 터널 거동 값과 현장계측 값, 수치해석에 의한 결과 값의 상호 비교 분석을 실시하였다. 비교분석 결과, TBPS에 의한 거동예측결과 값의 변화는 실무에 적용 가능한 범주에 있는 것으로 나타났다. 따라서 본 연구에서 개발된 TBPS는 터널의 타당성검토나 기본 및 실시설계 등에 적용하여 효율적으로 필요한 정보를 신속하게 얻을 수 있는데 사용될 수 있을 것으로 판단된다.

Estimation of geomechanical parameters of tunnel route using geostatistical methods

  • Aalianvari, Ali;Soltani-Mohammadi, Saeed;Rahemi, Zeynab
    • Geomechanics and Engineering
    • /
    • 제14권5호
    • /
    • pp.453-458
    • /
    • 2018
  • Geomechanical parameters are important factors for engineering projects during design, construction and support stages of tunnel and dam projects. Geostatistical estimation methods are known as one of the most significant approach at estimation of Geomechanical parameters. In this study, Azad dam headrace tunnel is chosen to estimate Geomechanical parameters such as Rock Quality Designation (RQD) and uniaxial compressive strength (UCS) by ordinary kriging as a geostatistical method. Also Rock Mass Rating (RMR) distribution is presented along the tunnel. Main aim in employment of geostatistical methods is estimation of points that unsampled by sampled points.To estimation of parameters, initially data are transformed to Gaussian distribution, next structural data analysis is completed, and then ordinary kriging is applied. At end, specified distribution maps for each parameter are presented. Results from the geostatistical estimation method and actual data have been compared. Results show that, the estimated parameters with this method are very close to the actual parameters. Regarding to the reduction of costs and time consuming, this method can use to geomechanical estimation.

지하비축기지 건설시 지질조건을 고려한 건설공정의 가시화와 최적화 사례 (Visualization and Optimization of Construction Schedule Considering the Geological Conditions in the Complicated Underground Cavern)

  • 최용근;박준영;이성암;김호영;이희석;이승철
    • 터널과지하공간
    • /
    • 제19권3호
    • /
    • pp.167-173
    • /
    • 2009
  • 지하비축기지는 터널의 규모와 건설공정의 복잡성, 지질 및 지반공학적인 문제들로 인해 가장 난해한 지하공간건설 프로젝트로 알려져 있다. 최근 복잡한 지하구조를 3차원으로 가시화하고, 건설 자원과 지반조건 그리고 공정계획을 고려한 4차원 시뮬레이션을 활용하여 건설공정을 최적화하는 기술이 지하비축기지 건설 프로젝트에 적용되었다. 이 사례연구는 지하구조의 3차원 모델링을 통해 작업자가 복잡한 지하 현황을 쉽게 이해하고, 정확한 3차원 공간상에서 지질자료를 분석하고 검토할 수 있도록 도와줄 수 있음을 보여주고 있다. 또한 건설공정과 실제 공기를 고려한 4차원 시뮬레이션을 활용하여 자재와 버력의 반출입에서 나타날 수 있는 bottle neck의 위치와 시점을 판단하거나 일일 공사비의 변동을 검토하고, 작업조와 투입장비의 수, 터널 시공방향 및 굴착 착수 시점, 버력 및 자재의 운반경로를 검토함으로써 공정의 최적화를 달성할 수 있었다.

기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구 (A study on the normal project duration development for the construction of multi-utility tunnel in the existing city)

  • 이성원;이필윤;변요셉;조중연;이민재
    • 한국산학기술학회논문지
    • /
    • 제19권12호
    • /
    • pp.677-685
    • /
    • 2018
  • 건설공사에서 공정관리는 기본적으로 가장 중요한 단계이며, 효율적인 공정관리를 위해서는 합리적 공정표 작성이 우선시 되어야 한다. 설계단계에서는 기상조건과 현장 특성을 고려한 다양한 조건과 공법의 비교 검토를 통해 최적의 공사 기간을 산정할 수 있으나, 기획단계에서 기본적인 자료(D/B) 분석만으로는 효율적 공법 선정과 적정한 공사 기간 산정이 어렵다. 따라서, 기획단계에서 기존시가지의 공동구 건설시 표준공기 분석을 위하여, 본 논문에서는 공동구 형식을 개착식 및 터널식으로 구분하고, 각 형식의 특성과 기존시가지의 조건을 고려한 공법을 선정 하도록 하였다. 합리적인 공기 계산을 위하여 외부 공사에 영향을 주는 기상조건을 고려하여 년 간 가동율을 산정 하였으며, 개착식은 RC 공법/터널식은 Shield TBM 공법에 대한 단위공정을 분석하였다. 각 단위공정을 종합하여 연장 1,200m, 환기구 200m 간격으로 가정한 공사의 표준공기를 산정한바, 개착식은 893일, 터널식은 616일이 소요되는 것으로 분석 되었다. 본 연구의 결과는 기획단계에서 보다 쉽게 공동구 형식 선정과 표준공기 산정에 도움이 될 것이며, 추후 설계단계에 연계하면 공정 및 공사비 산정이 용이할 것으로 판단된다.

NATM 터널 굴착시 초기 내공변위와 최종 내공변위의 상관관계 연구 (A study on the relationship between initial and final convergence in NATM tunnels)

  • 김범주;황영철
    • 한국터널지하공간학회 논문집
    • /
    • 제10권3호
    • /
    • pp.233-243
    • /
    • 2008
  • 터널 건설시 조사 및 설계 단계에서 예측한 터널의 거동은 지반의 지질 구조 및 재료 특성의 복잡함 등으로 인해 실제 시공 중의 거동과 일치하지 않는 경우가 많다. 따라서 시공 중에는 관찰과 계측을 통하여 지반과 지보재의 거동을 확인하고 위험이 예상될 경우 신속히 굴착 방법 및 보강 방법 등을 변경하므로써 터널의 안정성을 확보해야 한다. 그리고 이러한 목적을 위해서는 가급적 굴착 초기 단계에서 터널의 변형 거동을 파악하고 이로부터 최종적인 변위를 예측하는 과정이 필요하다. 본 연구에서는 NATM 방식에 의해 시공 중인 국내 두 곳의 도로터널 현장에서 수집한 변위 계측 data를 분석하여 굴착 초기 측정 내공변위량과 최종 내공변위량과의 관계를 통계적으로 유도하였다. 이 때 굴착 후 계측 전 까지 미측정 내공변위량을 추정하기 위하여 기존의 근사함수식을 수정하여 회귀분석하는 방법과 본 연구에서 제안하는 막장거리 1D(D:터널직경)까지의 계측 data를 이용하여 현장에서 용이하게 적용할 수 있는 간단한 선형 회귀분석을 이용하는 방법을 적용하였다. 최종적으로, 계측 전 변위량을 포함한 굴착 초기 내공변위와 최종 내공변위와의 관계를 통계적 방법을 통해 선형관계식으로 근사적으로 표현할 수 있었으며, 이 때 계측 전 변위량 추정방법으로 지수함수를 이용한 경우와 선형 회귀분석을 이용한 경우에 대해서 결과의 차이는 그다지 크지 않은 것으로 나타났다.

  • PDF

경암반에서 TBM 굴진 해석 및 평가 (Analysis and Assessment of Tunnel Boring Machine Performance in Hard Rock)

  • 배규진;이용수;홍성완;박홍조
    • 터널과지하공간
    • /
    • 제4권2호
    • /
    • pp.144-155
    • /
    • 1994
  • This research is designed to assess current achievement levels for mechanized excavation systems in Korea adn suggest the model predictive of TBM performance using statistical approaches. A test section in the TBM construction sites is selected to measure and analyze TBM performance. The field records including operating data, time allocation into downtime catagories, and machine design are analyzed on a shift basis. There are a total of 240 shifts, with most days operating two shifts per day. Examples of the probability density functions produced from the test section are presented and discussed. Relationships between TBM penetration rate and rock physical properties are investigated and the empirical equations for TBM performance prediction are also assessed with the field data.

  • PDF

터널 굴착에 따른 전기비저항 모니터링 기술 적용 (Application of resistivity monitoring with tunnel excavation area)

  • 안희윤;정재형;조인기;김정호;배규진
    • 한국터널지하공간학회 논문집
    • /
    • 제10권4호
    • /
    • pp.405-420
    • /
    • 2008
  • 전기비저항 탐사법은 터널 주변 지반 혹은 암반의 안정성을 조사하기 위해 사용되는 물리탐사법 중의 하나이다. 다양한 물리탐사법 중에서도 전기비저항 탐사법은 터널설계 단계에서 미리 소사가 수행되어 시공비용을 절감하고 안정성을 확보하기 위한 중요한 자료로 이용되고 있다. 현재 전기비저항 탐사 자료의 해석은 주로 1회의 단일 측정 자료를 대상으로 이루어지고 있지만, 터널 굴착이나 기 굴착된 터널의 유지관리를 위해서는 터널 주변의 시간에 따른 지하수의 분포상황 변화 등이 관측되어야 한다. 이를 위해서는 모니터링 기법이 도입되어야 한다. 따라서 터널 굴착에 따른 전기비저항 변화 파악을 위하여 격자형 측선을 설치하여 총 6회의 전기비저항 모니터링을 수행하였다. 또한 모니터링 시스템을 통해 조사지역에 분포하는 단층대에 상세한 정보를 제공함으로써 안전시공에 예측 시스템으로 가능유무를 평가하고자 하였다.

  • PDF