• 제목/요약/키워드: Tunnel design and construction data

검색결과 141건 처리시간 0.023초

Hoek-Brown 암반모델을 이용한 비선형 유한요소 터널해석 및 평가 (Evaluation of Non-linear FEM Tunnel Analysis by using Hoek-Brown반s Insitu Rock Model)

  • 이봉열;김광진;김학문
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1994년도 가을 학술발표회 논문집
    • /
    • pp.235-246
    • /
    • 1994
  • At pre-construction design stage, most of the design data are based on the site investigation results or property estimation which often does not provide satisfactory output for the tunnel analysis. Nonlinear FEM tunnel analysis was cariied out by Hoek-Brown model which is principly semi-empirical design method based on insitu rock descriptions, rock test results as well as field measurement data. The results of the analytical methods from Hoek-Brown model and Mohr-Coulomb model are compared with the sige measurement data from two-NATM tunnel construction sites. It was found that the Hoek-Brown model can be satisfactorily adopted as a feed back analysis technique in order to examin the safety of NATM tunnel at any construction stage.

  • PDF

Application of the auxiliary tunnel reinforcement design using the decision making tools based on expert system integrated fuzzy inference rule

  • Kim Changyong;Hong Sungwan;Bae Gyujin;Kim Kwangyeom
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2003년도 Proceedings of the international symposium on the fusion technology
    • /
    • pp.262-271
    • /
    • 2003
  • Specification of reinforcement method was suggested according to the ground condition and tunnelling environment such as adjacent building and surface settlement. Tunnel database consists of 8 different groups of data according to the tunnel construction situations and major problems of ground. A tunnel countermeasure expert system based on client/server system was developed with on-line. The expert system provides proper solution to the each construction sites backing up the information of the tunnelling and ground information through Internet. The effective factors of tunnel construction were shown by the analyzing relationship and partial relationship between face stability and RMR factors. This study will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system escaping from the dependence of some experienced experts for the absent of guide.

  • PDF

터널 스캐너를 이용한 터널 유지관리시스템 개발에 관한 연구 (A Study for Tunnel Management System Development Using a Tunnel Scanner)

  • 윤태국;이송
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제12권3호
    • /
    • pp.183-190
    • /
    • 2008
  • 국가 중요시설물인 터널에 대한 유지관리업무는 관리주체별, 용도별, 터널 규모별로 각각 상이하게 수행되고 있다. 현재 각 관리주체별로 운영중인 국내 터널유지관리시스템을 분석해보면 수기 또는 초보적인 전산화만이 되어 활용도가 매우 저조한 것이 현 상태이다. 이에 본 연구에서는 터널의 계획, 설계, 시공 단계의 관련자료 뿐 아니라 보수 보강 이력 자료 등의 유지관리단계에서 조사된 여러 현장조사와 터널 스캐너에 의한 결과를 통합한 새로운 터널유지관리시스템을 구축하여 국내 여러 터널 현장에 적용한 후, 이의 적용성을 분석하였고, 터널 유지관리방법의 개선안을 제안하였다.

최신 투 아치 터널의 굴착 공법과 구조 및 설계 (New Construction and Design Method of Two Arch Tunnel)

  • 윤석렬;권오현;서동현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.938-945
    • /
    • 2004
  • In order to cope with ever growing traffic flow and complexity in the urban area, construction demands for expanding and realigning of existing urban roads and massive development of underground space within the urban area are in its increasing trend, it is fact that, mainly due to lack of statistical data accumulation through real construction, technology and construction practice to support such demands can hardly be said to have been established enough and leave many things still to be developed. These circumstances therefore came to motivate me to get into a study for a particular subject of "Design Basics for Closely Neighbored Twin Tunnel" among others, and also to put forward subjects required to be further studied in this connection in the future as follows: 1) To make a new economical design model for closely neighbored twin tunnel not only to make a drain for center perfect but also a tunnel construction safe. 2) Further efforts should be exerted for establishment of general standards for design and construction of various types of large cross-section tunnels including Twin structure.

  • PDF

터널 붕괴사례로 부터의 기술적 교훈 (Technical lessons learnt from the case history of tunnel collapses)

  • 신휴성;권영철;배규진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.835-844
    • /
    • 2009
  • In this study, a database composed by 46 cases of tunnel collapses has been built up. Based on the database, comprehensive data analysis is carried out, providing us a number of the technical lessons, which can be considered in future design and construction to minimize possibility of tunnel collapse disaster. For making a better understanding, the technical lessons are given in two divisions: mountain tunnel and urban tunnel. Tunnel collapses taking place in the former tunnel are generally due to bad discontinuity condition of jointed rock mass. Otherwise, urban tunnel has weak condition generally on ground water and weathering of ground. Most of technical comments given in this paper are made based on the cases of tunnel collapses only used in this study, so that the comments seems to be hard to be available to all the tunnelling cases. However, the comment should be valuable technical lessons for tunnel engineers to consider in tunnel design or construction.

  • PDF

터널의 진단자료 DB화에 의한 유지관리 연구 (Study on the Maintenance and Management using DB Program of Inspection Data for Tunnel)

  • 이송;심민보
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.503-510
    • /
    • 2000
  • Recently, many kinds of research has been actively developing for a standardization and information related to the construction works. These works include the general field of design, construction, supervision, maintenance and management on facilities. The works of database construction for a standardization and information were chiefly propelled centering around the present conditions related to the design, construction work. The field related to maintenance and management on facilities lags behind in the works of database construction. The establishment of standard classification system(SCS) on facilities and inspection data is most important among the things related to maintenance and management to have a efficiently maintenance and management. This paper suggests SCS on facilities and inspection data according to that of facilities. On the basis of SCS of facilities and inspection data, code work with classification system and input work for a data of maintenance and management was practised. The purpose of this paper is to suggest a kind of statistics data and investigate a characteristics of inspection using statistic data on tunnel structures

  • PDF

국제 터널 시공 정보 교류 방안에 관한 연구 (Development of International Tunnel Construction Information Sharing System)

  • 김창용;김광염;백승한;홍성완;배규진;이영주
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.1267-1274
    • /
    • 2005
  • The system which can manage and analyse the tunnel information in design and construction stage was developed through several years' research named ITIS(Intelligent Tunnel Information System). Now, the system is being modified and improved for the use of international tunnel construction information sharing. Some countries have their own management system for tunnel construction, and one of them, called DEST(Data Evaluation System for Tunneling), is adopted for the international cooperation for this research of development. The aimed system is operated under world wide web environment.

  • PDF

시추공 및 누두공 발파자료의 터널설계 적용 (Tunnel Blasting Design with Equations Obtained from Borehole and Crater Blasting)

  • 양형식;임성식;김원범
    • 한국지반공학회논문집
    • /
    • 제19권5호
    • /
    • pp.327-333
    • /
    • 2003
  • 터널 및 지하공동 설계에 이용된 23개 지역의 578개의 시추공발파 진동 data와 시공 중인 일반터널의 4개 지역으로부터 221개 진동 data를 이용, 시추공발파의 진동전달 특성을 분석하였다. 시추공발파와 일반터널발파의 진동속도 감쇠 경향을 비교 분석한 결과 시추공발파의 입지상수들이 크게 나타났다. 환산거리가 클 때 최대 허용장약량은 시추공발파의 식으로 계산한 것이 더 적었다. 주진동수에 대한 주파수 분석결과 시추공발파는 30∼60Hz, 일반터널발파는 60∼90Hz로 나타났다. 이러한 결과로부터 시추공발파 자료를 터널발파 설계에 직접 사용하는데 다소의 문제가 있는 것으로 판단되며 보다 정확한 설계를 위하여 통계적 처리가 불가피할 것으로 보인다.

3차원 레이저 스캐너를 활용한 터널 시공관리 (The construction management of tunnel using 3D laser scanner)

  • 이강현;허인욱;김도훈;이인모
    • 한국터널지하공간학회 논문집
    • /
    • 제13권3호
    • /
    • pp.159-176
    • /
    • 2011
  • 현재 3차원 레이저 스캐너는 게임, 영화, 의료, 미술, 디자인 분야 등 다양한 분야에서 널리 사용되고 있다. 토목분야에서는 교량 및 터널에 3차원 레이저 스캐너를 이용한 시공관리 방안 및 적용에 관한 연구가 다수 수행되었다. 그러나 3차원 레이저 스캐너로 얻어진 데이터의 용량이 너무 크고 우리나라 현장 실정에 적합한 소프트웨어가 없는 것이 현실이다. 따라서 본 연구에서는 3차원 레이저 스캐너의 데이터를 신속하게 처리할 수 있도록 데이터베이스를 구축하였으며, 터널의 미굴 여굴 여부 판단, 균열 누수 백태를 확인할 수 있는 소프트웨어를 개발하였다. 또한 실제 터널 현장에 3차원 레이저 스캐너를 사용하여 3차원 레이저 스캐너와 소프트웨어를 검증하였다. 이는 터널 시공 중 시공관리 및 시공 후 유지관리에도 기여할 수 있을 것으로 예상된다.

국내 재래식 터널의 변상현황과 배면공동 보강 사례연구 (A Case Study on Deformation Conditions and Reinforcement Method of Cavity behind the Lining of Domestic Old Tunnel)

  • 김영묵;임광수;마상준
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.1343-1350
    • /
    • 2005
  • In this study, the whole deformation conditions of domestic old tunnels and reinforcement methods for deformation tunnels were investigated and analysed, and the present conditions, occurrence cause and reinforcement methods of cavity behind the tunnel lining were investigated and analysed comprehensively. The deformation causes of domestic old tunnels could be classified in three kinds : change of earth pressure operating tunnel ground, material problem of concrete lining, mistake of design and construction. As a result of analysis, the tunnel deformation was occurred by not specific cause but various cause As a result of investigation for 455 domestic tunnel data, more than 70% of the tunnel deformation was related to leakage and the other deformation cause also accompanied leakage mostly. An applied reinforcement method was related to leakage and flood prevention measures, but application of reinforcement method for boundary area between tunnel and ground and tunnel periphery which influence on the tunnel stability was still defective. The cavity of domestic old tunnel occupied about 16% of the total tunnel length and about 68% of cavity was located in the crown of tunnel, and besides, the occurrence cause of cavity was analysed to design, construction and management cause. The filling method for cavity using filling material was comprehensively appling to cavity behind tunnel lining.

  • PDF