• Title/Summary/Keyword: Tunnel Stability Estimation

Search Result 70, Processing Time 0.031 seconds

A Study on the Behaviour Modes of the Face and Unsupported Span for Weak Rock Tunnel (연암터널의 막장 및 무지보 구간의 거동형태에 관한 연구)

  • Lee, Young-Zoo;Kim, Chang-Yong;Kim, Kwang-Yeom;Schubert, Wulf
    • Tunnel and Underground Space
    • /
    • v.17 no.1 s.66
    • /
    • pp.9-16
    • /
    • 2007
  • The influence of round length on the tunnel stability and construction cost is well acknowledged by many researchers and engineers but the coherent procedure is not available for its determination. In this study, the behaviour modes of the face and unsupported span was investigated for weak rock tunnel by a small scale model test, PFC3D and FDM analyses in consideration of the round length. Total five types of behaviour modes are defined and quantitative estimation of the behaviour modes was established in terms of the safety factor for the face stability and the conditional chart. Although the proposed method has some restrictions, this method can provide useful information for the optimization of the round length and excavation, especially in design stage.

Model Test of Lining for Estimation of Tunnel Soundness (터널 건전도 평가를 위한 라이닝 모델실험)

  • Kim, Young Keun
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.2
    • /
    • pp.59-71
    • /
    • 1999
  • Recently, many deformations in tunnel such as crack and leakage were occulted. Specially, the defects of tunnel lining have been a serious problem in safety and stability many repair works for maintenance in tunnel have been carried out. Therefore, it is necessary to estimate the structural cracking for countermeasure in deformed tunnel and to investigate on the characteristics of lining system and the soundness of tunnel. In this study model tests for tunnel lining were carried out using test apparatus and centrifuge, In the direct loading test, the prototype was Kyungbu high-speed railway tunnel and the scale is 1/10, and lining models were made of concrete. Test conditions included load conditions such as direction, shape and type, lining conditions such as single and double lining, thickness, and reinforcement. In centrifuge model test, the prototype was Seoul subway tunnel and the scale is 1/100, and lining models were made of aluminum and hydrostone. Test conditions included tunnel defects such as thickness shortage. behind cavity and longitudinal cracks, reinforcement methods such as epoxy, grouting and carbon sheet. From these model tests , the characteristics of deformation and failure for tunnel lining were estimated, and the structural behaviors of deformed lining and the effects of repair and reinforcement for tunnel lining were researched.

  • PDF

A Case on Excavation Plan and Design of Adjacent Railroad Tunnel (근접 철도터널의 굴착계획 및 설계 사례)

  • 김선홍;정동호;석진호;정건웅;서성호
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.59-71
    • /
    • 2002
  • The points of this design case are the planning and excavation method of a new double-tracked railroad tunnel which is approx. 11∼22 meters apart from existing single-tracked railroad tunnel. For the optimum excavation method some needs are required in design stage, such as the reduction of noise and vibration, public resentment, damage of buildings and construction costs. Hence the estimation and application of allowable noise and vibration criterion is important. The ground coefficient (K, n) of this site is determined by field trial blasting. The excavation method is chosen to satisfy the allowable noise and vibration criterion. In addition, in order to ensure the stability of existing single-tracked railroad tunnel, the instrumentation of maintenance level is accompanied during the construction stage. As a result of this design condition, central diaphragm excavation with line drilling and pre-large hole boring blasting is applied to the area within 15 meters apart from existing tunnel. And above 15 meters apart, pre-large hole boring blasting is designed.

Tunnel Behavior According to the Pillar Width (터널의 필러부 폭에 따른 터널거동)

  • Kim, Youngsu;Kwon, Taesoon;Jeong, Ilhan;Kim, Kwangil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.15-23
    • /
    • 2009
  • This research area is a greate section of triple tunnels that passes through the fault fractured zone the in the granite area. In this area, tunnel section, pillar width and overburden height are changed consecutively due to declivity of 1 : 4.5 and slope formation of upper part as changed section. That is, stability estimation for each section varying pillar width can be conducted because tunnel diameter changes gradually from 0.5D to 1.0D according to distance of pillar width. We have estimated the stability of pillar width in triple tunnels with monitoring value, and compared the stability with results of numerical analysis.

  • PDF

A Study on the Estimation of the Structural Stability of a Container Crane According to the Change of the Boom Shape using Wind Tunnel Test

  • Lee, Seong-Wook;Han, Dong-Seop;Han, Geun-Jo;Kim, Tae-Hyung
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.10a
    • /
    • pp.87-94
    • /
    • 2006
  • In this study we carried out to analyze the effect of wind load on the structural stability of a container crane according to the change of the boom shape using wind tunnel test and provided a container crane designer with data which can be used in a wind resistance design of a container crane assuming that a wind load at 75m/s wind velocity is applied on a container crane. Data acquisition conditions for this experiment were established in accordance with the similarity. The scale of a container crane dimension, wind velocity and time were chosen as 1/200, 1/13.3 and 1/15. And this experiment was implemented in an Eiffel type atmospheric boundary-layer wind tunnel with $11.52m^2$ cross-section area. Each directional drag and overturning moment coefficients were investigated and uplift forces at each supporting point due to the wind load were analyzed.

  • PDF

Lateral Stability/Control Derivatives Estimation of Canard Type Airplane form Flight Test

  • Hwang, Myoung-Shin;Eun, Hee-Bong;Park, Wook-Je;Kim, Yeong-Cheol;Seong, Ki-Jeong;Kim, Eung-tae;Lee, Jong-won
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.167.1-167
    • /
    • 2001
  • Although computational-fluid-dynamic methods and wind-tunnel testing can provide data about the aerodynamic characteristics of an aircraft, the determination of these and other characteristics from flight data plays and important role. The object of this study is the verification of overall aircraft system performance to improve the stability of vehicle. We have test the Velocity-173, canard-type airplane to obtain the stability data. We adopt the two identifications method, EKF and MLE, for the parameter estimation. The results are compared with those of conventional type airplane.

  • PDF

Stability Estimation of the Pillar between Twin Tunnels Considering Various Site Conditions (다양한 현장조건을 고려한 병설터널 필라의 안정성평가)

  • Kim, Ju-Hwan;Kim, Jong-Woo
    • Tunnel and Underground Space
    • /
    • v.27 no.2
    • /
    • pp.109-119
    • /
    • 2017
  • A lot of twin tunnels were modelled with different pillar widths, rock mass classes and stress ratios in order to consider various site conditions, and the stabilities of the pillars were estimated by numerical analyses and scaled model tests. The strength-stress ratios of the pillar were obtained from three different methods which were using the stresses appeared at the middle point, the whole average and the left/right edges of the pillar. The strength-stress ratio of the pillar edges showed relatively conservative values among them, and it was also practically consistent with the tunnel excavating steps comprising the construction sequence analyses which included the partial excavation and the support system. Scaled model tests were also performed to investigate the tunnel stability, where it was found that cracks were progressively generated from the pillar edges toward the middle point of the pillar. Therefore, in order to both prevent the local damage of pillar and conservatively estimate the tunnel stability, it was thought to be an appropriate method using the strength-stress ratio obtained from the left/right edges of the pillar.

DEA optimization for operating tunnel back analysis (운영 중 터널 역해석을 위한 차분진화 알고리즘 최적화)

  • An, Joon-Sang;Kim, Byung-Chan;Moon, Hyun-Koo;Song, Ki-Il;Su, Guo-Shao
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.2
    • /
    • pp.183-193
    • /
    • 2016
  • Estimation of the stability of an operating tunnel through a back analysis is a difficult concept to analyze. Specially, when a relatively thick lining is constructed as in case of a subsea tunnel, there will be a limit to the use of displacement-based tunnel back analysis because the corresponding displacement is too small. In this study, DEA is adopted for tunnel back analysis and the feasibility of DEA for back analysis is evaluated. It is implemented in the finite difference code FLAC3D using its built-in FISH language. In addition, the stability of a tunnel lining will be evaluated from the development of displacement-based algorithm and its expanded algorithm with conformity of several parameters such as stress measurements.

A Case Study on the Application of Safely Analysis for the Tunnel Adjacent to the Pier (교각에 근접한 터널의 안정성 평가에 대한 사례 연구)

  • 이선복;윤지선
    • Tunnel and Underground Space
    • /
    • v.13 no.2
    • /
    • pp.77-86
    • /
    • 2003
  • The finite element method and statistics of the convergence measurement are useful method of the stability analysis of the tunnel adjacent to the pier. It is the purpose of the this case study to certificate of validity of the application of those methods. The safety of the pilot tunnel method and LW pre-grouting has been evaluated from the FEM analysis. The three-dimensional finite element method is carried out for the decision of the level of stress redistribution at the two-dimensional numerical analysis. An analysis of the convergence is carried out by the estimation of preceding convergence at tunnel excavation. F-examination is applied for this estimation. As results of that analysis, The F-value is from 10.81 to 158.74 and the coefficient of determination is from 0.82 to 0.99. An analysis of convergence is carried out by using regression analysis. Consequently, it is shown that the convergence can be modeled as following function C(t)=a[1-exp(-bt)].

A Study on Determination of the Optimum Round Length for Weak Rock Tunnel (연암터널의 최적 굴진장 결정에 관한 연구)

  • Lee, Young-Zoo;Kim, Chang-Yong;Kim, Kwang-Yeom;Lee, Sung-Won;Schubert, Wulf
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.3
    • /
    • pp.219-225
    • /
    • 2006
  • Although the round length for tunnel excavation has a major technical and economical impact in conventional tunnelling, there is no coherent procedure available for its determination. In this study, the influence of round length on the behaviour modes of weak rock tunnel was investigated by numerical analyses. Quantitative estimation of the behaviour modes of the face and the unsupported span was established by use of the safety factor for the face stability and the conditional chart. In addition, the optimum round length in the tunnel design stage was investigated based on the detail construction information such as cycle time and material costs. Although this proposed method has some restrictions, it is expected to provide useful information for the optimization of the tunnel excavation, especially in design stage.