PURPOSES : This study is to suggest tunnel length to spray curing compound, based on the field tests. METHODS : At first field test, length from the entrance of tunnel to wet wall was checked by visual survey. The second and third test, various sensors were installed in concrete or in tunnel, such as RH sensor, temperature sensor, portable weather station and etc.. And also, test for bleeding and retaining water of concrete were conducted to evaluate environmental effect on concrete pavement. RESULTS : The result of the field experiment for tunnel length to spray curing compound indicates that length changes depending on tunnel length, season, and location. Environmental condition of a short tunnel was not much different between location near entrance and at center of tunnel. However, in case of a medium and long tunnel, effect of outside environmental condition decreased, when location moved into tunnel center of it. CONCLUSIONS : From the testing results, it can be proposed that optimum tunnel length to spray curing compound is 60m for a medium and long tunnel, and whole length for a short tunnel.
Theoretical study has been conducted to clarify pressure characteristics of KTX (Korea Train eXpress) in tunnel. The severe pressure change in tunnel may give rise to the ear-discomfort for passenger and fatigue for car body. Critical tunnel lengths which are induced by x-t diagram analysis can be applied to the experimental results measured by using the running test with atmospheric pressure sensors and portable data acquisition system in previous study. In this study, the tunnels from 200m to 4000m in length have been chosen for the investigation of tunnel length effects. We found that there are similar patterns of external pressure change for each critical tunnel length. The critical tunnel lengths are governed by train speed, train length and sonic velocity. And, the patterns of pressure wave in tunnel are classified into eight groups.
토사지반에서 얕은 터널을 굴착하는 경우, 터널 막장부의 파괴 메카니즘이 터널 안정성에 큰 영향을 미친다. 본 논문에서는 일련의 굴진장을 고려한 2차원 종 방향 터널 모형 실험을수행하였다. 그 결과 얕은 터널의 파괴 메카니즘은 굴진장이 길어질수록 파괴모드 1에서 파괴모드 2로 변하는 것을 알 수 있었다. 또한, 모형실험결과와 수치해석을 비교하여 터널에 작용하는 최소 지보압과 진행성 파괴 거동에 대하여 분석하였다.
Wanchun Chen;Lixian Tang;Haijun Zhao;Qian Yin;Shuang Dong;Jie Liu;Zhaohan Zhu;Xiaodong Ni
Geomechanics and Engineering
/
제34권2호
/
pp.115-124
/
2023
By conducting three-dimensional simulation with consideration of small-strain characteristics of soil stiffness, the effects of excavation geometry and tunnel cover to diameter ratio on deformation mechanisms of an existing tunnel located either at a side of basement or directly underneath the basement were systematically studied. Field measurements were used to verify the numerical model and model parameters. For basement excavated at a side of an existing tunnel, the maximum settlement and horizontal displacement of the tunnel are always observed at the tunnel springline closer to basement and tunnel crown, respectively, regardless of basement geometry. By increasing basement length and width by five times, the maximum movements of tunnel located at the side of basement and directly underneath the basement increase by 450% and 186%, respectively. Obviously, tunnel movements are more sensitive to basement length rather than basement width. For basement excavated at a side of an existing tunnel, tunnel movements at basement centerline become stable when basement length reaches 10 He (i.e., final excavation depth). Moreover, tunnel heaves due to overlying basement excavation become stable when the normalized basement length (L/He) is larger than 8.0. As tunnel cover to diameter ratio varies from 2.5 to 3.0, the maximum heave and tensile strain of tunnel due to overlying basement excavation decrease by up to 41.0% and 44.5%, respectively. If basement length is less than 8 He, the assumption of plane strain condition of basement-tunnel interaction grossly overestimates tunnel movements, and ignores tensile strain of tunnel along its longitudinal direction. Thus, three-dimensional numerical analyses are required to obtain a reasonable estimation of tunnel responses due to adjacent and overlying basement excavations in clay.
Background: We conducted this study to determine the optimal length of patellar and tibial bone blocks for the modified transtibial (TT) technique in anterior cruciate ligament (ACL) reconstruction using the bone-patellar tendon-bone (BPTB) graft. Methods: The current single-center, retrospective study was conducted in a total of 64 patients with an ACL tear who underwent surgery at our medical institution between March 2015 and February 2016. After harvesting the BPTB graft, we measured its length and that of the patellar tendon, patellar bone block, and tibial bone block using the arthroscopic ruler and double-checked measurements using a length gauge. Outcome measures included the length of tibial and femoral tunnels, inter-tunnel distance, length of the BPTB graft, patellar tendon, patellar bone block, and tibial bone block and graft-tunnel length mismatch. The total length of tunnels was defined as the sum of the length of the tibial tunnel, inter-tunnel distance and length of the femoral tunnel. Furthermore, the optimal length of the bone block was calculated as (the total length of tunnels - the length of the patellar tendon) / 2. We analyzed correlations of outcome measures with the height and body mass index of the patients. Results: There were 44 males (68.7%) and 20 females (31.3%) with a mean age of 31.8 years (range, 17 to 65 years). ACL reconstruction was performed on the left knee in 34 patients (53%) and on the right knee in 30 patients (47%). The optimal length of bone block was 21.7 mm (range, 19.5 to 23.5 mm). When the length of femoral tunnel was assumed as 25 mm and 30 mm, the optimal length of bone block was calculated as 19.6 mm (range, 17 to 21.5 mm) and 22.1 mm (range, 19.5 to 24 mm), respectively. On linear regression analysis, patients' height had a significant correlation with the length of tibial tunnel (p = 0.003), inter-tunnel distance (p = 0.014), and length of patellar tendon (p < 0.001). Conclusions: Our results indicate that it would be mandatory to determine the optimal length of tibial tunnel in the modified TT technique for ACL reconstruction using the BPTB graft. Further large-scale, multi-center studies are warranted to establish our results.
터널 화재시 정체차량에 의한 정체길이가 터널연장을 초과할 경우, 환기저항의 증가에 따른 제연설비 용량의 증가가 발생하게 된다. 그러나 현행 방재지침에는 정체길이에 대한 정의가 없기 때문에 합리적 산출식의 제시가 필요하다. 본 연구에서는 터널 화재시 정체차량 대수에 의한 정체길이의 산정식을 제시하고, 터널연장별 적용성 분석을 수행하였다. 일반적인 터널의 경우, 화재시 정체길이의 과도한 적용을 방지하기 위해서는 터널연장 1,200 m 까지는 정체길이와 터널연장과의 상호비교가 필요한 것으로 분석되었고, 모델터널에 대한 적용성 평가결과 제연용 제트팬의 절감효과가 있는 것으로 분석되었다. 더불어 정체길이의 판별여부를 대형차혼입률과 터널연장의 관계로 설명할 수 있는 정량화 선도를 제시하였다. 결과적으로 제연설비 용량결정시, 정체차량에 의한 정체길이가 터널연장을 초과하는 경우에는 터널연장을 초과하는 차량대수는 차량에 의한 환기저항 산정에서 제외하는 것이 타당한 것으로 분석된다.
목 적 : 각 환자의 슬개건 길이, 터널간 길이, 경골 터널 길이, 경골 골편의 길이를 측정하여 이식물과 터널 길이의 부조화를 예방하는 수기를 찾고자 하였다. 대상 및 방법 : 1997년 3월부터 1999년 6월까지 골-슬개건-골을 이용하여 전방십자인대 재건술을 시행 받았던 환자 15례를 대상으로 하였다. 수술시 Tibial Tunnel Guide의 각도는 $40^{\circ}$(Acufex, MA, USA)로 고정하였으며, 터널간 길이(X), 경골 터널 길이(T), 슬개건 길이(N), 경골 골편 길이(Y)를 측정하였다. 대퇴골 터널 길이(F)와 슬개골 골편 길이(P)는 공히 25mm로 일치시켰다. 터널 길이 부조화를 예방하기 위해 임의적으로 조절이 용이한 경골 골편의 길이는 경골 터널 길이와 터널간 길이를 합하여 슬개건 길이를 뺀 단순 공식(Y=X+T-N)으로 계산하였다. 결 과 : 대상환자에게 측정한 지표들의 평균값은 터널간 길이(X) $23.4{\pm}1.4mm$, 경골 터널 길이(T) $43.6{\pm}1.7mm$, 슬개건 길이(N) $40{\pm}2.4mm$, 경골 골편 길이(Y) $27{\pm}2.4mm$였다. 결 론 : 저자들의 방법은 터널의 총길이를 측정한 후 이식물의 총길이를 경골 골편 길이로 조정함으로써 경골터널 내에서의 이식물-터널 길이 부조화를 방지할 수 있었다.
Theoretical study has been conducted to clarify pressure characteristics of KTX(Korea Train eXpress) in tunnel. The severe pressure change in tunnel may give rise to the ear-discomfort for passenger and fatigue for car body. The external and internal pressure of rolling stock have been measured by using the running test with atmospheric pressure sensors and portable data acquisition system in high speed train. In this study, the tunnels from 200m to 4000m in length have been chosen for the investigation of tunnel length effects. We found that there are similar patterns of external pressure change for each critical tunnel length. The critical tunnel lengths are governed by train speed, train length and sonic velocity. And, the patterns of pressure wave in tunnel are classified into eight groups.
Three wind-tunnel simulations of the atmospheric boundary layer (ABL) flow in suburban country exposure were generated for length scale factors 1:400, 1:250 and 1:220 to investigate scale effects in wind-tunnel simulations of the suburban ABL, to address recommended wind characteristics for suburban exposures reported in international standards, and to test redesigned experimental hardware. Investigated parameters are mean velocity, turbulence intensity, turbulent Reynolds shear stress, integral length scale of turbulence and power spectral density of velocity fluctuations. Experimental results indicate it is possible to reproduce suburban natural winds in the wind tunnel at different length scales without significant influence of the simulation length scale on airflow characteristics. However, in the wind tunnel it was not possible to reproduce two characteristic phenomena observed in full-scale: dependence of integral length scales on reference wind velocity and a linear increase in integral length scales with height. Furthermore, in international standards there is a considerable scatter of recommended values for suburban wind characteristics. In particular, recommended integral length scales in ESDU 85020 (1985) are significantly larger than in other international standards. Truncated vortex generators applied in this study proved to be successful in part-depth suburban ABL wind-tunnel simulation that yield a novel methodology in studies on wind effects on structures and air pollution dispersion.
본 논문에서는 터널별로 매설된 온도계의 연중계측을 통하여 년 중 온도변화특성과 갱구부로부터의 길이별 온도변화특성, 터널연장별 대기 온도변화특성, 지표부 온도 변화특성을 분석하였다. 터널의 연장별 터널내 바닥부 온도 분포에 대한 분석 결과 입구부와 출구부가 다른 온도분포를 보임을 알 수 있었다. 출구부에서의 터널내 바닥부 표면온도 분포는 출구부에서 50m 지점까지는 온도가 변하다가 50m 이후 깊이에서는 터널연장에 상관없이 거의 일정한 온도분포를 보임을 알 수 있었다. 그러나 입구부에서의 터널내 바닥부 표면온도 분포는 출구부와 달리 터널내 길이 약 125~150m 지점에서 본도분포가 변하고 있음을 알 수 있었다. 이는 입구부로 유입되는 찬공기가 풍향 및 풍속의 영향을 받아 터널깊이 약 125~150m 지점까지 영형을 끼치는 것으로 보인다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.