• Title/Summary/Keyword: Tunnel Drainage

Search Result 121, Processing Time 0.021 seconds

A study on thermal behavior of energy textile by performing in-situ thermal response test and numerical simulation (현장 열응답 시험과 수치해석을 통한 터널에 적용된 에너지 텍스타일의 열적 거동 연구)

  • Lee, Chul-Ho;Park, Moon-Seo;Min, Sun-Hong;Jeoung, Jae-Hyeung;Choi, Hang-Seok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.325-335
    • /
    • 2010
  • A new geothermal energy source obtained from a tunnel structure has been studied in this paper. The geothermal energy is extracted through a textile-type ground heat exchanger named "Energy Textile" that is installed between a shotcrete layer and a guided drainage geotexitle. A test bed was constructed in an abandoned railway tunnel to verify the geothermal heat exchanger system performed by the energy textile. To evaluate the applicability of the energy textile, we measured the thermal conductivity of shotcrete and lining samples which were prepared in accordance with a common mixture design. An overall performance of the energy textile installed in the test bed was evaluated by carrying out a series of in-situ thermal response test. In addition, a 3-D finite volume analysis (FLUENT) was adopted to simulate the operation of the ground heat exchanger being encased in the energy textile with the consideration of the effect of the shotcrete and lining thermal conductivity.

  • PDF

Development of performance assessment criterion for structures of shield TBM tunnel (쉴드 TBM 터널의 구조물 성능 평가 기준 개발)

  • Seong, Joo-Hyun;Lee, Yu-Seok;Hong, Eun-Soo;Byun, Yo-Seph
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.5
    • /
    • pp.553-561
    • /
    • 2015
  • In this study, the performance assessment criterion for reasonable maintenance of shield TBM tunnel was presented. The performance assessment items such as crack, leakage, breakage, spalling, exfoliation/detachment, efflorescence, quality condition, exposure of steel, carbonation, faulting step, bolts condition, drainage condition, ground condition, contact section condition and conduit condition were selected by analyzing domestic and foreign performance assessment criterions and investigating segment lining deterioration cases through the site investigation and in-depth inspection analysis result on the shield TBM tunnel. In addition, the reasonable weight using AHP (Analytic Hierarchy Process) were estimated.

A Case Study on Damage of The Tunnel Lining by Mine Waste Water (긴급제언 - 광산폐수에 의한 터널라이닝 손상사례 연구)

  • Lee, Yu-Seok;Oh, Young-Seok
    • Journal of the Korean Professional Engineers Association
    • /
    • v.45 no.4
    • /
    • pp.47-56
    • /
    • 2012
  • According to the policy of coal industry promotion, a lot of mines were abandoned. As the abandoned mines were neglected, environmental pollution such as settlement of ground, ground-water run-off, landscape damage etc were accompanied around abandoned mines. The government was promoting countermeasures of environmental contamination but most of the Countermeasures were aimed at protecting the ecological system not infrastructure. For this reason, abandoned mines impact on infrastructure has been relatively neglected. Most mines are located in mountainous so there is a tunnel among typical infrastructure around abandoned mines. In this paper, the effect of Mine drainage, Typical pollution source of abandoned mine, was introduced into the using tunnel focusing on the types and examples.

  • PDF

Study on Pollutant Characteristics of Tunnel Cleaning Wastewater and Removal Characteristics of the Pollutants via Settling and Adsorption (터널 세척 폐수 특성 및 분리.흡착 방식에 따른 오염물질 저감 연구)

  • Park, Sang-Woo;Choi, Young-Hwa;Oh, Je-Ill
    • International Journal of Highway Engineering
    • /
    • v.9 no.3
    • /
    • pp.75-82
    • /
    • 2007
  • Washed wastewater generated from the intermittent cleaning process of the three tunnel sites located in the Seoul area showed high concentrations of SS, $COD_{Cr}$, T-N, $NH_3-N$, $NO_3-N$, Zn, Cu, Cr(+6), Mn, Mg, Phenol, $CN^-$ and E-Coli based on the water quality analysis. These characteristics of the deteriorative wastewater depend on the sampling method, cleaning frequency, released amount of washing water, inner material of tunnel wall, traffic volume, and type of drainage systems. Gravitational separation experiment of SS with collected tunnel wastewater showed considerable removal of pollutants such as 80% of $COD_{Cr}$, 30% of T-N and 90% of T-P simultaneously. GAC isotherm test was conducted to remove dissolved portion of the pollutants, and resulted in high removal efficiencies above 80% of $COD_{Cr}$, T-N, Zn, Cu, Mn, Phenol, CN in the experimental condition of GAC dosage of $50g/1/{\ell}$.

  • PDF

Evaluation of Drainage System and Coupled Analysis of Heat Transfer and Water Flow for Ice Ring formation in Daejeon LNG Pilot Cavern (대전 LNG Pilot Cavern에서의 배수시스템 평가 및 Ice Ring 형성에 관한 냉열수리 연동해석)

  • Jeong Woo-Cheol;Lee Hee-Suk;Lee Dae-Hyuck;Kim Ho-Yeong;Choi Young-Tae
    • Tunnel and Underground Space
    • /
    • v.16 no.1 s.60
    • /
    • pp.38-49
    • /
    • 2006
  • LNG storage in lined rock cavern demands various techniques concerned with rock mechanics, thermo-mechanics and hydrogeology in design, construction and maintenance stage. LNG pilot cavern was constructed in Daejeon in order to verify these techniques. In this paper, evaluation of drainage system and ice ring formation was studied by numerical simulation. By Modflow analysis in the viewpoint of aquifer and Seep/W analysis in the viewpoint of flow system, it was verified that the drainage system in the pilot cavern was efficiently operated. Since ice ring formation can be simulated by interactive relation between heat transfer and water flow, coupled analysis of those was performed. In this analysis, the position of ice ring was presumed and it was demonstrated that the formation is affected by velocity and direction of groundwater flow.

Evaluation of Groundwater Flow by Gravel-Filling and Temporary Drainage in Groundwater-saturated Limestone Mine Cavities (지하수 포화 석회석 채굴공동에서의 골재 충전 및 임시배수시 발생하는 지하수 유동 평가)

  • Choi, Woo-Seok;Kang, Byung-Chun;Kim, Eun-Sup;Shin, Dong-Choon
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.205-216
    • /
    • 2017
  • Fluctuations in groundwater level are the major cause of ground subsidence in the abandoned limestone mine. In this study, evaluation of groundwater flow under three different cases of natural condition, aggregate-filling, temporary drainage in groundwater-saturated limestone mine cavities was executed by 3-dimensional analysis. In the case of aggregate-filling, although the water level both in the upper ground of mine cavities and an agricultural watershed was elevated, it was lower than the water level fluctuation of an agricultural water use and rainfall and the flow rate was similar to the flow rate of natural condition. In the case of temporary drainage, as the water level in the upper ground of mine cavities and an agricultural watershed decrease rapidly and the flow rate has increased by 25times, so the risk of ground subsidence increased.

Analysis and Design of Soft Ground Tunnels Subject to Steady-State Groundwater Flow (정상류 조건하의 토사터널의 해석 및 설계)

  • Lee, In-Mo;Nam, Seok-Woo;Lee, Myung-Jae
    • Geotechnical Engineering
    • /
    • v.10 no.2
    • /
    • pp.41-56
    • /
    • 1994
  • Under the groundwater level, the tunnel face is affected by the seepage force and the groundwater flow may cause a trouble to the tunnel support systems. The appropriate methods of analysis and design in the tunnel face and the lining, considering groundwater flow according to tunnel drainage condition are presented in this thesis. First, the effect of seepage on the stability of tunnel face was studied. Seepage force was estimated by the 3-D finite element analysis and the stability of tunnel face was checked by analytical method. Furthermore, using the finite difference method the stress and displacement on the face were computed for either case, where the seepage force is or is not considered, and the effect of seepage on the tunnel face stability was evaluated. Second, the effect of seepage force on the tunnel lining when construction is finished and steady state seepage flow occurs was studied and a design methodology considering seepage effect was made. Consequently, in case where the groundwater level remains almost unchanged and the steady state groundwater flow occurs, the proper countermeasures for face staility are required according to the condition of groundwater flow. Moreover, the tunnel lining should be designed and constructed considering the seepage force occuring by the groundwater flow toward the tunnel linings.

  • PDF

A study on hydraulic behaviour and leakage control of segment linings using the numerical method (수치해석을 이용한 세그먼트라이닝의 수리거동과 누수제어 연구)

  • Shin, Jong-Ho;Shin, Yong-Suk;Pam, Dong-In;Chae, Sung-Elm;Choi, Kyu-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.2
    • /
    • pp.131-140
    • /
    • 2009
  • It has been repeatedly reported that a drainage system of a drained tunnel is deteriorated. And consequently the water pressure on the lining increases with time. However, little research on the watertight tunnel was found in the literatures. According to field measurements, leakage of the undrained tunnel has increased with time, which is completely opposite to the behavior of the drained tunnel. It is evident that the hydraulic deterioration of the tunnel lining changes the water pressure on the lining and the amount of leakage, thus the design coneept in terms of groundwater is not maintained tightly throughout the life time of the tunnel. The Segment lining is generally constructed as watertight. However, it is frequently reported that the leakage in the segment tunnel increases with time. It is also reported that the leakage is generally concentrated at the joints of the segments. In this study structural and hydraulic interaetion of the segment lining due to the hydraulic deterioration of the segments and the joints is investigated using the numerical modeling method. An electric utility tunnel below groundwater table is considered for the analyses. The effects of hydraulic deterioration of the segment lining are identified in terms of ground loading, water pressure and lining behavior. A remedial grouting measure for leakage is also numerically simulated, and its appropriateness is evaluated.

Prediction of transverse settlement trough considering the combined effects of excavation and groundwater depression

  • Kim, Jonguk;Kim, Jungjoo;Lee, Jaekook;Yoo, Hankyu
    • Geomechanics and Engineering
    • /
    • v.15 no.3
    • /
    • pp.851-859
    • /
    • 2018
  • There are two primary causes of the ground movement due to tunnelling in urban areas; firstly the lost ground and secondly the groundwater depression during construction. The groundwater depression was usually not considered as a cause of settlement in previous research works. The main purpose of this study is to analyze the combined effect of these two phenomena on the transverse settlement trough. Centrifuge model tests and numerical analysis were primarily selected as the methodology. The characteristics of settlement trough were analyzed by performing centrifuge model tests where acceleration reached up to 80g condition. Two different types of tunnel models of 180 mm diameter were prepared in order to match the prototype of a large tunnel of 14.4 m diameter. A volume loss model was made to simulate the excavation procedure at different volume loss and a drainage tunnel model was made to simulate the reduction in pore pressure distribution. Numerical analysis was performed using FLAC 2D program in order to analyze the effects of various groundwater depression values on the settlement trough. Unconfined fluid flow condition was selected to develop the phreatic surface and groundwater level on the surface. The settlement troughs obtained in the results were investigated according to the combined effect of excavation and groundwater depression. Subsequently, a new curve is suggested to consider elastic settlement in the modified Gaussian curve. The results show that the effects of groundwater depression are considerable as the settlement trough gets deeper and wider compared to the trough obtained only due to excavation. The relationships of maximum settlement and infection point with the reduced pore pressure at tunnel centerline are also suggested.

Usefulness of an Additional Mattress Suture for the Extracranial Drainage Catheter

  • Eom, Dong Woong;Kim, Jung Soo;Jeon, Kyoung Dong;Kim, Hoon;Choi, Byeong Sam
    • Journal of Korean Neurosurgical Society
    • /
    • v.54 no.5
    • /
    • pp.444-447
    • /
    • 2013
  • In most intracranial surgery cases, a drain catheter is inserted to prevent the collection of the wound hematoma or seroma. A drain catheter is also inserted to drain the hematoma or the cerebrospinal fluid. The drain catheter itself does not cause complications; but many complications occur during its removal, such as hematoma, seroma, air collection and pseudomeningocele formation. To prevent these complications, neurosurgeons perform a suture on the catheter to remove the site. In this study, an additional horizontal mattress suture and an anchoring suture to the drainage catheter are proposed. This method maintains negative pressure in the catheter insertion site during the catheter removal, compresses the catheter tunnel site and attaches the external wounds strongly. The technique is easy and safe to perform, and does not require an additional suture to remove the catheter.