• 제목/요약/키워드: Tunnel

검색결과 8,772건 처리시간 0.035초

한계해석법에 의한 파일-지반-터널 상호작용 해석 (Upper and Lower Bound Solutions for Pile-Soil-Tunnel Interaction)

  • 이용주;신종호
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.77-86
    • /
    • 2005
  • In urban areas, new tunnel construction work is often taking place adjacent to existing piled foundations. In this case, careful assessment for the pile-soil-tunnel interaction is required. However, research on this topic has not been much reported, and currently only limited information is available. In this study, the complex pile-soil-tunnel interaction is investigated using the upper and lower bound methods based on kinematically possible failure mechanism and statically admissible stress field respectively. It is believed that the limit theorem is useful in understanding the complicated interaction behaviour mechanism and applicable to the pile-soil-tunnel interaction problem. The results are compared with numerical analysis. The material deformation patterns and strain data from the FE output are shown to compare well with the equivalent physical model tests. Admissible stress fields and the failure mechanisms are presented and used to develop upper and lower bound solutions to assess minimum support pressures within the tunnel.

  • PDF

재래식 터널 변상 조사 사례 및 안전성 평가에 관한 연구 (A study on the evaluation of tunnel safety through a series of field inspection for ASSM tunnel)

  • 박시현;맹두영;이유석;김영호
    • 한국터널지하공간학회 논문집
    • /
    • 제6권2호
    • /
    • pp.151-160
    • /
    • 2004
  • 본 연구는 국내 재래식 철도 터널에서 발생한 아치부 종방향 균열 부위에 대하여 각종 현장조사를 실시하여 터널의 변상상태를 파악한 것이다. 현장 외관조사 및 각종 비파괴 조사를 통하여 균열 부위에 대한 상세한 조사를 실시하였으며 현장조사 결과를 토대로 균열의 발생 원인을 추정하였다. 아울러 현장여건을 고려한 안전성 해석을 실시하여 터널 구조물의 균열 발생 가능성을 검토하였다.

  • PDF

300km/h급 고속철도의 터널 미기압파 저감을 위한 슬릿후드의 실험적 연구 (Experimental study on the alleviation of micro-pressure waves radiated from the tunnel exit with the slit hoods on the high-speed train operations of 300km/h)

  • 김동현;민동호
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2000년도 춘계학술대회논문집B
    • /
    • pp.619-624
    • /
    • 2000
  • The purpose of present study is to investigate for reducing micro pressure waves generated according to train speeds $(240km/h{\sim}380km/h)$ through tunnels with countermeasures as followings; the hood configuration in tunnel entrance. We developed hoods for tunnel of 0.5 km length in the condition of tunnel cross-section area of $107m^2$ on the slab track. According to the results the maximum micro-pressure wave is reduced by 41.2% for the slit hood installed at the entrance of the tunnel and reduced by 47.7% for the slit hood installed at the entrance of the tunnel and the $45^{\circ}$ slanted portal at the exit of the tunnel

  • PDF

터널 화재시 터널 단면의 종횡비에 따른 연기 거동에 관한 (An Experimental Study of Smoke Movement in Tunnel Fires with Aspect Ratio of Tunnel Cross Section)

  • 이성룡;유홍선;김충익
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 추계학술대회
    • /
    • pp.115-120
    • /
    • 2003
  • In this study, smoke movement in tunnel fires was investigated with various aspect ratio(0.5, 0.667, 1.0, 1.5, 2.0) of tunnel cross section. Reduced-scale experiments were carried out under the Froude scaling using 8.27 kW ethanol pool fire. Temperatures were measured under the ceiling and vertical direction along the center of the tunnel. Smoke front velocity and temperature decrease rate were reduced as higher aspect ratio of the tunnel cross-section. Smoke movement was evaluated by analysis of vertical temperature distribution 3 m downstream from the fire source. Elevation of smoke interface according to N percent rule was under about 60% of tunnel height.

  • PDF

터널 일산화탄소 농도 제어를 위한 직렬 제어 알고리즘 (A Cascade Control Algorithm for the CO Level Control of a Long Road Tunnel)

  • 한도영;윤진원
    • 설비공학논문집
    • /
    • 제17권2호
    • /
    • pp.147-155
    • /
    • 2005
  • For a long road tunnel, a tunnel ventilation system may be used in order to reduce the pollution level below the required level. To control the tunnel pollution level, a closed loop control algorithm may be used. The cascade control algorithm, which composed of a jet fan control algorithm and an air velocity setpoint algorithm, was developed to regulate the CO level in a tunnel. The verification of control algorithms was carried out by dynamic models developed from real tunnel data sets. The simulation results showed that control algorithms developed for this study were effective to control the tunnel ventilation system.

터널을 포함한 전기비저항탐사 2차원 모델링 (2D Resistivity Modeling Including Tunnel)

  • 경규하;조인기;김기주;정재형;배규진;안희윤;김기석
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2007년도 공동학술대회 논문집
    • /
    • pp.179-184
    • /
    • 2007
  • The electrical resistivity method has been widely used for the efficient maintenance of tunnel. In this case, the main purpose of the survey is to find out resistivity distribution around the tunnel. However, resistivity data are severely distorted by the tunnel, which make it hard to detect anomalous zones developed around the tunnel. In this study, using the finite element modeling, we analyze resistivity data distorted by the tunnel. Finally, we propose a simple method to correct the tunnel effect.

  • PDF

시뮬레이터를 이용한 장대터널 내에서의 운전자 특성 연구 (A Study on Driver's Characteristics in Long Tunnel Using Driving Simulator)

  • 박형진;황경주;신현주
    • 대한인간공학회지
    • /
    • 제26권2호
    • /
    • pp.89-102
    • /
    • 2007
  • Generally, it is well known that driving in tunnel imposes large burden to driver because of spatial constraint, limited visual field and so on. And such a burden of driver result in high accident occurrence. In this reason, studies dealing with features of driving and traffic flow in tunnel have been performed. However, information about characteristics of drivers and traffic in a very long tunnel is not accumulated yet. The purpose of this study is to identify the relations between tunnel length and burden of driver, driving patterns, traffic flow characteristics using the tunnel simulator that realizing various tunnel situations. For this, the tunnel simulation program was developed along 11km-length section. And biological data of 10 subjects gained from driving condition in simulation program was analyzed and compared with the result of real driving condition.

Change of groundwater inflow by cutoff grouting thickness and permeability coefficient

  • Kim, Youngsang;Moon, Joon-Shik
    • Geomechanics and Engineering
    • /
    • 제21권2호
    • /
    • pp.165-170
    • /
    • 2020
  • The groundwater during tunnel excavation not only affects the stability of the tunnel and constructability but also causes the subsidence of the upper ground due to the lowering of groundwater. Generally, the cutoff grouting is applied as a countermeasure to reduce the groundwater inflow during tunnel excavation, and the cutoff grouting is often applied in the range of plastic zone around the tunnel. However, grouting in the plastic zone is only appropriate for ground reinforcement purposes, and guidelines for the application range of cutoff grouting and the targeted permeability coefficient of the grouting zone are required. In this study, the relationship between groundwater inflow into tunnel and application range of cutoff grouting and permeability coefficient is proposed and compared with numerical analysis results. It was found that grouting with tunnel radius thickness is appropriate to reduce the groundwater inflows effectively. More than 90% reduction in groundwater inflow can be achieved when the annular area of the tunnel radius thickness is grouted with a permeability reduction ratio of 1/50~1/200.

3차원 가시화 기법을 이용한 터널설계 (3D Visualization Technique Based Tunnel Design)

  • 홍성완;배규진;김창용;서용석;김광염
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.759-766
    • /
    • 2002
  • In the paper the authors describe the development of ITIS(Intelligent Tunneling Information System) for the Purpose of applying the 3D visualization technique, GIS, AI(Artificial Intelligence) to tunnel design and construction. VR(Virtual Reality) and 3D visualization techniques are applied in order to develope the 3D model of characteristics and structures of ground and rock mass. Database for all the materials related to site investigation and tunnel construction is developed using GIS technique. AI technique such as fuzzy theory and neural network is applied to predict ground settlement, decide tunnel support method and estimate ground and rock mass properties according to tunnel excavation steps. ITIS can help to inform various necessary tunnel information to engineers quickly and manage tunnel using acquired information based on D/B.

  • PDF

터널 조명 제어장치의 성능개선 (Improvement of Lighting Control System for Tunnel)

  • 어익수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 C
    • /
    • pp.1964-1966
    • /
    • 2003
  • Lighting in the tunnel makes for safe driving of cars taking into account of change in perception arisen in the sight of drivers of cars entering into and passing tunnel, drivers' mental reaction and unique circumstances of a tunnel. There are many variables to satisfy safe driving in the tunnel. Since tunnels are mostly located in the mountainous area and illumination at the approach part differs largely depending on the surrounding circumstances, a standard different from that of common lighting is applied. An accidentin the tunnel, which involves same danger as in underground, may lead to a large mishap. Therefore, control by sensors inside and outside of tunnel ensures prevention of an accident through control of illumination at the approach part and inside of tunnel. It is very important in the aspect of saving energy since such control is available to reduce depreciation factor resulted from early excessive intensity of illumination.

  • PDF