• Title/Summary/Keyword: Travel Time

Search Result 1,583, Processing Time 0.027 seconds

The Study on Determination of Benefit Factor as Constructing Traffic Facilities Using ANP (ANP기법을 이용한 교통시설 건설사업의 편익항목 선정에 관한 연구)

  • Kim, Man Kyeong;Jung, Hun Young;Lee, Sang Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.41-47
    • /
    • 2006
  • The construction of traffic facilities has generated a variety of problems in the equality and efficiency when it would be planed and evaluated. One of the reasons for these phenomena isn't the definition of an objective standard about benefit items. Thus, results of evaluation couldn't give a demonstration of confidence. But, the traffic facility construction and its operation costs are securely appeared. Therefor, it will be demonstrated to decide the benefit items in this study. Before deciding the items, user's satisfaction evaluation and economic analysis would be carried. We find out subway user's satisfaction higher than load traffic mode user in satisfaction evaluation, while subway's economic feasibility is lower than load facility, as a result of B/C analysis. In this inconsistent results, we found out that the benefit value is a little lower because of indefinite standard of it's items as comparing Busan Metropolitan City's population with subway's modal split ratio. Accordingly, we enumerate some benefit items in the case of feasibility evaluation as constructing traffic facility. And each of evaluation items' weight is estimated by using ANP. We found out that the weight value of accessibility has the highest one, that of punctuality has second, that of travel time has third, and benefit items according to improvement of user's traffic condition have much more important than those which were considered in the existence economic analysis.

Evaluation of Near Subsurface 2D Vs Distribution Map using SPT-Uphole Tomography Method (SPT-업홀 토모그래피 기법을 이용한 지반의 2차원 전단파 속도 분포의 도출)

  • Bang, Eun-Seok;Kim, Jong-Tae;Kim, Dong-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3C
    • /
    • pp.143-155
    • /
    • 2006
  • SPT-Uphole tomography method was introduced for the evaluation of near subsurface shear wave velocity (Vs) distribution map. In SPT-Uphole method, SPT (Standard Penetration Test) which is common in geotechnical site investigation was used as a source and several surface geophones in line were used as receivers. Vs distribution map which is the triangular shape around the boring point can be developed by tomography inversion. To obtain the exact travel time information of shear wave component, a procedure using the magnitude summation of vertical and horizontal components was used based on the evaluation of particle motion at the surface. It was verified that proposed method could give reliable Vs distribution map through the numerical study using the FEM (Finite Element Method) model. Finally, SPT-Uphole tomography method was performed at the weathered soil site where several boring data with SPT-N values are available, and the feasibility of proposed method was verified in the field.

Prioritization of Intermodal Transportation Facilities with Considering the Budget Rate Constraints of Focal Terminal Types (교통물류거점유형별 예산비율을 고려한 연계교통시설 투자우선순위 분석)

  • Oh, Seichang;Lee, Jungwoo;Lee, Kyujin;Choi, Keechoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.361-368
    • /
    • 2010
  • It is general that mostly congested sections of national backbone networks have been improved based on the national network expansion plan. However, in case of intermodal terminals which are origins of logistics, it is still so congested that travel time between origin and destination is long. Therefore, intermodal transportation systems plan of major intermodal terminals for the intermodal connector networks between intermodal terminal and national backbone network or intermodal terminal was established. With the limitation of priority methodology applying to intermodal connector facility under existing methodology, this study suggests an improved priority methodology. This study includes characteristics of terminal on the hierarchical structure and assessment list, but it does not concentrate on the specific terminal type through survey. To avoid a certain concentration, budget constraint for each terminal type was considered ahead of priority. Finally priority methodology was developed with two-step assessment under consideration that specific terminal is not involved in intermodal connector facility project. As a result of calculating weights by survey, effects such as d/c and accessibility fluctuations index through project implementation gain high weight, and degree of region underdevelopment gets next. Although the methodology in this study could not yields the priority by assessment list, it will be useful for setting the direction on policy related to intermodal connector facility projects.

A Study on Factors that Improve Waterfront Satisfaction: Targeting Residents of Apartment Houses in the Tokyo's Coastal Area (수변 만족도를 향상시키는 요인에 관한 연구: 도쿄 임해지역 집합주택 거주자를 대상으로)

  • Joohong Kim;Sekyung Oh
    • Land and Housing Review
    • /
    • v.15 no.1
    • /
    • pp.117-134
    • /
    • 2024
  • This study examines the factors contributing to waterfront satisfaction among different generations, utilizing a survey on the use and perception of waterfront areas by residents of apartment houses in Tokyo's coastal region. The variables used in this study are developed through a review of existing literature, focusing on factors related to waterfront usage. Specifically, we select the proximity to the waterfront, duration of stay at the waterfront, and frequency of visits to the waterfront as key variables for investigation. In addition, the study further incorporates aspects related to waterfront recognition, such as the space, user behavior, and management status of the waterfront. Utilizing these variables, we carry out a correlation analysis to investigate the association between generational use and perception of the waterfront and their satisfaction with water-related experiences. The results identify three key factors to enhance waterfront satisfaction: First, to increase visits from both younger and older generations, improving pedestrian access to the waterfront is essential. Second, for middle-aged and older generations, creating waterfront areas closer to their residences can reduce travel distance and time, encouraging more frequent use. Third, maintaining clean and well-kept waterfront spaces is fundamental for all generations to enjoy relaxing experiences, thereby improving overall satisfaction.

An Analysis into the Characteristics of the High-pass Transportation Data and Information Processing Measures on Urban Roads (도시부도로에서의 하이패스 교통자료 특성분석 및 정보가공방안)

  • Jung, Min-Chul;Kim, Young-Chan;Kim, Dong-Hyo
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.10 no.6
    • /
    • pp.74-83
    • /
    • 2011
  • The high-pass transportation information system directly collects section information by using probe cars and therefore can offer more reliable information to drivers. However, because the running condition and features of probe cars and statistical processing methods affect the reliability of the information and particularly because the section travel time is greatly influenced by whether there has been delay by signals on urban roads or not, there can be much deviation among the collected individual probe data. Accordingly, researches in multilateral directions are necessary in order to enhance the credibility of the section information. Yet, the precedent studies related to high-pass information provision have been conducted on the highway sections with the feature of continuous flow, which has a limit to be applied to the urban roads with the transportational feature of an interrupted flow. Therefore, this research aims at analyzing the features of high-pass transportation data on urban roads and finding a proper processing method. When the characteristics of the high-pass data on urban roads collected from RSE were analyzed by using a time-space diagram, the collected data was proved to have a certain pattern according to the arriving cars' waiting for signals with the period of the signaling cycle of the finish node. Moreover, the number of waiting for signals and the time of waiting caused the deviation in the collected data, and it was bigger in traffic jam. The analysis result showed that it was because the increased number of waiting for signals in traffic jam caused the deviation to be offset partially. The analysis result shows that it is appropriate to use the mean of this collected data of high-pass on urban roads as its representative value to reflect the transportational features by waiting for signals, and the standard of judgment of delay and congestion needs to be changed depending on the features of signals and roads. The results of this research are expected to be the foundation stone to improve the reliability of high-pass information on urban roads.

A Integrated Model of Land/Transportation System

  • 이상용
    • Proceedings of the KOR-KST Conference
    • /
    • 1995.12a
    • /
    • pp.45-73
    • /
    • 1995
  • The current paper presents a system dynamics model which can generate the land use anq transportation system performance simultaneously is proposed. The model system consists of 7 submodels (population, migration of population, household, job growth-employment-land availability, housing development, travel demand, and traffic congestion level), and each of them is designed based on the causality functions and feedback loop structure between a large number of physical, socio-economic, and policy variables. The important advantages of the system dynamics model are as follows. First, the model can address the complex interactions between land use and transportation system performance dynamically. Therefore, it can be an effective tool for evaluating the time-by-time effect of a policy over time horizons. Secondly, the system dynamics model is not relied on the assumption of equilibrium state of urban systems as in conventional models since it determines the state of model components directly through dynamic system simulation. Thirdly, the system dynamics model is very flexible in reflecting new features, such as a policy, a new phenomenon which has not existed in the past, a special event, or a useful concept from other methodology, since it consists of a lots of separated equations. In Chapter I, II, and III, overall approach and structure of the model system are discussed with causal-loop diagrams and major equations. In Chapter V _, the performance of the developed model is applied to the analysis of the impact of highway capacity expansion on land use for the area of Montgomery County, MD. The year-by-year impacts of highway capacity expansion on congestion level and land use are analyzed with some possible scenarios for the highway capacity expansion. This is a first comprehensive attempt to use dynamic system simulation modeling in simultaneous treatment of land use and transportation system interactions. The model structure is not very elaborate mainly due to the problem of the availability of behavioral data, but the model performance results indicate that the proposed approach can be a promising one in dealing comprehensively with complicated urban land use/transportation system.

  • PDF

Estimation of Economic Impact on the Air Transport Industry based on the Volcanic Ash Dispersion Scenario of Mt. Baekdu (백두산 화산재 확산 시나리오에 따른 항공산업의 경제적 피해 예측)

  • Kim, Su-Do;Lee, Yeonjeong;Yoon, Seong-Min
    • Journal of International Area Studies (JIAS)
    • /
    • v.18 no.3
    • /
    • pp.109-144
    • /
    • 2014
  • In 2010, large areas of European airspace were closed by the volcanic ash generated by the eruption of Icelandic volcano and it disrupted global trade, business and travel which caused a huge economic damage on the air transport industry. This brought concerned about the economic impact by the eruption of Mt. Baekdu volcano. In this paper, we analyze the affected areas of the air transport industry were decided by calculating the PM10 density of volcanic ash changed over time and by determining the safe upper limit of ash density in their airspace. We separate the sales in the air transport industry according to each airline, airport, and month to estimate the direct losses when all flights inside a restricted zone were canceled. Also, we estimate the indirect losses in regional output, income, and value-added of the different major industries using interindustry (input-output) analysis. There is no direct damage from VEI 1 to VEI 5. But when VEI is 6, all flights to and from Yangyang airport will be canceled due to the No Fly Zone. And some flights to and from the airports Gimhae, Ulsan and Pohang will be restricted due to the Time Limited Zone. When VEI is 7, Yangyang, Gimhae, Ulsan, Pohang and Daegu airports will be closed and all flights will be canceled and delayed. During this time, the total economic losses on the air transport industry are estimated at 8.1 billion won(direct losses of about 3.55 billion won, indirect losses of about 4.57 billion won). Gimhae international airport accounted for 92% of the total loss and is the most affected area according to the volcanic ash scenario of Mt. Baekdu.

Distribution and Population Dynamics of Korean Endangered Species; Hipparchia autonoe (Lepidoptera: Nymphalidae) on Mt. Hallasan, Jeju Island, Korea (한국산 멸종위기종 산굴뚝나비(나비목, 네발나비과)의 분포와 개체군 동태)

  • Kim, Do-Sung;Cho, Young-Bok;Kim, Dong-Soon;Lee, Yeong-Don;Park, Seong-Joon;Ahn, Nung-Ho
    • Korean Journal of Environment and Ecology
    • /
    • v.28 no.5
    • /
    • pp.550-558
    • /
    • 2014
  • This study was conducted to investigate the distribution and the population dynamics of Hipparchia autonoe by using a line transect and Mark-Release-Recapture (MRR) at the Mt. Halla in Jeju Island. The results showed that H. autonoe was found from 1,500 m above the sea level. Total 1,493 H. autonoe with 978 males and 515 females were captured and released in the MRR study site. Among them, 518 individuals including 284 males and 234 females were recaptured. The average survival time was 2.31 days with 2.14 days for males and 3.47 days for females, indicating longer survival time in case of females than males. The daily population size of males estimated in the MRR study site was maintained about 1,000 individuals in July and gradually decreased less than 200 in August. The number of females showed peak at 335 individuals on July 24, and gradually decreased less than 120 in August. Thus, female population was 1/3 of males. The average travel distance of male and female H. autonoe were $116.8{\pm}191.9m$ and $118.4{\pm}161.5m$, respectively, indicating almost same between sexes. H. autonoe in the Mt. Halla formed single population group in the wide meadow around the Baekrokdam Lake. The highest population density of H. autonoe was occurred in the restored area from damages, where host plants such as the sheep's fescue or the food plant are abundant by artificial restoration efforts.

Review of 'Nonperformance of Obligation' and 'Culpa in Contrahendo' by Fail to Transport - A Focus on Over-booking from Air Opreator - (여객운송 불이행에 관한 민법 상 채무불이행 책임과 계약체결상의 과실책임 법리에 관한 재검토 - 항공여객운송계약에 있어 항공권 초과판매에 관한 논의를 중심으로 -)

  • Kim, Sung-Mi
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.35 no.2
    • /
    • pp.113-136
    • /
    • 2020
  • Worldwide, so-called 'over-booking' of Air Carriers is established in practice. Although not invalid, despite their current contracts, passengers can be refused boarding, which can hinder travel planning. The Korean Supreme Court ruled that an airline carrier who refused to board a passenger due to over-booking was liable for compensation under the "Nonperformance of obligation". But what the court should be thinking about is when the benefit(transport) have been disabled. Thereforeit may be considered that the impossibility of benefit (Transport) due to the rejection of boarding caused by 'Over-booking' may be not the 'subsequent impossibility', but not the 'initialimpossibility '. The legal relationship due to initial impossibility is nullity (imposibilium nulla est obligation). When benefits are initial impossibile, our civil code recognizes liability for damages in accordance with the law of "Culpa in Contrahendo", not "nonperformance of obligation". On this reason, the conclusion that the consumer will be compensated for the loss of boarding due to overbooking by the Air Carrier is the same, but there is a need to review the legal basis for the responsibility from the other side. However, it doesn't matter whether it is non-performance or Culpa in Contrahendo. Rather, the recognition of this compensation is likely to cause confusion due to unstable contractual relationships between both parties. Even for practices permitted by Air Carriers, modifications to current customary overbooking that consumers must accept unconditionally are necessary. At the same time, if Air Carriers continue to be held liable for non-performance of obligations due to overselling tickets, it can be fatal to the airline business environment that requires overbooking for stable profit margins. Therefore, it would be an appropriate measure for both Air Carriers and passengers if the Air Carrier were to be given a clearer obligation to explain (to the consumer) and, at the same time, if the explanation obligation is fulfilled, the Air Carrier would no longer be forced to take responsibility for overbooking.

Suggestion on the Optimal Length of Long Tunnels Considering Traffic Safety Characteristics (교통안전 특성을 고려한 장대터널 적정길이 제시)

  • Kim, Joong-Hyo;Lee, Jeong-Hwan;Kwon, Sung Dae;Ha, Dong Ik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.203-211
    • /
    • 2014
  • Tunnel reduces travel time as and it is essential facilities for the eco-friendly road construction. In recent years, It has been accelerating the tunnel construction to provide a higher level of traffic service but a driver driving in the narrow and dark tunnel takes characteristically psychological anxiety and the restriction of the sight. Moreover, A driver passing through more than 1,000m long tunnel, as to pass inside the monotonous form of the tunnel for a long time can cause drowsiness and increase the driver load. This driver load can degrade road-holding of the inside of the long tunnel highly and pose a high risk of accidents. Accordingly, In this study is to present the proper length of the Tunnel, considering the characteristics of traffic accident. For this, this study is that the long tunnel that affects traffic safety traffic safety variables are selected and classified. Traffic safety variables are classified in detail as a variable of the traffic accident and velocity one, the applicable variables the number of the traffic accident, the ratio of the traffic accident, driving velocity, the individual vehicle velocity etc. Traffic safety variables are categorized as more than a pole length of the tunnel in order to examine its impact on correlation analysis. The results indicate significant results in traffic accidents in accordance with traffic accidents, traffic safety, selects the variable was Variable depending on the length of the tunnel traffic safety point of significantly increasing the possibility of an accident can be seen as a high point. And the point of the Distribution of selected variables in order to create a traffic safety was a significant increase in traffic safety variables was set at critical intervals. Before reaching the critical point and the corresponding length of the long tunnel was set at the proper length. In this study, the optimum length of the proposed long tunnel through the long tunnel that occur in the future to contribute to reducing traffic accidents would be able to be determined.