• Title/Summary/Keyword: Transportation and installation

Search Result 333, Processing Time 0.023 seconds

Development of Parking Space Forecast Model for Large Traffic-inducing Facilities Considering Surrounding Circumstance (주변 환경을 고려한 대규모 교통유발시설 주차면산정 모형개발에 관한 연구 - 판매시설을 중심으로 -)

  • Park, Je jin;Oh, Seok Jin;Kim, Sung Hun;Ha, Tae Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.3
    • /
    • pp.593-601
    • /
    • 2017
  • With the rapid industrial development and national economic advance since 1970, the national income of Korea has sharply increased. As a result, issues regarding city expansion, urban concentration, increase in the number of registered motor vehicles, and increase in traffic have caused transportation issues such as traffic congestion and problems with parking. Especially, enforcement ordinances and rules have been established on installation and management of parking lots to solve problems with parking which are raised as social problems such as conflict with neighbors but the flexible calculation of legal parking space has the limitations because of the diversity and complex functionality of purposes of facilities. Accordingly, this study attempted to supplement such demerit of the parking space demand forecast method based on the legally required number of parking spaces and average unit requirement in the parking space supply. This study estimated the required number of parking spaces by analyzing existing literature, collecting field research data, and analyzing the factors that have an impact on the parking demand. Also, it compared the required number of parking spaces based on the average unit requirement as well as the required number of parking spaces by the forecast model based on the cumulative number of motor vehicles parked. The result was that the required number of parking space based on average unit requirement was less than the cumulative number of motor vehicles parked by 9.99%. Meanwhile, the required number of parking spaces by the forecast model was more than the cumulative number of motor vehicles parked by 4.37%. Therefore, it is believed that the parking space forecast model is more efficient than the others in estimating there quired parking space. The parking space forecast model of this study consider different environmental factors to enable practical parking demand forecast considering the local characteristics and thus supply the parking space in an efficient way.

A Prediction Model for the Radiation Safety Management Behavior of Medical Cyclotrons (의료용 Cyclotron의 방사선안전관리 행위 예측모형)

  • Jung, Ji-Hye;Han, Eun-Ok;Kim, Ssang-Tae
    • Journal of Radiation Protection and Research
    • /
    • v.33 no.2
    • /
    • pp.77-86
    • /
    • 2008
  • This study attempted to provide reference materials for improving the behavior level in radiation safety managements by drawing a prediction model that affects the radiation safety management behavior because the radiation safety management of medical Cyclotrons, which can be used to produce radioisotopes, is an important factor that protects radiation caused diseases not only for radiological operators but average users. In addition, this study obtained follows results through the investigation applied from January 2 to January 30, 2008 for the radiation safety managers employed in 24 authorized organizations, which have already installed Cyclotrons, through applying a specific form of questionnaire in which the validity was guaranteed by reference study, site investigation, and focus discussion by related experts. The radiation safety management were configured as seven steps: Step 1 is a production preparation step, Step 2 is an RI production step, Step 3 is a synthesis step, Step 4 is a distribution step, Step 5 is a quality control step, Step 6 is a carriage container packing step, and Step 7 is a transportation step. it was recognized that the distribution step was the most exposed as 15 subjects (62.5%), the items of 'the sanction and permission related works' and 'the guarantee of installation facilities and production equipments' were the most difficult as 9 subjects (37.5%), and In the trouble steps in such exposure, the item of 'the synthesis and distribution' steps were 4 times, respectively (30.8%). In the score of the behavior level in radiation safety managements, the minimum and maximum scores were 2.42 and 4.00, respectively, and the average score was $3.46{\pm}0.47$ out of 4. Prosperity and well-being programs in the behavior and job in radiation safety managements (r=0.529) represented a significant correlation statistically. In the drawing of a prediction model based on the factors that affected the behavior in radiation safety managements, general characteristics, organization characteristics, and selfefficacy didn't show a significant path statistically in which the prosperity and well-being programs in job characteristics affected the behavior in radiation safety managements. Therefore, it is necessary to establish a strategy that improves the level of prosperity and well-being levels in job characteristics in order to increase the behavior in radiation safety managements. Thus, this study provides basic materials for the radiation safety management of Cyclotron through the full-scale investigation that is first applied in Korea.

Installation Standards of Urban Deep Road Tunnel Fire Safety Facilities (도심부 대심도 터널의 방재시설 설치 기준에 관한 연구(부산 승학터널 사례를 중심으로))

  • Lee, Soobeom;Kim, JeongHyun;Kim, Jungsik;Kim, Dohoon;Lim, Joonbum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.6
    • /
    • pp.727-736
    • /
    • 2021
  • Road tunnel lengths are increasing. Some 1,300 tunnels with 1,102 km in length had been increased till 2019 from 2010. There are 64 tunnels over 3,000 m in length, with their total length adding up to 276.7 km. Safety facilities in the event of a tunnel fire are critical so as to prevent large-scale casualties. Standards for installing disaster prevention facilities are being proposed based on the guidelines of the Ministry of Land, Infrastructure and Transport, but they may be limited to deep underground tunnels. This study was undertaken to provide guidelines for the spacing of evacuation connection passages and the widths of evacuation connection doors. Evacuation with various spacing and widths was simulated in regards to evacuation time, which is the measure of safety, using the evacuation analysis simulation software EXODUS Ver.6.3 and the fire/smoke analysis software SMARTFIRE Ver.4.1. Evacuation connection gates with widths of 0.9 m and 1.2 m, and spacings of 150 m to 250 m, were set to every 20 m. In addition, longitudinal slopes of 6 % and 0 % were considered. It was determined to be safe when the evacuation completion time was shorter than the delay diffusion time. According to the simulation results, all occupants could complete evacuation before smoke spread regardless of the width of the evacuation connection door when the longitudinal slope was 6 % and the interval of evacuation connection passage was 150 m. When the evacuation connection passage spacing was 200 m and the evacuation connection gate width was 1.2 m, all occupants could evacuate when the longitudinal slope was 0 %. Due to difference in evacuation speed according to the longitudinal slope, the evacuation time with a 6 % slope was 114 seconds shorter (with the 190 m connection passage) than with a 0 % slope. A shorter spacing of evacuation connection passages may reduce the evacuation time, but this is difficult to implement in practice because of economic and structural limitations. If the width of the evacuation junction is 1.2 m, occupants could evacuate faster than with a 0.9 m width. When the width of a connection door is 1.2 m with appropriate connection passage spacing, it might provide a means to increase economic efficiency and resolve structural limitations while securing evacuation safety.