• Title/Summary/Keyword: Transport Infrastructure

Search Result 784, Processing Time 0.026 seconds

Comparative Analysis of Seawater Desalination Technology in Korea and Overseas (국내 및 해외의 해수담수화 기술 비교분석)

  • Hwang, Moon-Hyun;Kim, In S.
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.38 no.5
    • /
    • pp.255-268
    • /
    • 2016
  • Climate change has increased the need to secure a new water resource in addition to the traditional water resources such as surface water and ground water. The seawater desalination market is growing sharply in accordance with this situation in Korea, "seawater engineering & architecture of high efficiency reverse osmosis (SEAHERO)" program was launched in 2007 to keep pace with world market trend. SEAHERO program was completed in 2014, contributed to turn the domestic technology in evaporative desalination technology to RO desalination technology. Currently, it is investigated that the average specific energy consumption of the whole RO plant is around $3.5kWh/m^3$. The Busan Gi-jang plant has shown $3.7{\sim}4.0kWh/m^3$, including operational electricity for plant and maintenance building. Although not world top level, domestic RO technology is considered to be able to compete in desalination market. Separately, many researchers in the world are developing new technologies for energy savings. Various processes, forward osmosis (FO), membrane distillation (MD) process are expected to compete with RO in the future market. In Korea, FO-RO hybrid process, MD and pressure retarded osmosis (PRO) process are under development through the research program in Ministry of Land, Infrastructure and Transport (MOLIT). The desalination technology level is expected to decrease to $2.5kWh/m^3$.

Study on Utilization Drones in Domestic Logistics Service in Korea (한국내 물류서비스에 드론 활용을 위한 연구)

  • Kang, Ki-Seog;Jeon, In-Oh
    • Journal of Distribution Science
    • /
    • v.14 no.5
    • /
    • pp.51-57
    • /
    • 2016
  • Purpose - In the year of 2015 and 2016, one of the items that got attention in CES was a drone. It has been 100 years since a drone emerged, but most were used for military purposes. As its use became diverse as of 2010, it got attention of the general public. In Korea, it was in 2011 that a drone was known to the public through an aerial video shooting for television program. This study tried to come up with suggestions by comparing domestic with overseas cases, and tried to consider the related technologies and systems with applying the role of drones in logistics service. Research design, data, and methodology - The overseas cases were regarded as drone's logistical purpose. The Prime Air service by US Amazon is still not commercialized and under pre-testing due to Federal Aviation Regulations, although it started in 2013. In Germany, DHL succeeded in delivering service testing which is called Parcelcopter, but it is not commercialized yet. Other than these, there are more attempts to prepare logistics service in China with Taobao, in France with Geopost's test, and in Africa. In Korea, CJ Korea Express tested delivery with a self-developed drone Results - In order to study for utilizing drones for logistics as the prerequisites, some overseas and domestic cases, which are currently considered, were reviewed. Also, the technologies and institutional requirements to commercialize drones for logistical purpose were reviewed. The reasons for using drones in logistics is to ensure the price competitiveness by reducing cost. The empirical test also will be needed because drone pilot areas are designated by ministry of land, infrastructure and transport. Conclusions - In order to utilize drones in logistics and foster the industry, this study would like to suggest the followings. First of all, size of drones for logistics needs to be fixed and their operating system should be standardized. Centralized investment resources are needed through standardization to ensure the market occupancy. Secondly, it is necessary to get the converged businesses that do research, develop and commercialize drones with the investment of private sector. Example can be found in Korea aerospace Industries. We can respond to the rapid growth of the market with intensive investing by integrating the private sector investment. Thirdly, institutional arrangements are needed to be established quickly. In the case of high-technologies like drones, institutional support often does not follow the rapid development of the technology. The problems can be found in securing drones-only airspace, creating drone-specialized pilot's license, matters related to remote controller and complementary regulations for drones in Aviation Act. If these regulations are not prepared or complemented at the right timing, technologies cannot be commercialized even though the development is completed. Fourthly, there is a need to secure the transparency regarding possible privacy and personal information protection problem while operating drones. Finally, in order to foster this new industry, government should focus on supporting R&D more in the long term than short term outcomes.

A Study on the Korea Smart City Certification Index and Demonstration Authentication (국내 스마트시티 인증 지표 및 시범 인증에 관한 연구)

  • Han, Sun-Hee;Shin, Young-Seob;Yu, In-Jae;Lee, Jae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.1
    • /
    • pp.688-698
    • /
    • 2018
  • The government has recognized the importance of smart city indicators and prepared the legal grounds for the certification of smart cities in the recently revised "Act on Smart City Development and Industrial Promotion." This study derived smart city indicators adequate for the domestic conditions and compatible with the overseas trends by examining and complementing the indicators through an AHP analysis based on consultations and interviews (surveys) with experts and local government officials, who are actually carrying out related projects. In addition, the adequacy and reliability of the indicators were confirmed by verifying and certifying the Korean local governments' smart city plans through demand surveys on a trial basis. This study is meaningful in that it systematically studies the smart city indicators that have gained in importance and reviews their application. The findings of this study can be used as a basis for implementing a smart cities certification system in the future. Recently, the Special Committee on Smart Cities was established under the Committee for the Fourth Industrial Revolution. This committee is composed of civilian members and is working with the Ministry of Land, Infrastructure, and Transport, the Ministry of Science and ICT, etc., to promote the creation of smart cities. It is expected that smart city indicators that include the levels of both domestic and overseas smart cities will boost the active spread of such cities in Korea.

Usability Evaluation of the Drone LiDAR Data for River Surveying (하천측량을 위한 드론라이다 데이터의 활용성 평가)

  • Park, Joon-Kyu;Um, Dae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.5
    • /
    • pp.592-597
    • /
    • 2020
  • Currently, river survey data is mainly performed by acquiring longitudinal and cross-sectional data of rivers using total stations or the GNSS(Global Navigation Satellite System). There is not much research that addresses the use of LiDAR(Light Detection and Ranging)systems for surveying rivers. This study evaluates the applicability of using LiDAR data for surveying rivers The Ministry of Land, Infrastructure and Transport recently launched a drone-based river fluctuation survey. Pilot survey projects were conducted in major rivers nationwide. Studies related to river surveying were performed using the ground LiDAR(Light Detection And Ranging)system.Accuracy was ensured by extracting the linearity of the object and comparing it with the total station survey performance. Data on trees and other features were extracted to generate three-dimensional geospatial information for the point-cloud data on the ground.Deviations were 0.008~0.048m. and compared with the results of surveying GNSS and the use of drone LiDAR data. Drone LiDAR provided accurate three-dimensional spatial information on the entire target area. It was able to reduce the shaded area caused by the lack of surveying results of the target area. Analyses such as those of area and slope of the target sites are possible. Uses of drones may therefore be anticipated for terrain analyses in the future.

Case study of Civil Engineering BIM Projects: Perspective of Korean Public Owners (토목분야 BIM 적용 사례 분석을 통한 발주자 관점에서의 BIM 발전 전략)

  • Kim, Changyoon;Moon, Hyoun-Seok;Nah, Heu-Suk;Kim, Jin-Uk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7430-7437
    • /
    • 2014
  • Owing to the increase in large and complex construction projects, the design paradigm of architecture and civil engineering projects has changed from 2D CAD to 3D CAD. For this reason, to meet the strong requirements of project contractors, various efforts have been made to adopt a Building Information Modeling (BIM) technology for effective construction management. On the other hand, compared to architectural projects, only a few civil engineering project cases have been conducted in the perspective of public contractors. This is because the characteristics of civil project contractors and the negative pursuit of adopting BIM technology due to the lack of a current BIM system and technologies. Recently, positive changes in adopting BIM technology for public projects were anticipated by public owners, such as the Public Procurement Service and the Ministry of Land, Infrastructure and Transport. In this regard, this study analyzed the current BIM technology status of public owners in Korea to adopt the BIM policies and guidelines of the Korean government. Strategies for adopting BIM technologies for Korean public owners are also discussed based on an analysis of civil engineering BIM project cases.

An experimental study for the effect of soil plug on the basal heave stability for the vertical shaft excavation in clay (점성토 지반 수직구 굴착 중 히빙 안정성 증가에 대한 관내토 효과에 대한 실험적 연구)

  • Kang, Seok-Jun;Cho, Gye-Chun;Kim, Jung-Tae;Cha, Yohan;Hong, Eun-Soo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.183-195
    • /
    • 2018
  • Recently, the need for research on vertical shaft excavation is increasing with the increase of the demands for the underground and utility tunnels. As a part of the R&D project of the Ministry of Land, Infrastructure and Transport, CUT (center for utility tunnel) has developed "Ring cut method". "Ring cut method" is a method to improve the stability of the ground against the basal heave by excavator wall pre-penetration during vertical shaft excavation. In this study, the basal heave was simulated by centrifugal model test. The basal heave, ground subsidence, and ground deformation of surrounding ground were analyzed by soil plug effect from wall pre-penetration. It was found that the soil plug could control the basal heaving and ground subsidence, and verified that the 'Ring cut method' could be a good countermeasure for the ground stability against the basal heave.

Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction (부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구)

  • Lee, Hyobum;Koh, Sung-Yil;Jun, Jonghun;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.59-76
    • /
    • 2020
  • As a continuous increase in demand for the transportation infrastructure in the metropolitan area, the renovation of existing metropolitan and urban railway lines for the rapid transport system requires the construction of sidetrack that can operate local and express trains simultaneously. However, the construction of sidetrack after stopping the operation of the existing subway line causes a lot of economic losses, therefore it is essential to study the tunnel enlargement scheme during the operation of the existing subway tunnel. Accordingly, in this paper, basic research on the enlargement plan of the existing subway tunnel was carried out for the renovation of the existing subway line. In order to investigate the method for the sidetrack construction, the Government Complex Gwacheon station on the Gwacheon line of subway line 4 was selected as a virtual research station. Subsequently, four construction plans including tunnel cross-sectional plan for each section were reviewed and constructability and economic feasibility were compared. Finally, the stability assessment was conducted for the selected construction plan which was considered to be relatively unstable by 3-D full numerical analysis considering the sidetrack construction process.

Application Method of Remote Site Monitoring in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6550-6557
    • /
    • 2013
  • The public road construction projects awarded by the regional construction and management office, which is an affiliate of the Ministry of Land, Infrastructure and Transport, are managed by construction supervision officers. These officials frequently visit a large number of construction sites to conduct inspections and supervision tasks. Therefore, the site management efficiency is essential in terms of the time and money spent in travelling to the sites. The introduction of a site monitoring management system is considered necessary to minimize the number of site visits and enable remote monitoring of the construction progress to enhance the business efficiency of the construction supervision officers. In this study, a remote site monitoring system was constructed using web cameras for public road construction works. The trial applications were implemented by selecting ten constructions sites. The effectiveness of the system was analyzed to assess its applicability. In an assessment of the applicability of the verification results, remote site monitoring showed cost savings of approximately 35% compared to the existing site management. The guidelines for applying the site monitoring management system were provided, the introduction plan was investigated, and the improvement method was presented. The results showed that the system is likely to minimize the unnecessary site visits, remove the risk factors at vulnerable areas in the sites beforehand, and prevent a range of disasters and accidents. In addition, the quality of the infrastructures is likely to improve through the prevention of accidents and the elimination of substandard and faulty construction work.

A Study on the Development of the System for the Road Occupation Permit Information Management (도로점용허가 정보관리를 위한 도로점용시스템 개발에 관한 연구)

  • Kim, Young-Jin;Kim, Byung-Kon;Jeong, Seong-Yun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6495-6503
    • /
    • 2013
  • This paper presents a study on the development of a web-based system for the road occupation permit information management. For the development of this system, the survey of information system related to a road occupation permit, an analysis of road occupation business process, the definition of the road occupation permit data, the development of the system, and the application of the system to the work-related to road occupation permit were conducted consecutively. In an analysis of the road occupation business process, the statutes, such as the road act were investigated, work examples of the road management agent were reviewed, and a survey targeting staff and citizens was carried out. The information classification code to represent the attributes of the data was developed to manage the information in each road occupation permit process, and the metadata was defined considering the hierarchy relationship of the information. The road occupation and access system was developed based on the information classification code and metadata to reflect the user requirements. The System was applied to the Regional Construction and Management Administration and Branch Office belonging to the Ministry of Land, Infrastructure and Transport Affairs. By replacing the business process based on paper documents to the business process based on the information system, it is expected that the service of the civil petition be upgraded and the business process of the road occupation permit be reformed.

A Study on Improvement Measures for the Design Documents Delivery System in Public Road Construction Projects (공공 도로건설사업에서의 설계도서 납품체계 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin;Kim, Tae-Hak;Ju, Ki-Bum
    • International Journal of Highway Engineering
    • /
    • v.20 no.2
    • /
    • pp.45-55
    • /
    • 2018
  • PURPOSES : This study aims to survey and analyze the status of the design and completion documents output delivery system in public construction projects in order to assess the problems of the Ministry of Land, Infrastructure and Transport (MOLIT)'s electronic delivery system, with a focus on roads and rivers, and to offer improvement measures. METHODS : This study first surveys and analyzes laws and existing study trends with regard to the design and completion documents output delivery system in public construction projects. It further analyzes the status of the output delivery system in public construction projects, including roads, rivers, expressways, water resources, and railroads. In addition, a comparative analysis of the current electronic delivery system of MOLIT and Korea Expressway Corporation in the road field is conducted, and the problems and improvement measures for MOLIT's electronic output delivery system are presented. This study seeks to analyze problems and prepare improvement measures with regard to road and river public construction projects, as ordered by MOLIT's five regional offices. RESULTS : This study sought to prepare the electronic output delivery system with regard to public construction projects and present the analysis of its major problems and improvement measures in four categories: "the preparation of electronic design documents output delivery system improvement measures including inspection and delivery," "preparation of guidelines, systems, etc., concerning electronic design documents," "preparation of improvement measures for the construction project management system and electronic design document support tools", and "linking of MOLIT's electronic output delivery system with relevant agencies and the expansion thereof to local governments." CONCLUSIONS : This study analyzed the current status and problems of the MOLIT's electronic output delivery system in the field of road and river construction projects, and presented corresponding improvement measures. This study is expected to address the problems of the MOLIT's electronic output delivery system, and to provide the foundation for the preparation of an efficient electronic output delivery system for design and completion documents. In addition, this study is expected to boost the quality and utilization of the electronic design documents output, and to exchange, share, and link construction information among relevant agencies so as to prepare the foundation for sharing construction information.