• Title/Summary/Keyword: Transmission constraints

Search Result 313, Processing Time 0.033 seconds

Automatic Berthing Finite-time Control Considering Transmission Load Reduction

  • Liu Yang;Im Nam-kyun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2022.11a
    • /
    • pp.168-169
    • /
    • 2022
  • In this study, we investigates the auto-berthing problem for the underactuated surface vessel in the presence of constraints of dynamic uncertainties, finite time, transmission load, and environmental disturbance. A novel control scheme is proposed by fusing the finite time control technology and the event-triggered input algorithm. In the algorithm, differential homeomorphism coordinate the transformation is used to solve the problem of underactuation. Then, we apply the finite time technology and event triggered to save the time of the berthing vessel and relieve transmission burden between the controller and the vessel respectively. Moreover, a radial basis function network is used to approximate unknown nonlinear functions, and minimum learning parameters are introduced to lessen the computational complexity. A sufficient effort has been made to verify the stability of the closed-loop system based on the Lyapunov stability theory. Finally, simulation results display the effectiveness of the proposed scheme.

  • PDF

Implementation of Image Transmission Server System using Embedded Linux (임베디드 리눅스 기반의 영상전송서버 시스템 구현)

  • Jung, Yeon-Sung;Nam, Boo-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.388-390
    • /
    • 2004
  • In this paper, we performed the implementation of image transmission server system using embedded system that is for the specified object and easy to install at any places and move to wherever. Since the embedded system has lower capability than PC, we have to reduce the quantity of calculation and transmission. The image compression like JPEG, needs that the server calculates for making compressed image, makes the server carry the load. So we compresses the image at the server and transmit the codes to the clients connected, then the received codes from server are decoded and displayed at the clients. In this process to make the image compression and transmission effectively, we decrease the procedure as simple as possible to transmit the data in almost real-time. We used the Redhat linux 9.0 OS at the host PC and the target board based on embedded linux. The image sequences are obtained from the camera attached to the FPGA board with ALTERA chip. For effectiveness and avoiding some constraints, we made the device driver. Generally the image transmission server is PC, but using the embedded system as a server makes the server portable and cheaper than the system based on PC.

  • PDF

Half-Scaled Substructure Test of a Transmission Tower Using Actuators (엑츄에이터를 이용한 송전철탑의 1/2 축소부분실험)

  • Moon, Byoung-Wook;Park, Ji-Hun;Lee, Sung-Kyung;Min, Kyung-Won
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.178-188
    • /
    • 2007
  • In this paper, a half-scaled substructure test was performed to evaluate the buckling and structural safety of an existing transmission tower subjected to wind load. A loading scheme was devised to reproduce the dead and wind loads of a prototype transmission tower, which uses a triangular jig that is mounted on the reduced model to which the similarity law of a half length was applied. As a result of the preliminary numerical analysis carried out to evaluate the stability of a specimen for the design load, it was confirmed that the calculated axial forces of tower leg members were distributed to $80{\sim}90%$ of an admissible buckling load. When the substructured transmission tower was loaded by 270% of its maximum admissible buckling load, it was failed due to the local buckling that is occurred in joints with weak constraints for out-of-plane behavior of leg members. By inspection of load-displacement curves, displacements and strains of members, it is considered that this local buckling was due to additional eccentric force by unbalanced deformation because the time that is reached to yielding stress due to the bending moment is different at each point of a same section.

  • PDF

Optimal Design of Automatic Transmission Lever using Genetic Algorithms (유전자 알고리듬을 이용한 자동변속레버의 최적 설계)

  • 서광규
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.4 no.3
    • /
    • pp.242-247
    • /
    • 2003
  • This paper deals with an optimal design methodology for an automatic transmission lever using a genetic algorithm. A component of an automatic transmission lever has been designed sequentially in the industry, but the study presents a new design method to consider the design parameters of components simultaneously. A genetic algorithm approach is described to determine a set of design parameters for an automatic transmission lever. We have attempted to model the design problem with the objective of minimizing the angle variation of detent spring subject to constraints such as modulus of elasticity of steel, geometry of shift pipe. and stiffness of spring. The proposed method can give the better design alternative.

  • PDF

Transmission Rate Decision of Live Video Based on Coding Information (부호화 정보에 기반한 라이브 비디오의 전송률 결정)

  • Lee Myeong-jin
    • Journal of Korea Multimedia Society
    • /
    • v.8 no.9
    • /
    • pp.1216-1226
    • /
    • 2005
  • In this paper, a preventive transmission rate decision algorithm, called PTRD, is proposed for the transmission of live video over networks with dynamic bandwidth allocation capability. Frame analyzer predicts the bit-rates of future frames before encoding by analyzing the source information such as spatial variances and the degree of scene changes. By using the predicted bit-rates, transmission rate bounds are derived from the constraints of encoder and decoder buffers. To resolve the problem of renegotiation cost increment due to frequent renegotiations, the PTRD algorithm is presented to decide transmission rates considering the elapsed time after the recent renegotiation and the perceived video quality. From the simulation results, compared to the normalized LMS based method, PTRD is shown to achieve high channel utilization with low renegotiation cost and no delay violation.

  • PDF

Opportunistic Scheduling and Power Control for Cross-Layer Design of Ad Hoc Networks (Ad Hoc네트워크의 Cross-Layer설계를 위한 Opportunistic Scheduling과 Power Control기법)

  • Casaquite Reizel;Ham Byung-Woon;Hwang Won-Joo
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.31 no.9A
    • /
    • pp.856-867
    • /
    • 2006
  • This paper proposes a new algorithm for opportunistic scheduling that take advantage of both multiuser diversity and power control. Motivated by the multicast RTS and priority-based CTS mechanism of OSMA protocol, we propose an opportunistic packet scheduling with power control scheme based on IEEE 802.11 MAC protocol. The scheduling scheme chooses the best candidate receiver for transmission by considering the SINR at the nodes. This mechanism ensures that the transmission would be successful. The power control algorithm on the other hand, helps reduce interference between links and could maximize spatial reuse of the bandwidth. We then formulate a convex optimization problem for minimizing power consumption and maximizing net utility of the system. We showed that if a transmission power vector satisfying the maximum transmission power and SINR constraints of all nodes exist, then there exists an optimal solution that minimizes overall transmission power and maximizes utility of the system.

Deadbeat and Hierarchical Predictive Control with Space-Vector Modulation for Three-Phase Five-Level Nested Neutral Point Piloted Converters

  • Li, Junjie;Chang, Xiangyu;Yang, Dirui;Liu, Yunlong;Jiang, Jianguo
    • Journal of Power Electronics
    • /
    • v.18 no.6
    • /
    • pp.1791-1804
    • /
    • 2018
  • To achieve a fast dynamic response and to solve the multi-objective control problems of the output currents, capacitor voltages and system constraints, this paper proposes a deadbeat and hierarchical predictive control with space-vector modulation (DB-HPC-SVM) for five-level nested neutral point piloted (NNPP) converters. First, deadbeat control (DBC) is adopted to track the reference currents by calculating the deadbeat reference voltage vector (DB-RVV). After that, all of the candidate switching sequences that synthesize the DB-RVV are obtained by using the fast SVM principle. Furthermore, according to the redundancies of the switch combination and switching sequence, a hierarchical model predictive control (MPC) is presented to select the optimal switch combination (OSC) and optimal switching sequence (OSS). The proposed DB-HPC-SVM maintains the advantages of DBC and SVM, such as fast dynamic response, zero steady-state error and fixed switching frequency, and combines the characteristics of MPC, such as multi-objective control and simple inclusion of constraints. Finally, comparative simulation and experimental results of a five-level NNPP converter verify the correctness of the proposed DB-HPC-SVM.

Energy-Efficient Scheduling with Individual Packet Delay Constraints and Non-Ideal Circuit Power

  • Yinghao, Jin;Jie, Xu;Ling, Qiu
    • Journal of Communications and Networks
    • /
    • v.16 no.1
    • /
    • pp.36-44
    • /
    • 2014
  • Exploiting the energy-delay tradeoff for energy saving is critical for developing green wireless communication systems. In this paper, we investigate the delay-constrained energy-efficient packet transmission. We aim to minimize the energy consumption of multiple randomly arrived packets in an additive white Gaussian noise channel subject to individual packet delay constraints, by taking into account the practical on-off circuit power consumption at the transmitter. First, we consider the offline case, by assuming that the full packet arrival information is known a priori at the transmitter, and formulate the energy minimization problem as a non-convex optimization problem. By exploiting the specific problem structure, we propose an efficient scheduling algorithm to obtain the globally optimal solution. It is shown that the optimal solution consists of two types of scheduling intervals, namely "selected-off" and "always-on" intervals, which correspond to bits-per-joule energy efficiency maximization and "lazy scheduling" rate allocation, respectively. Next, we consider the practical online case where only causal packet arrival information is available. Inspired by the optimal offline solution, we propose a new online scheme. It is shown by simulations that the proposed online scheme has a comparable performance with the optimal offline one and outperforms the design without considering on-off circuit power as well as the other heuristically designed online schemes.

Economic Load Dispatch Considering Power System Reliability under the Deregulated Electricity Market (규제완화된 전력시장 하에서의 전력계통 신뢰도를 고려한 경제부하배분)

  • Kim, Hong-Sik;Lim, Chae-Hyeun;Choi, Jae-Seok;Cha, Jun-Min;Rho, Dae-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.391-393
    • /
    • 2000
  • This paper presents an new algorithm for the economic load dispatch considering the reliability level constraints of composite power system under deregulated electricity market. It is the traditional ELD problem that generation powers have been dispatched In order to minimize total fuel cost subjected to constraints which sum of powers generated must equal the received load and no violating lower and upper limit constraints on generation. Under deregulated electricity market, however, generation powers of a pool have to be reallocated newly in order to satisfy the reliability differentiated level required at a load point because of a reliability differentiated electricity service which is a part of the priority service. In this study, new economic load dispatch algorithm for reallocating the generation powers of a pool in order to satisfy the reliability differentiated level under deregulated competitive electricity market is proposed. The uncertainties of not only generators but also transmission lines are considered fer the reliability evaluation. The characteristics and effectiveness of this methodology are illustrated by the case studies on MRBTS and IEEE-RTS.

  • PDF

A Data Gathering Approach for Wireless Sensor Network with Quadrotor-based Mobile Sink Node

  • Chen, Jianxin;Chen, Yuanyuan;Zhou, Liang;Du, Yuelin
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.6 no.10
    • /
    • pp.2529-2547
    • /
    • 2012
  • In this paper, we use a quadrotor-based mobile sink to gather sensor data from the terrestrial deployed wireless sensor network. By analyzing the flight features of the mobile sink node, we theoretically study the flight constraints of height, velocity, and trajectory of the mobile sink node so as to communicate with the terrestrial wireless sensor network. Moreover, we analyze the data amount which the mobile sink can send when it satisfies these flight constraints. Based on these analysis results, we propose a data acquisition approach for the mobile sink node, which is discussed detailed in terms of network performance such as the transmission delay, packet loss rate, sojourning time and mobile trajectory when given the flying speed and height of the mobile sink node. Extensive simulation results validate the efficiency of the proposed scheme.