• 제목/요약/키워드: Transformer Inrush Current

검색결과 80건 처리시간 0.025초

Fuzzy Logic Based Relaying Using Flux-differential Current Derivative Cure for Power Transformer Protection

  • 권명현;박철원;서희석;이복구;신명철
    • 한국지능시스템학회논문지
    • /
    • 제8권5호
    • /
    • pp.72-82
    • /
    • 1998
  • Power transformer protective relay should block the tripping during magnetizing imrush and rapidly operate the tripping during internal faults. But traditional approaches maloperate in the case of magnetizing inrush with low second harmonic component and internal faults with high second harmounic component. To enhance the fault detection sensitivities of conventional technuques, flux-differential current derivative curve by fuzzy theory approaches is used. This paper deals with fuzzy logic based protective relaying for power transformer. The proposed fuzzy based relaying algorithm consisits of flux-differential current derivative curve, harmonics restraint, and precentage differential characteristic curv. The proposed relaying was tested with relaying signals obtained from Salford EMTP simulation package and showed a fast and accurate trip operation.

  • PDF

비선형 자화특성을 고려한 3상 변압기 보호용 전류차동 계전방식 (A Current Differential Relaying Algorithm for Three-Phase Transformer Considering the Nonlinear Magnetization Characteristics of the Core)

  • 강용철;김은숙;원성호;임의재;강상희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.320-322
    • /
    • 2003
  • This paper describes a current differential relaying algorithm for a three-phase transformer considering the nonlinear magnetization characteristics of the core. The iron-loss current is obtained from the calculated induced voltage and the core-loss resistance. The magnetizing current is calculated from the estimated core flux and the magnetization curve. The proposed algorithm uses the modified differential current, which is obtained by subtracting the iron-loss current and the magnetizing current from the conventional differential current. The various test results show that the algorithm can discriminate internal fault from magnetic inrush, overexcitation and an external fault.

  • PDF

웨이브렛 변환기반 뉴로-퍼지를 이용한 변압기 보호계전 알고리즘 (Transformer Protective Relaying Algorithm Using Neuro-Fuzzy based on Wavelet Transform)

  • 이명윤;이종범;홍동석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.607-609
    • /
    • 2004
  • A breakdown occurred in power transformer causes interruption of power transmission. Protective relay should be installed in transformer to detect such a fault. Protective relaying algorithm for transformer must be included a function to discriminate between winding fault and inrushing state. Recently, current differential relay is widely used to protect power transformer. However if inrush occurs in transformer, relay can be tripped by judging as internal fault. New algorithms are required in order to such problem. This study proposes a new protective relaying algorithm using Neuro-Fuzzy inference and wavelet. A variety of transformer transient states are simulated by BCTRAN and HYSDT in EMTP. D1 coefficients of differential current are obtained by wavelet transform. D1 coefficients and RMS of 3-phase primary voltage are used to make a target data and are trained by Nwo-Fuzzy algorithm which distinguishes correctly whether internal fault occurs or not within 1/2 after fault detection. It is evaluated that the results obtained by simulations can effectively protect a transformer by contact discriminating between winding fault and inrushing state.

  • PDF

축소형 교류급전시스템 절연구간 자동절체장치 성능시험 (Test results of small scale changeover system using in neutral section for AC feeding system)

  • 장동욱;한문섭
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.948-953
    • /
    • 2011
  • In AC railway feeding system, three phase received from the network is changed to two phase power sources with different phases. The main circuit breaker installed train is automatically open by track signal when the train passes the neutral section. In order to continuously supply power source to train, the changeover system was used in Japan. Therefore, the train is able to operate under powering condition when it was passing through the neutral section. We investigated the control method to reduce the inrush current flowing main transformer in train. To examine the inrush current and operate the static semiconductor switch such as thyristor, we manufactured the small scale the changeover system and carried out performance tests.

  • PDF

전압, 전류 변화 추이를 이용한 전력용 변압기 보호계전 알고리즘 (A New Protective Relaying Algorithm for Power Transformer Based on Three Phase Voltage and Current)

  • 김상태;이승재;강상희;진보건;윤상현;이태성
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제50권4호
    • /
    • pp.157-165
    • /
    • 2001
  • The two criteria to identify the disturbances of the power transformer has been reported in this paper. They have been derived through EMTP simulations of internal faults, inrush and overexcitation for the model of 154/22.9[kV], 40[MVA], Y-Y three-phase power transformer. We propose the crisp algorithm which uses two criteria. A series of test results clearly indicate that the method can identify not only an internal fault but also the other transients. The average of relay operation times is about 7.2[ms]. The proposed algorithm immunes to the transient state.

  • PDF

$Y-{\Delta}$ 변압기 보호용 수정 전류차동 계전기 (Modified Current Differential Relay for $Y-{\Delta}$ Transformer Protection)

  • 김은숙;강용철
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권3호
    • /
    • pp.95-101
    • /
    • 2006
  • This paper proposes a modified current differential relay for $Y-{\Delta}$ transformer protection. The relay uses the same restraining current as a conventional relay, but the differential current is modified to compensate for the effects of the exciting current. A method to estimate the circulating component of the delta winding current is proposed. To cope with the remanent flux, before saturation, the core-loss current is calculated and used to modify the measured differential current. When the core then enters saturation, the initial value of the flux is obtained by inserting the modified differential current at the start of saturation into the magnetization cure. Thereafter, the core flux is then derived and used in conjunction with the magnetization curve to calculate the magnetizing current. A modified differential current is then derived that compensates for the core-loss and magnetizing currents. The performance of the proposed differential relay was compared against a conventional differential relay. Test results indicate that the modified relay remained stable during severe magnetic inrush and over-excitation, because the exciting current was successfully compensated. This paper concludes by implementing the relay on a hardware platform based on a digital signal processor. The relay does not require additional restraining signal and thus cause time delay of the relay.

Estimation of the Separate Primary and Secondary Leakage Inductances of a Y-Δ Transformer Using Least Squares Method

  • Kang, Yong-Cheol;Lee, Byung-Eun;Hwang, Tae-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • 제5권4호
    • /
    • pp.538-544
    • /
    • 2010
  • This paper proposes an estimation algorithm for the separate primary and secondary leakage inductances of a three phase $Y-\Delta$ transformer using least squares method. The voltage equations from the primary and secondary windings are combined into a differential equation to estimate the separate primary and secondary leakage inductances in order to use the line current of the delta winding. Separate primary and secondary leakage inductances are obtained by applying least squares method to the differential equation. The performance of the proposed algorithm is validated under transient states, such as magnetic inrush and overexcitation, as well as in the steady state with various cut-off frequencies of low-pass filter. The proposed technique can accurately generate separate leakage inductances both in the steady and transient states.

Protective Relaying Algorithm for 3-Phase Power Transformer Protection based on Fuzzy Decision Making

  • Kim, Sang-Tae;Lee, Seung-Jae;Kang, Sang-Hee;Park, Myeon-Song;Yoon, Sang-Hyun;Lee, Tae-Sung
    • KIEE International Transactions on Power Engineering
    • /
    • 제12A권1호
    • /
    • pp.26-30
    • /
    • 2002
  • The four fuzzy criteria to distinguish the internal fault from the inrush fur the power transformer protection have been identified. They are based on the wave shape, terminal voltage, fundamental and second harmonic component of differential current. systematic way to determine the associated fuzzy membership function is also proposed.

EMTP-RV를 이용한 변압기 여자돌입전류 모델링 (Modeling of Transformer Inrush Current using EMTP-RV)

  • 서훈철;여상민;김철환;유영식;조범섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.610-611
    • /
    • 2007
  • 본 논문은 EMTP-RV를 이용하여 변압기 여자돌입전류를 모델링하는 방법을 제시하였다. 우선, 변압기 여자돌입전류의 특성을 조사하였다. 그 다음으로, EMTP-RV의 변압기의 모델링 방법을 분석하여 변압기 여자돌입전류 모델링을 위한 적절한 방법을 선택하였다. 마지막으로, 다양한 조건에 대하여 여자돌입전류를 모델링하여 그 방법의 적합성을 증명하였다.

  • PDF

지상변압기의 내부 보호장비 작동을 위한 MCA 보호협조에 대한 연구 (A study on Protective Coordination of MCA for Performing of the Pad Mounted Transformer's inside Protective Device)

  • 현승윤;김창환
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제8권1호
    • /
    • pp.5-7
    • /
    • 2022
  • KEPCO's plan is undergoing a trial operation to replace the open-loop section with ring main units configuration where underground distribution lines are installed, by linking the multi-way circuit breakers auto (MCA) on the power side of each pad-mounted transformer. However, ring main units application mentioned above may cause the ripple effects, when implementing the configuration without a study of protection coordination. Because ring main units with classical pre-set protection devices contribution in fault condition didn't consider yet. For the reliable ring main units operation, it is necessary to resolve several protection issues such as the protection coordination with substation side, prevention of the transformer inrush current. These issues can radically deteriorate the distribution system reliability Hence, it is essential to design proper protection coordination to reduce these types of problems. This paper presents a scheme of ring main units' configuration and MCA's settings of time-current curves to preserve the performance of protection coordination among the switchgears considering constraints, e.g. prevention of the ripple effects (on the branch section when a transformer failure occurs and the mainline when a branch line failure occurs). It was confirmed that the propagation of the failure for each interrupter segment could be minimized by applying the proposed TCC and the interrupter settings for the MCAs (branch, transformer). Further, it was verified that the undetected area of the distribution automation system (DAS) could be supplemented by having the MCA configurated ring main units operate first, instead of the internal protection equipment in the transformer such as the fuse, STP when a transformer failure occurs.