• Title/Summary/Keyword: Train Scheduling

Search Result 46, Processing Time 0.024 seconds

A Study on Database System for Hostorical Booking of Korean Railroad (한국철도의 예약실적 데이터베이스 시스템에 관한 연구)

  • Oh, Seog-Moon;Hwang, Jong-Gyu;Hyeon, Seung-Ho;Kim, Yong-Gyu;Lee, Jong-Woo;Kim, Young-Hoon;Hong, Soon-Heum;Park, Jong-Bin
    • Proceedings of the KIEE Conference
    • /
    • 1998.07a
    • /
    • pp.371-374
    • /
    • 1998
  • The construction of the transportation history database system is to serve the scheduling and seat inventory controling. Recently, lots of countries have been faced with the advance era because of the new railway transportation system, like the high speed railway and/or magnetic levitation vehicle system. This can be reasonably translated as those of operators are willing to provide the more various and high quality schedule to the customer. Those operators these ideas make possible to forecast that scheduling process is going to be complicated more and more. The seat inventory control, so to speak Yield Management System(YMS), goes a long way to improve the total passenger revenue at the railway business. The YMS forecasts the number of the last reservation value(DCP# END) and recommends the optimal values on the seat sales. The history database system contains infra-data(ie, train, seat, sales) that will be the foundation of scheduling and seat inventory control application programs. The development of the application programs are reserved to the next step. The database system is installed on the pc platform (IBM compatible), using the DB2(RDBMS). And at next step, the platform and DBMS will be considered whether they can meet the users' requirement or not.

  • PDF

A Comparative Study of the Flexible Moving Block System and the Fixed Block System in Urban Railway (도시철도에 있어 이동폐색방식과 고정폐색방식의 상호비교 연구)

  • Jeong, Gwangseop;Park, Jeongsoo;Won, Jaimu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.723-730
    • /
    • 2006
  • Recently, The flexible moving block system in train operation has been introduced to the worldwide rail transportation markets. This paper is a comparative study of the conventional fixed block systems effects and the flexible moving block system on train operating time saving. Based on the literature review, the new algorithm is developed. It is to calculate the optimum headway time of the train. The proposed algorithm can overcome some of the existing algorithm problems, such as the limits of the data and unaware of the rail characteristic. The total travel time saving effect has been analyzed by applying the skip stop scheduling system to the each block system. The results of this study indicated that the total travel time is approximately 40% decreased and the schedule velocity is approximately 24% improved when the moving block system is applied. The results of this study could be used as a theoretical basis for the selection of rail signal system in Seoul's subway number 2 line.

Fatigue Reliability and Remaining Fatigue Life of Existing Steel Rail-Road Bridges (강철도교의 피로신뢰성과 잔존피로수명)

  • 조효남;신재철;허상구
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1989.04a
    • /
    • pp.11-16
    • /
    • 1989
  • This paper presents a fatigue reliability model for the reliability-based evaluation of remaining fatigue life of existing rail-road bridges. It is demonstrated that the simple fatigue reliability model based on the Weibull distribution of fatigue life can be extended by incorporating various effects due to the rate of the train-traffic increase and in-service Inspections. The paper also suggests the system fatigue reliability analysis using an approximate formulation and 2nd-order bound solutions. The application of the proposed model to existing rail-road brdiges based on field load tests shows that it may be practically used for the assessment of fatigue reliability, remaining life, and in-service inspection scheduling of existing rail-road bridges.

  • PDF

Prediction of Concrete Strength Using Artificial Neural Networks (인공신경망을 이용한 콘크리트 강도 추정)

  • 이승창;안정찬;정문영;임재홍
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.997-1002
    • /
    • 2002
  • Traditional prediction models have been developed with a fixed equation form based on the limited number of data and parameters. If new data is quite different from original data, then the model should update not only its coefficients but also its equation form. However, artificial neural network (ANN) does not need a specific equation form. Instead of that, it needs enough input-output data. Also, it can continuously re-train the new data, so that it can conveniently adapt to new data. Therefore, the purpose of this paper is to develop the I-PreConS (Intelligent system for PREdiction of CONcrete Strength using ANN) that provides in-place strength information of the concrete to facilitate concrete form removal and scheduling for construction.

  • PDF

A Study on Verification of PowerRail based on Voltage Drop under Extended Feeding Condition (연장급전 전압강하 계산을 위한 전기철도 급전 시뮬레이터의 검증에 관한 연구)

  • Kim, Joorak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.331-337
    • /
    • 2015
  • The power flow analysis of electrified railway is required complicated calculation, because of variable load. Train runs trough rail supplied by electric power therefore, the load value in electrified railway system fluctuates along time. The power flow algorithm in electrified railway system is different from general power system, and the power flow simulation is peformed by the particular simulation software. Powerail is simulation software for analysis of traction power supply system developed by KRRI, in 2008. This consists of load forecasting module, including TPS and time scheduling, and power flow module. This software was verified by measured current under normal feeding condition, however, has not been verified by voltage on the condition of extended feeding. This paper presents the verification of PowerRail based on voltage drop under extended feeding condition. This is performed by comparing simulation result with field test. Field test and simulation is done in commercial railway line.

Improvement of inspection system for common crossings by track side monitoring and prognostics

  • Sysyn, Mykola;Nabochenko, Olga;Kovalchuk, Vitalii;Gruen, Dimitri;Pentsak, Andriy
    • Structural Monitoring and Maintenance
    • /
    • v.6 no.3
    • /
    • pp.219-235
    • /
    • 2019
  • Scheduled inspections of common crossings are one of the main cost drivers of railway maintenance. Prognostics and health management (PHM) approach and modern monitoring means offer many possibilities in the optimization of inspections and maintenance. The present paper deals with data driven prognosis of the common crossing remaining useful life (RUL) that is based on an inertial monitoring system. The problem of scheduled inspections system for common crossings is outlined and analysed. The proposed analysis of inertial signals with the maximal overlap discrete wavelet packet transform (MODWPT) and Shannon entropy (SE) estimates enable to extract the spectral features. The relevant features for the acceleration components are selected with application of Lasso (Least absolute shrinkage and selection operator) regularization. The features are fused with time domain information about the longitudinal position of wheels impact and train velocities by multivariate regression. The fused structural health (SH) indicator has a significant correlation to the lifetime of crossing. The RUL prognosis is performed on the linear degradation stochastic model with recursive Bayesian update. Prognosis testing metrics show the promising results for common crossing inspection scheduling improvement.