• Title/Summary/Keyword: Track Settlement

Search Result 139, Processing Time 0.027 seconds

Evaluation of Foundation Settlement of Gyungbu High Speed Concrete Track Under Construction (건설 중인 경부고속철도 콘크리트궤도 기초침하 평가)

  • Kim, Dae-Sang;Yoo, Chung-Hyun;Kim, Hwan-Ki
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.365-370
    • /
    • 2007
  • Foundation settlements(settlements at the embankment surface and ground) has been evaluating to satisfy the strict allowable residual settlement level from the start of the construction of Gyungbu high speed railway. This is because both embankment and ground settlement could be important to minimize the residual settlement after the construction of concrete track. Ground settlement is caused by the increase of effective stress resulting from embankment. The causes of embankment settlement could be come from different sources, for example, the increase of effective stress, rainfall, creep behaviors. Based on the field measured data, this paper analysed the settlement of ground and embankment settlement. The biggest settlement at the embankment surface was 9.7mm during 246days at the STA 000k922.5. The calculated settlement of embankment itself was 8.6mm at the same places. These results conclude that the compressive settlement of embankment could not negligible.

  • PDF

Long-term Settlement Prediction of Railway Concrete Track Based on Recurrent Neural Network (RNN) (순환신경망을 활용한 콘크리트궤도의 장기 침하 거동 예측)

  • Kim, Joonyoung;Lee, Su-Hyung;Choi, Yeong-Tae;Woo, Sang Inn
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.3
    • /
    • pp.5-14
    • /
    • 2020
  • The railway concrete track has been increasingly adopted for high-speed train such as KTX due to its high running stability, improved ride quality for the passengers, and low maintenance cost. However, excessive settlement of the railway concrete track has been monitored at embankment sections of the ◯◯ High-speed Line, resulting in the concerns on the safety of railway operation. In order to establish an effective maintenance plan for the concrete track railway exceeding the allowable residual settlement, it is essential to reasonably predict their long-term settlement behavior during the public period. In this study, we developed a model for predicting the long-term settlement behavior of concrete track using recurrent neural network (RNN) and examined the applicability of the developed model.

Research directions for maintenance criteria in Slab Track (콘크리트궤도 유지보수기준 정립을 위한 연구방향)

  • Eom, Jong-Woo;Lee, Myung-Suk;Kwon, Jin-Soo;Kim, Soo-Jung
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.979-987
    • /
    • 2011
  • The Ballast Track has been widely applied in traditionally due to low initial cost and abundant elastic property. But the disadvantages of Ballast track are; labor-intensive and costly maintenance, weak in high-speed and heavy axial load, in additionally need wide cross section of tunnel and massive substructure in viaduct. Therefore, recent applications tend to more and more towards slab track such as Gyeungbu high speed rail and existing line. The slab track increased the stability, resistance and durability of track, and save maintenance cost compare to the Ballast Track. But the slab track have weakness of track elongation by sub-ballast differential settlement and that threat safety of train operation. Therefor the slab track need to prevent cracks in concrete ballast for insure the durability of slab track. In this paper, review main items and its expected effects of the slab track maintenance standards that control sub-ballast settlement and concrete ballast cracks.

  • PDF

The Displacement Limit at the End of an Approach Slab for a Railway Bridge with Ballastless Track (콘크리트궤도 부설 교량의 접속슬래브 단부 처짐한도에 관한 연구)

  • Choi, Jin-Yu;Yang, Shin-Chu
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.2
    • /
    • pp.195-202
    • /
    • 2008
  • The transition area between a bridge and an earthwork is one of the weakest area of track because of the track geometry deterioration caused unequal settlement of backfill of abutment. In case of a ballastless track, the approach slab could be installed to prevent such a phenomenon. But, if there is occurred the inclined displacement on the approach slab by a settlement of the foundation or formation, the track is also under the inclined displacement. And this defect causes reducing the running stability of a vehicle, the riding comfort of passengers, and increasing the track deteriorations by excessive impact force acting on the track. In this study, parametric studies were performed to investigate the displacement limit on the approach slab to avoid such problems. The length and the amount of unequal settlement of approach slab were adopted as parameter for numerical analysis considering vehicle-track interaction. Car body accelerations, variations of wheel force, stresses in rail, and uplift forces induced on fastener clip were investigated. From the result, resonable settlement limit on the end of an approach slab according to slab length was suggested.

A Study on the Assessment of Track Stabilization on Ballast Cleaning work site (크리너 작업구간 선로안정화 상태평가에 관한 연구)

  • Jeon, Il-Sik;Lee, Syeung-Youl;Choi, Hyoung-Su;Kim, Han-Chip
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.268-274
    • /
    • 2011
  • In railway, Ballast plays an essential role as intermedium in transmitting train load to subgrade safely. Gyoung-Bu HSL 1st phase consists of ballasted track except for over 5km long tunnels. Ballast track occurred track irregularity by train loads and requires periodic maintenance work. However, Repetitive train operation and tamping work cause to accelerate track irregularity and ballast deterioration such as abrasion and crushing. For these reason, Track irregularity areas had occurred ballast cleaning work to improve track quality. However, for the train to run safety, ballast cleaner working area needs train speed reduction and track stabilization work due to ballast relaxation and initial settlement. In this study, according to train speed-up and cumulative traffic tonnage, we measured and analyzed the track settlement and acceleration of sleepers to evaluate of track stabilization in order to keep the ballast condition stable after cleaning work.

  • PDF

Experimental Study on Characteristics of Track Settlement Depending on Components of Ballast Track (자갈도상 궤도 구성품에 따른 궤도 침하 특성에 대한 실험적 연구)

  • Kim, Man-Cheol;Bae, Young-Hoon;Lee, Si-Yong;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.498-505
    • /
    • 2016
  • As a basic study to develop maintenance-effective optimal ballast track in preparation for upgrading a conventional line to a high speed railway, a full-scale test that combined the components of ballast track was conducted and the characteristic of track settlement was analyzed. As a result of the full-scale test, reduction in maintenance via an increase of the elasticity of only the pad was insignificant; however, the effect increased significantly with increasing of the weight of the sleeper or with increasing of the weight of the sleeper and the thickness of the ballast together with use of a pad with high resiliency. An optimal type of ballast track, in line with upgrading the speed of a conventional line, shall be developed through cost efficiency analysis considering the maintenance cost depending on the track settlement as well as the initial construction cost.

A Study on the Compaction Characteristics of Crushed Rock-soil Mixture for Railway Subgrade (암버럭-토사 혼합성토재 철도노반의 다짐특성 연구)

  • Kim, Dae-Sang;Park, Seong-Yong;Song, Jong-Woo;Kim, Soo-Il;Song, Jae-Joon
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.2
    • /
    • pp.183-189
    • /
    • 2009
  • The track structure of Gyungbu High Speed Railway line from Daegu to Busan is concrete track. It has a very strict specification for residual settlement because of its rigid type structural characteristics. The residual settlement of it comes from the residual settlement of the subgrade and the ground. The residual settlement of railway subgrade composed of crushed rock and soil might be major parts of total residual settlement depending on the field compaction qualities. Therefore, it is a key to minimize the residual settlement of the subgrade for a successful concrete track construction. In this paper, total 31 large scale compaction tests were performed to understand the compaction behaviors of the crushed rock-soil mixture. The test specimens were constituted with soil, crushed shale and mudstone taken from two sites under construction. The compaction tests were performed with the variations of rock types, #4 sieve passing contents, maximum particle size, and moisture contents. The influence of those factors on maximum dry unit weights of crushed rock-soil mixture was evaluated.

Analysis of Settlement and Stress Characteristics about Influence of Track Parameters on Railroad Roadbed by using GEOTRACK (GEOTRACK을 이용한 궤도변수에 따른 침하 및 응력 특성 분석)

  • Shin, Eun-Chul;Lee, Han-Jin;Kang, Jeong-Gu;Yang, Hee-Saeng
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.395-403
    • /
    • 2007
  • Railroad track consists of relatively simple structures such as rail, sleeper, ballast. Roadbed shares vertical pressure by train load which passed through rail to ballast as base that supports the track. For evaluating stress and displacement of roadbed due to the railroad load is an important role on the track as a basic data for estimation of the durability and design of the roadbed thickness. GEOTRACK program applied multi-layered theory was developed for analyzing railroad track structure. GEOTRACK program is a sort of numerical analysis program which has advantage that can analysis component of track by simple method. In this study, this program was used to preform the numerical analysis by changing track conditions and roadbed conditions such as tie, reinforced roadbed, dynamic wheel load, Resilient modulus and so on. Further detail will be presented on the paper.

  • PDF

A Method for the Analysis of Train/Slab-Track Interaction on Settled Roadbed (슬래브궤도 노반침하구간 차량/궤도 상호작용 해석기법 개발)

  • Yang, Sin-Chu;Hong, Chul-Kee
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.296-305
    • /
    • 2007
  • A numerical method for the analysis of train/slab-track interaction on the settled roadbed is developed based on the already developed analysis method of train/ballast-track interaction. The concrete slabs composed of the upper track concrete layer and the lower hydraulic bonded layer are modelled by a equivalent beam. The supporting stiffness of roadbed is evaluated with the modified boussinesq method suggested by Eisenmann. The track irregularity and the gap between slab and roadbed induced by settlement of roadbed are calculated by the effective method newly presented in this study. The validation of the developed method is investigated by a numerical example. The effects of train speed on train and slab track on the settled roadbed with sinusoidal shape of wave length 20m and amplitude 20mm are reviewed.

Investigation of Settlement of Concrete Track on High-Speed Railway Due to Groundwater Variation (지하수위 변동에 따른 고속철도 콘크리트궤도의 침하 영향 검토)

  • Lee, Hyunjung;Choi, Yeong-Tae;Lee, Ilwha;Lee, Minsoo;Lee, TaeGyu
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.2
    • /
    • pp.248-256
    • /
    • 2017
  • Groundwater drawdown was pointed out as one of the causes of induced settlement on high speed railways, especially concrete track. In this study, the effect of groundwater variation on settlement was evaluated through a comparison of field measurements with numerical analysis results. A trial and error method, i.e., repeated numerical analyses by changing material properties, was used to calibrate the model. The model was applied to investigate the effect of groundwater drawdown, thickness of soft layer, and embankment height on residual settlement after concrete track completion. A soft layer thicker than 4m would result in more than 30mm of settlement; a detailed analysis of groundwater behavior thus should be conducted from the design stage to construction.