• Title/Summary/Keyword: Track

Search Result 6,086, Processing Time 0.031 seconds

Effect of Horizontal Load on the Performance of Track Roller (수평방향 하중이 트랙롤러의 특성에 미치는 영향)

  • Kang, Bo-Sik;Lee, Choong-Sung;Kim, Yong-Rae
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.40 no.8
    • /
    • pp.743-750
    • /
    • 2016
  • Track rollers are the key parts that support the weight applied to the caterpillar track of construction machinery. The operating conditions of construction machinery are harsh; hence, the track rollers exposed to these conditions can experience failures such as oil leakage and breakdown of the machine, because of impacts during driving. The failure of track-rollers has a major effect on the operation of the construction machinery. Therefore, each manufacturer tries to evaluate the performance of their products by conducting a self-test. However, only the vertical loads applied to the track rollers are considered in most of the self-tests. This method has the problem of ignoring the horizontal loads that are applied to the track rollers while rotary driving, and hence it does not create the practical operating condition of the construction machinery. In this study, we have determined the experimental conditions that effectively consider the magnitudes of the vertical and horizontal loads. The results of simulations and experiments conducted to assess the influence of horizontal loads on the failure of track rollers are presented in this paper.

A Guideline for Development of Track-Bridge Structural System with Sliding Layer to Reduce the Track-Bridge Interaction (궤도-교량 상호작용 저감을 위한 슬라이드 층이 고려된 궤도-교량 구조시스템의 개발 방향)

  • Yun, Kyung-Min;Choi, Shin-Hyung;Song, Dae-Seok;Lee, Kyung-Chan;Lim, Nam-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.2
    • /
    • pp.1469-1476
    • /
    • 2015
  • The bridges take a significant part of entire route in Korea railway, because 70% of Korean territory is covered with mountains. For this reason, span enlargement of railway bridges is more advantageous to increase economic efficiency on the bridge design. However there are many limitations such as additional axial force of the rail, excessive displacement due to track-bridge interaction. In this study, track-bridge interaction analysis was conducted considering the sliding layer which was installed between the track and girder. From the numerical analysis results, the behavior of track-bridge interaction was investigated according to the installation method of sliding layer. Finally, a guideline for development of track-bridge structure system to reduce the track-bridge interaction was proposed.

Influence of Vehicle Vibration on Track Geometry Measurement (차량 진동이 궤도 선형 측정에 미치는 영향)

  • Bae, Kyu-Young;Yong, Jae Chul;Kim, Lee-Hyeon;Kwon, Sam-Young
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.26 no.6_spc
    • /
    • pp.644-650
    • /
    • 2016
  • Track maintenance works based on track geometry recordings are essential to enhance the safety and comfort of railway transportation. Usually, the track irregularity has been measured by a special inspection trains which all were imported from abroad. Because the inspection train speed is limited under 160 km/h, it takes a long time to inspect railways and there is difficulty in daytime operation. To solve this problem, we started to develop a track geometry measuring system (TGMS) with measurement speed up to 300 km/h which can be installed in commercial vehicles such as HEMU-430X. In this paper, we introduce a newly developed inertial TGMS and propose two inertial navigation system (INS) algorithms (method A, B) for measuring track geometry. In order to investigate advantage and disadvantage of each algorithm, we performed vibration test of the TGMS, which was simulated by 6-axis shaking table. Through the vibration test, we analyzed the influence of vehicle vibration on the TGMS which will be installed on bogie frame. To the vibration test, two methods satisfied the required accuracy of track geometry measurement under the level of the actual vehicle vibration of HEMU-430X train. Theoretically, method A is sensitive to vehicle vibration than method B. However, HEMU-430X's bogie vibration frequency range is out of interest range of measurement system. Therefore, method A can also apply the HEMU-430X train.

Evaluation of Track Irregularity Effect due to Adjacent Excavation on Serviced Railway Line (철도시설물 인접굴착공사에 따른 운행선 궤도의 궤도틀림 영향 평가)

  • Choi, Jung-Youl;Park, Dong-Ryong;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.401-406
    • /
    • 2019
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, sleepers, and track elastic springs(ballast, rail pad). As a result of analyzing the track deformation level of the existing tracks due to the excavation work adjacent to the railway facilities, it was found that the track irregularity evaluation criteria (allowed values) of both conventional and high-speed railways lines were satisfied. Based on the numerical analysis using the track model, it was analyzed that the results of the prediction of the track irregularity due to the excavation work and the level of the track deformation occurring at the actual site could be approximated as closely as possible.

Effect of lateral differential settlement of high-speed railway subgrade on dynamic response of vehicle-track coupling systems

  • Zhang, Keping;Zhang, Xiaohui;Zhou, Shunhua
    • Structural Engineering and Mechanics
    • /
    • v.80 no.5
    • /
    • pp.491-501
    • /
    • 2021
  • A difference in subgrade settlement between two rails of a track manifests as lateral differential subgrade settlement. This settlement causes unsteadiness in the motion of trains passing through the corresponding area. To illustrate the effect of lateral differential subgrade settlement on the dynamic response of a vehicle-track coupling system, a three-dimensional vehicle-track-subgrade coupling model was formulated by combining the vehicle-track dynamics theory and the finite element method. The wheel/rail force, car body acceleration, and derailment factor are chosen as evaluation indices of the system dynamic response. The effects of the amplitude and wavelength of lateral differential subgrade settlement as well as the driving speed of the vehicle are analyzed. The study reveals the following: The dynamic responses of the vehicle-track system generally increase linearly with the driving speed when the train passes through a lateral subgrade settlement area. The wheel/rail force acting on a rail with a large settlement exceeds that on a rail with a small settlement. The dynamic responses of the vehicle-track system increase with the amplitude of the lateral differential subgrade settlement. For a 250-km/h train speed, the proposed maximum amplitude for a lateral differential settlement with a wavelength of 20 m is 10 mm. The dynamic responses of the vehicle-track system decrease with an increase in the wavelength of the lateral differential subgrade settlement. To achieve a good operation quality of a train at a 250-km/h driving speed, the wavelength of a lateral differential subgrade settlement with an amplitude of 20 mm should not be less than 15 m. Monitoring lateral differential settlements should be given more emphasis in routine high-speed railway maintenance and repairs.

Three-dimensional finite element analysis of the interference of adjacent moving trains resting on a ballasted railway track system

  • Marwah Abbas Hadi;Saif Alzabeebee;Suraparb Keawsawasvong
    • Geomechanics and Engineering
    • /
    • v.32 no.5
    • /
    • pp.483-494
    • /
    • 2023
  • High-speed trains became common nowadays due to the need for fast and safe mean to transport goods and people. However, the use of high-speed trains necessitates the examination of the critical speed, which is the train speed at which the maximum settlement of the railway track occurs. The critical speed and railway track settlement have been investigated considering only one train in previous studies. However, it is normal to have two adjacent trains moving at the same time. This paper aims to understand how the interference of two moving trains affects the settlement and critical speed of ballasted railway track. Calibrated three-dimensional finite element models of railway track subjected to one moving train and two moving trains have been developed to address the aim of the study. It is found that the interference dramatically increases the railway track settlement with a percentage increase ranges between 5 and 100%. It is also found that the percentage increase of the railway track settlement depends on the train speed and the distance between the moving trains. In addition, it is found that the thickness of the ballast layer and the stiffness of the subgrade have minor influence on the percentage increase of the settlement. Importantly, the results of this paper illustrate the importance of the interference of the moving trains on the dynamic response of the railway track. Thus, there is a need to consider the dynamic interaction between the adjacent moving trains in the design of railway track foundation.

Analysis of Allowable Settlement on Tracks of High Speed Railway (고속철도 궤도 종류에 따른 허용침하량 분석)

  • Kim, Young-Ho;Jeong, Sang-Seom;Seol, Hoon-Il;Han, Young-Ah
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.11
    • /
    • pp.25-34
    • /
    • 2008
  • An application of concrete track is being actively processed for the construction of Korean high speed railway. The concrete track has an advantage in decreasing the maintenance cost, whereas it has much difficulty controlling the long term settlement after settlement occurred. Therefore, the management and control of settlement are very important for the successful construction of concrete track. The purpose of this paper is to verify the allowable settlement between concrete track and ballast track, and piled raft foundation installation effects as settlement reducers for concrete track. Therefore, a series of 3D finite element analyses that take into account the allowable settlement were performed for major parameters such as soil condition, pile installation and loading type. Based on the analysis, it is shown that concrete track causes much smaller settlement than ballast track, and the effect of installation is necessary to effectively reduce the settlement of concrete track.

Analysis of nursing doctoral dissertation formats over a decade: A comparative research between traditional and publication format at a university (간호학 박사학위논문 제도의 출판 형식 도입 10년 현황 분석: 일 대학 학위과정의 전통 형식과 출판 형식의 비교)

  • Choi, Subin;Park, Jee-Eun;Woo, Kyungmi
    • The Journal of Korean Academic Society of Nursing Education
    • /
    • v.30 no.2
    • /
    • pp.101-112
    • /
    • 2024
  • Purpose: The study aimed to examine doctoral students' degree acquisition paths and postgraduate research achievements and explore whether there are differences in the research achievements of doctoral degree holders in relation to the dissertation format. Methods: This study is a retrospective cohort study of nursing doctoral graduates whose degree conferral dates were between August 2013 and August 2023 that compared two dissertation tracks: traditional and publication. We evaluated the proportion of graduates in each track, publication of their dissertations, time to graduation, and the number of peer-reviewed journal publications after graduation. Results: Of the sample, 160 (87.4%) graduated in the traditional track, with only 56 (35.0%) of them publishing their dissertations after graduation. Excluding dissertations, 114 of the graduates (71.3%) published first-authored articles in the traditional track, while 12 (52.2%) did so in the publication track. The time to graduation was significantly shorter in the traditional track, with an average of 5.47±2.45 years, compared to 6.61±2.57 years in the publication track (z=2.26, p=.023). In the traditional track, 64 of graduates (40.0%) majored in adult health nursing, whereas in the publication track, 8 (34.8%) studied community health nursing. Conclusion: This study emphasizes the significance of the publication track for nursing doctoral dissertations in terms of research dissemination. Despite its numerous advantages, it is not yet the preferred choice for both students and faculty. Maintaining the publication track as an additional graduation option is worthwhile, as it allows students to gain research publishing experience before graduation and to effectively disseminate scientific findings in nursing.

Comparative Analysis of Track-Bridge Interaction of Sliding Slab Track and Rail Expansion Joint for Long-Span Railway Bridge (장경간 철도 교량에 적용된 슬라이딩 궤도와 레일신축이음장치의 궤도-교량 상호작용 비교)

  • Lee, Kyoung Chan;Jang, Seung Yup;Lee, Jungwhee;Choi, Hyun Sung
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.29 no.2
    • /
    • pp.169-177
    • /
    • 2016
  • Sliding slab track system, which consists of low friction sliding layer between track slab and bridge deck, is recently devised to reduce track-bridge interaction effect of continuously welded rail(CWR) without applying special devices such as rail expansion joint(REJ). In this study, a series of track-bridge interaction analyses of a long-span bridge with sliding slab track and REJ are performed respectively and the results are compared. The bridge model includes PSC box girder bridge with 9 continuous spans, and steel-concrete composite girder bridge with 2 continuous spans. The total length of the bridge model is 1,205m, and the maximum spacing between the two fixed supports is 825m. Analyses results showed that the sliding slab track system is highly effective on interaction reduction since lower rail additional axial stress is resulted than REJ application. Additionally, horizontal reaction forces in fixed supports were also reduced compared to the results of REJ application. However, higher slab axial forces were developed in the sliding slab track due to the temperature load. Therefore, track slab section of the sliding slab track system should be carefully designed against slab axial forces.

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.405-411
    • /
    • 2009
  • Railway signaling system in a rapid transit using the ATC system the approved a speed limit to a train and a part of signaling system in a metro approved a distance which is possible to move. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.